Plan Review Stops For Permit 03020319 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
4 |
Status |
P |
Date |
2003-05-06 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2003-05-06 |
Time |
17:31 |
Rev Time |
0.50 |
Received By |
jgomez |
Date |
2003-05-06 |
Time |
17:31 |
Sent To |
|
|
Notes |
2003-05-06 00:00:00 | STORM SHUTTERS, HANDRAIL CLARIFICATION. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
3 |
Status |
P |
Date |
2003-04-15 |
|
|
Cont ID |
|
Sent By |
shernand |
Date |
2003-05-05 |
Time |
14:06 |
Rev Time |
1.00 |
Received By |
jgomez |
Date |
2003-04-15 |
Time |
16:03 |
Sent To |
|
|
Notes |
2003-04-15 00:00:00 | ENERGY CALCULATIONS AND SOIL TEST REPORT | | SUBMITTED. SEE PROVISO DATED 4-2-03 FOR | | OUTSTANDING ITEMS. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
P |
Date |
2003-04-02 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2003-04-02 |
Time |
15:46 |
Rev Time |
2.00 |
Received By |
jgomez |
Date |
2003-04-02 |
Time |
15:46 |
Sent To |
E |
|
Notes |
2003-04-02 00:00:00 | BUILDING REVIEW APPROVED WITH PROVISO: | | 1-ENERGY CALCULATIONS TO HAVE ENGINEER'S | | ORIGINAL SEAL AND SIGNATURE AS REQ'D | | BY CHAPTER 471 FLORIDA STATUTES WHEN | | SUBMITTING DOCUMENTS FOR PUBLIC RECORD | | 2-PROVIDE SOIL TEST REPORT WITH ORIGINAL | | SIGNATURE AND SEAL. CHAPTER 471 FL.ST. | | 3-STORM SHUTTERS: SEE ENGINEERED DWGS | | AND REVISE INSTALLATION SCHEDULE AS | | REQUIRED. CHECK DESIGN PRESSURES, | | PANEL MAX. SPAN, ANCHOR TYPE & SPACING | | AND MOUNTING CONDITIONS AND CONNECTION | | TYPE. | | 4-SHEET A-4: SEE STAIR SECTION B/A-4 AND | | CLARIFY NOTES #1 AND #8. SEE SECTION | | 1007.5.1 FBC 2001. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2003-02-24 |
|
|
Cont ID |
|
Sent By |
pkrauss |
Date |
2003-04-01 |
Time |
11:51 |
Rev Time |
2.00 |
Received By |
jgomez |
Date |
2003-02-24 |
Time |
14:25 |
Sent To |
|
|
Notes |
2003-02-24 00:00:00 | BUILDING REVIEW CHECKLIST: | | 1-FLOOD ZONE A8. WILL NEED TO PROVIDE | | THE ELEVATION CERTIFICATE. | | 2-NEED RECORDED NOTICE OF COMMENCEMENT. | | 3-SHEET A-4: REVISE STAIR KEY NOTE #1. | | SEE SECTION 1007.5.1 FBC 2001 FOR | | REQUIRED HANDRAIL HEIGHT. | | **ALSO, REVISE HANDRAIL HEIGHT SHOWN ON | | STAIR SECTION B/A-4. | | 4-SHEET A-4: SPECIFY FIREBLOCKING | | MATERIAL AND LOCATION. SEE SECTION | | 2305.1.4 FBC 2001. | | **NOTE: FIREBLOCKING AND DRAFSTOPPING | | ARE NOT THE SAME THING. REVISE NOTE | | #14 AS REQUIRED. | | 5-PROVIDE GENERAL SPECS FOR FIREBLOCKING | | AT ALL CONCEALED SPACES. SEE SECTION | | 2305.1.4 FBC 2001. | | 6-SHEET A-5: SIZE OF VENT ON NOTE #14 | | DOESN'T MATCH VENTILATION CALCULATIONS | | REVISE AS REQUIRED. | | 7-CLARIFY SIZE OF BUCKET SHOWN ON DETAIL | | S6. SEE GIRDER TRUSS SIZE. SECTION | | 104.2.1.2 CITY AMENDMENTS TO FBC 2001. | | 8-DETAIL S21 DOESN'T MATCH CONDITIONS | | SHOWN ON SECOND FLOOR FRAMING PLAN. | | REVISE AS REQUIRED. SEC. 104.2.1.2 | | CITY AMENDMENTS TO FBC 2001. | | 9-SHOW NAILING ZONES IN ROOF FRAMING | | PLAN. SEE SEC. 2306.1 CITY AMENDMENTS | | TO FBC 2001. | | 10-REVISE/UPDATE TRUSS ANCHOR SCHEDULE | | TO MATCH USP PUBLISHED CATALOGUE. SEC. | | 104.2.1.2 CITY AMENDMENTS TO FBC 2001. | | 11-PROVIDE FIRECUT SPECIFICATIONS ON | | STRUCTURAL WALL SECTIONS. SECTION | | 2305.4 FBC 2001. | | 12-DETAIL SECTION S2 HAS OVERLAPPING | | INFORMATION. REVISE AS REQUIRED. | | 13-DETAIL F14: SPECIFY HOW MUCH EMBED- | | MENT FOR ANCHOR BOLTS. SEC. 104.2.1.2 | | CITY AMENDMENTS TO FBC 2001. | | 14-PROVIDE 2X STRUCTURAL BUCK DETAIL FOR | | FRAMED OPENINGS TO RECEIVED ARCHED | | WINDOWS. SEC. 104.2.1.2 CITY AMENDMENT | | TO FBC 2001. | | 15-PROVIDE COMPLETE INFORMATION FOR | | STORM SHUTTERS OR APPLY FOR A SEPARATE | | PERMIT. | | 16-SECOND FLOOR FRAMING PLAN IS MISSING | | SOME CONNECTORS. EG. SPECIFY CONNECTOR | | FOR GIRDER TRUSSES. SEE PLANS FOR | | COMMENTS. SEC. 104.2.1.2 CITY | | AMENDMENTS TO FBC 2001. |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
3 |
Status |
P |
Date |
2003-09-25 |
|
|
Cont ID |
|
Sent By |
btrobaug |
Date |
2003-09-25 |
Time |
16:26 |
Rev Time |
0.33 |
Received By |
btrobaug |
Date |
2003-09-25 |
Time |
16:16 |
Sent To |
|
|
Notes |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
2 |
Status |
P |
Date |
2003-04-03 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2003-09-19 |
Time |
12:17 |
Rev Time |
0.25 |
Received By |
dpalmer |
Date |
2003-04-03 |
Time |
12:41 |
Sent To |
|
|
Notes |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
P |
Date |
2003-02-20 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2003-04-02 |
Time |
15:46 |
Rev Time |
0.25 |
Received By |
dpalmer |
Date |
2003-02-20 |
Time |
18:43 |
Sent To |
B |
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
6 |
Status |
N |
Date |
2003-09-25 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2003-09-25 |
Time |
09:46 |
Rev Time |
0.00 |
Received By |
csiegber |
Date |
2003-09-25 |
Time |
09:45 |
Sent To |
M |
|
Notes |
2003-09-25 00:00:00 | TO PK BOX |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
5 |
Status |
N |
Date |
2003-09-19 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2003-09-19 |
Time |
12:17 |
Rev Time |
0.00 |
Received By |
csiegber |
Date |
2003-09-19 |
Time |
12:17 |
Sent To |
E |
|
Notes |
2003-09-19 00:00:00 | TO BT DESK |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
4 |
Status |
N |
Date |
2003-05-08 |
|
|
Cont ID |
|
Sent By |
shernand |
Date |
2003-05-08 |
Time |
13:40 |
Rev Time |
0.00 |
Received By |
shernand |
Date |
2003-05-08 |
Time |
13:40 |
Sent To |
P |
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2003-05-05 |
|
|
Cont ID |
|
Sent By |
shernand |
Date |
2003-05-05 |
Time |
14:06 |
Rev Time |
0.00 |
Received By |
shernand |
Date |
2003-05-05 |
Time |
14:06 |
Sent To |
B |
|
Notes |
2003-05-05 00:00:00 | JGOMEZ DESK |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2003-03-27 |
|
|
Cont ID |
|
Sent By |
sthyng |
Date |
2003-03-27 |
Time |
08:13 |
Rev Time |
0.00 |
Received By |
sthyng |
Date |
2003-03-27 |
Time |
08:13 |
Sent To |
M |
|
Notes |
2003-03-27 00:00:00 | TO MECH IN BOX |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2003-02-06 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2003-02-06 |
Time |
12:44 |
Rev Time |
0.00 |
Received By |
dpalmer |
Date |
2003-02-06 |
Time |
12:44 |
Sent To |
Z |
|
Notes |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
3 |
Status |
P |
Date |
2003-09-30 |
|
|
Cont ID |
|
Sent By |
pkrauss |
Date |
2003-09-30 |
Time |
07:53 |
Rev Time |
0.20 |
Received By |
pkrauss |
Date |
2003-09-30 |
Time |
07:53 |
Sent To |
|
|
Notes |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
2 |
Status |
P |
Date |
2003-04-01 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2003-09-25 |
Time |
09:46 |
Rev Time |
0.35 |
Received By |
pkrauss |
Date |
2003-04-01 |
Time |
11:21 |
Sent To |
B |
|
Notes |
2003-04-01 00:00:00 | MECHANICAL PERMIT 03020323 |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
1 |
Status |
F |
Date |
2003-02-19 |
|
|
Cont ID |
|
Sent By |
sthyng |
Date |
2003-03-27 |
Time |
08:13 |
Rev Time |
0.25 |
Received By |
hmoser |
Date |
2003-02-19 |
Time |
19:27 |
Sent To |
E |
|
Notes |
2003-02-19 00:00:00 | PLAN DENIED | | 1) ENERGY PERFORMANCE LEVEL DISPLAY CARD | | AND ENERGY CALCULATIONS DO NOT MATCH. | | 2) EQUIPMENT SELESTION ON MANUAL (J) NOT | | COMPLETE. | | 3) COOLING & HEATING BTU.ON MANUAL (J) | | DO NOTMATCH PLANS. | | PLAN REVIEW BY HAROLD MOSER | | (561)689-8096 EXT.8390 |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
2 |
Status |
P |
Date |
2003-05-20 |
|
|
Cont ID |
|
Sent By |
kstevens |
Date |
2003-05-20 |
Time |
07:09 |
Rev Time |
0.33 |
Received By |
kstevens |
Date |
2003-05-19 |
Time |
18:53 |
Sent To |
|
|
Notes |
2003-05-20 00:00:00 | REVISION OK - ADDED SANT. RISER DIAGRAM |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
N |
Date |
2003-02-10 |
|
|
Cont ID |
|
Sent By |
shernand |
Date |
2003-05-08 |
Time |
13:40 |
Rev Time |
0.33 |
Received By |
kstevens |
Date |
2003-02-10 |
Time |
12:26 |
Sent To |
M |
|
Notes |
2003-02-10 00:00:00 | COVER SHEET INDEX CALLS FOR AN MP-1 | | SHEET AND AN MP-2 SHEET BUT NOTE THAT | | NONE WERE FOUND. | | | | REVIEW BY KEN STEVENS | | (561) 659-8096 EXT 8377 |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
P |
Date |
2003-02-06 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2003-02-06 |
Time |
12:44 |
Rev Time |
0.00 |
Received By |
sgraham |
Date |
|
Time |
|
Sent To |
P |
|
Notes |
|
|