Plan Review Details - Permit 03030699
Plan Review Stops For Permit 03030699
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2003-03-28 Cont ID  
Sent By jleech Date 2003-03-25 Time 17:27 Rev Time 3.00
Received By lsmith Date 2003-03-28 Time 11:02 Sent To  
Notes
2003-03-28 00:00:00****************PROVISO*************
  
 1. STRUCTURE IS LOCATED IN AN AO FLOOD
 ZONE.AN ELEVATION CERTIFICATE IS
 REQUIRED AT TIME OF C/O.

Review Stop E ELECTRICAL
Rev No 3 Status P Date 2003-08-26 Cont ID  
Sent By btrobaug Date 2003-08-26 Time 12:36 Rev Time 0.50
Received By btrobaug Date 2003-08-26 Time 12:18 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status F Date 2003-08-19 Cont ID  
Sent By csiegber Date 2003-08-22 Time 10:42 Rev Time 0.25
Received By dpalmer Date 2003-08-19 Time 06:34 Sent To  
Notes
2003-08-19 00:00:00*************** UNSAT **************
  
 1)NOTE: PLEASE COMPLETE RISER DIAGRAM
 TO INCLUDE PANEL.
  
 2)NOTE: PLEASE VERIFY SIZE OF PANEL,
 SERVICE CONDUCTORS ARE SHOWN FOR A 200A
 SERVICE?
  
 3)NOTE: PLEASE SEE THAT WASHER IS SHOWN
 AS OPTIONAL? PLEASE SEE 220.16 AND
 FBC/PLUMB. WASHER IS REQ'D AND MUST BE
 AVAILABLE.
  
 4)NOTE: PLEASE SEE GROUNDING ELECTRODE
 CONDUCTOR, NOTE TO HOUSE STEEL, PLEASE
 SEE 250.50, THIS SHOULD NOTE TO FOOTER
 STEEL.
  
 PLEASE SUBMIT THE ABOVE INFORMATION FOR
 REVIEW. IF THERE ARE ANY QUESTIONS,
 PLEASE CALL.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 561-805-6717
 [email protected]

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2003-03-24 Cont ID  
Sent By alange Date 2003-08-18 Time 10:30 Rev Time 0.50
Received By btrobaug Date 2003-03-24 Time 08:19 Sent To P
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2003-08-22 Cont ID  
Sent By csiegber Date 2003-08-22 Time 10:42 Rev Time 0.00
Received By csiegber Date 2003-08-22 Time 10:42 Sent To E
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2003-08-18 Cont ID  
Sent By alange Date 2003-08-18 Time 10:29 Rev Time 0.00
Received By alange Date 2003-08-18 Time 10:29 Sent To E
Notes
2003-08-18 00:00:00TO DP DESK

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2003-08-01 Cont ID  
Sent By alange Date 2003-08-01 Time 10:13 Rev Time 0.00
Received By alange Date 2003-08-01 Time 10:13 Sent To M
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2003-03-11 Cont ID  
Sent By sthyng Date 2003-03-11 Time 08:37 Rev Time 0.00
Received By sthyng Date 2003-03-11 Time 08:37 Sent To Z
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2003-08-09 Cont ID  
Sent By hmoser Date 2003-08-09 Time 14:38 Rev Time 0.50
Received By hmoser Date 2003-08-09 Time 14:38 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2003-03-25 Cont ID  
Sent By alange Date 2003-08-01 Time 10:13 Rev Time 0.33
Received By jleech Date 2003-03-25 Time 17:27 Sent To B
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2003-03-25 Cont ID  
Sent By btrobaug Date 2003-03-24 Time 08:47 Rev Time 0.25
Received By jleech Date 2003-03-25 Time 17:26 Sent To M
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2003-03-28 Cont ID  
Sent By sthyng Date 2003-03-14 Time 08:37 Rev Time 0.50
Received By lsmith Date   Time   Sent To E
Notes
2003-03-28 00:00:00PER SG 3/14/03 LS


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved