Plan Review Stops For Permit 03020277
Review Stop B BUILDING (STRUCTURAL)
Rev No 5 Status P Date 2003-06-18 Cont ID  
Sent By jgomez Date 2003-06-18 Time 18:20 Rev Time 0.33
Received By jgomez Date 2003-06-18 Time 18:20 Sent To  
Notes
2003-06-18 00:00:00STORM SHUTTERS PROVISO:
 1-ANCHORS TO BE AT 12"O.C.(NOT 12.5")
 WHEN EDGE DISTANCE IS 2". SEE ENG'D
 DRAWINGS.
 2-REVISE ANCHOR SPACING FOR ANCHORS IN
 WOOD FRAMING. SEE ENGINEERED DRAWINGS.

Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status P Date 2003-05-13 Cont ID  
Sent By shernand Date 2003-05-15 Time 16:42 Rev Time 0.50
Received By jgomez Date 2003-05-13 Time 17:46 Sent To  
Notes
2003-05-13 00:00:00ENERGY CALCS SUBMITTAL.

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2003-04-08 Cont ID  
Sent By shernand Date 2003-05-08 Time 14:26 Rev Time 2.00
Received By jgomez Date 2003-04-08 Time 15:49 Sent To  
Notes
2003-04-08 00:00:00BUILDING REVIEW APPROVED WITH PROVISO:
 1-PROVIDE UPDATED SBBCI PRODUCT APPROVAL
 #2229A THAT MATCHES ENGINEERED DWGS.
 ALSO, REVISE DESIGN PRESSURES. SEE
 ENGINEERED DWGS FOR MAX./MIN. PANEL
 SPAN ALLOWED ACCORDING TO THE DESIGN
 PRESSURES. SEC. 104.2.1.2 CITY AMEND.
 MENTS TO FBC 2001.
 2-REVISE DETAIL S-21 FOR COLUMN LOCATED
 BETWEEN GARAGE AND STAIRWAY.
  
 **NOTE: THIS IS NOT A TRUSS TO TRUSS
 CONNECTION. CLARIFY HOW IS COLUMN
 SUPPORTING THE TWO GIRDER TRUSSES.
 SEC. 104.2.1.2 CITY AMENDMENTS TO FBC.
  
 3-RE-SUBMIT ENERGY CALCULATIONS WITH
 ENGINEER'S ORIGINAL SIGNATURE AND SEAL
 AS REQUIRED BY CHAPTER 471 FLORIDA
 STATUTES AND SEC. 103.0 CHAPTER 13 FBC
 2001.

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2003-03-26 Cont ID  
Sent By shernand Date 2003-04-04 Time 10:16 Rev Time 0.25
Received By jgomez Date 2003-03-26 Time 12:10 Sent To  
Notes
2003-03-26 00:00:00SECOND CHECKLIST:
 1-NONE OF THE ITEMS ON FIRST CHECKLIST
 DATED 2-28-03 WERE ADDRESSED.
 SEE ATTACHED COPY OF THAT CHECKLIST.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2003-02-28 Cont ID  
Sent By btrobaug Date 2003-02-24 Time 17:01 Rev Time 2.00
Received By jgomez Date 2003-02-28 Time 17:47 Sent To  
Notes
2003-02-28 00:00:00BUILDING CHECKLIST:
 1-IMPACT FEES RECEIPT NUMBER DOESN'T
 MATCH NUMBER ON STAMPED DRAWINGS.
 PROVIDE MATCHING RECEIPT.
 2-PROVIDE COMPLETE INFORMATION FOR STORM
 SHUTTERS OR APPLY FOR SEPARATE PERMIT.
 3-DETAIL S21 DOESN'T APPLY TO COLUMN
 LOCATED BETWEEN GARAGE AND STAIRWAY.
 PROVIDE COMPLETE DETAIL SHOPWING HOW
 ARE STRAPS HOLDING THE TWO GIRDER
 TRUSSES AT THIS LOCATION. SECTION
 104.2.1.2 CITY AMENDMENTS TO FBC 2001.
 4-REVISE CONNECTOR TC-1 SPECIFIED ON
 ROOF FRAMING PLAN @ WOOD FRAMED WALL.
 NEED WOOD TO WOOD CONNECTOR. SECTION
 104.2.1.2 CITY AMENDMENTS TO FBC 2001.
 5-34SH WINDOW DON'T PROVIDE 24" CLEAR
 OPENING IN HEIGHT REQUIRED BY SECTION
 1005.4.4 FBC 2001. REVISE/CLARIFY AS
 REQUIRED.

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2003-09-17 Cont ID  
Sent By dpalmer Date 2003-09-17 Time 17:09 Rev Time 0.25
Received By dpalmer Date 2003-09-17 Time 17:09 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2003-02-24 Cont ID  
Sent By hmoser Date 2003-02-22 Time 10:47 Rev Time 0.50
Received By btrobaug Date 2003-02-24 Time 17:00 Sent To B
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 6 Status N Date 2003-09-03 Cont ID  
Sent By csiegber Date 2003-09-03 Time 16:54 Rev Time 0.00
Received By csiegber Date 2003-09-03 Time 16:54 Sent To M
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 5 Status N Date 2003-05-15 Cont ID  
Sent By shernand Date 2003-05-15 Time 16:42 Rev Time 0.00
Received By shernand Date 2003-05-15 Time 16:42 Sent To B
Notes
2003-05-15 00:00:00JGOMEZ DESK

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2003-05-08 Cont ID  
Sent By shernand Date 2003-05-08 Time 14:26 Rev Time 0.00
Received By shernand Date 2003-05-08 Time 14:26 Sent To B
Notes
2003-05-08 00:00:00JGOMEZ DESK

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2003-04-04 Cont ID  
Sent By shernand Date 2003-04-04 Time 10:16 Rev Time 0.00
Received By shernand Date 2003-04-04 Time 10:16 Sent To M
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2003-03-04 Cont ID  
Sent By dpalmer Date 2003-03-04 Time 08:49 Rev Time 0.00
Received By dpalmer Date 2003-03-04 Time 08:49 Sent To M
Notes
2003-03-04 00:00:00TO HM`S DESK.

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2003-02-06 Cont ID  
Sent By dpalmer Date 2003-02-06 Time 12:43 Rev Time 0.00
Received By dpalmer Date 2003-02-06 Time 12:43 Sent To Z
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 3 Status P Date 2003-09-15 Cont ID  
Sent By pkrauss Date 2003-09-15 Time 07:28 Rev Time 0.20
Received By pkrauss Date 2003-09-15 Time 07:28 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2003-03-10 Cont ID  
Sent By csiegber Date 2003-09-03 Time 16:54 Rev Time 0.25
Received By hmoser Date 2003-03-10 Time 18:40 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2003-02-22 Cont ID  
Sent By dpalmer Date 2003-03-04 Time 08:49 Rev Time 0.50
Received By hmoser Date 2003-02-22 Time 10:47 Sent To E
Notes
2003-02-22 00:00:00PLAN DENIED
 1) ENERGY PERFORMANCE LEVEL DISPLAY CARD
 AND ENERGY CALCULATIONS DO NOT MATCH.
 2) EQUIPMENT SELESTION ON MANUAL (J) NOT
 COMPLETE.
 3) COOLING & HEATING BTU.ON MANUAL (J)
 DO NOTMATCH PLANS.
 PLAN REVIEW BY HAROLD MOSER
 (561)689-8096 EXT.8390

Review Stop P PLUMBING
Rev No 1 Status P Date 2003-02-19 Cont ID  
Sent By sgraham Date 2003-02-07 Time 15:42 Rev Time 0.33
Received By jleech Date 2003-02-19 Time 16:59 Sent To M
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2003-02-07 Cont ID  
Sent By dpalmer Date 2003-02-06 Time 12:43 Rev Time 0.00
Received By sgraham Date   Time   Sent To P
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved