Plan Review Stops For Permit 03020277 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
5 |
Status |
P |
Date |
2003-06-18 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2003-06-18 |
Time |
18:20 |
Rev Time |
0.33 |
Received By |
jgomez |
Date |
2003-06-18 |
Time |
18:20 |
Sent To |
|
|
Notes |
2003-06-18 00:00:00 | STORM SHUTTERS PROVISO: | | 1-ANCHORS TO BE AT 12"O.C.(NOT 12.5") | | WHEN EDGE DISTANCE IS 2". SEE ENG'D | | DRAWINGS. | | 2-REVISE ANCHOR SPACING FOR ANCHORS IN | | WOOD FRAMING. SEE ENGINEERED DRAWINGS. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
4 |
Status |
P |
Date |
2003-05-13 |
|
|
Cont ID |
|
Sent By |
shernand |
Date |
2003-05-15 |
Time |
16:42 |
Rev Time |
0.50 |
Received By |
jgomez |
Date |
2003-05-13 |
Time |
17:46 |
Sent To |
|
|
Notes |
2003-05-13 00:00:00 | ENERGY CALCS SUBMITTAL. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
3 |
Status |
P |
Date |
2003-04-08 |
|
|
Cont ID |
|
Sent By |
shernand |
Date |
2003-05-08 |
Time |
14:26 |
Rev Time |
2.00 |
Received By |
jgomez |
Date |
2003-04-08 |
Time |
15:49 |
Sent To |
|
|
Notes |
2003-04-08 00:00:00 | BUILDING REVIEW APPROVED WITH PROVISO: | | 1-PROVIDE UPDATED SBBCI PRODUCT APPROVAL | | #2229A THAT MATCHES ENGINEERED DWGS. | | ALSO, REVISE DESIGN PRESSURES. SEE | | ENGINEERED DWGS FOR MAX./MIN. PANEL | | SPAN ALLOWED ACCORDING TO THE DESIGN | | PRESSURES. SEC. 104.2.1.2 CITY AMEND. | | MENTS TO FBC 2001. | | 2-REVISE DETAIL S-21 FOR COLUMN LOCATED | | BETWEEN GARAGE AND STAIRWAY. | | | | **NOTE: THIS IS NOT A TRUSS TO TRUSS | | CONNECTION. CLARIFY HOW IS COLUMN | | SUPPORTING THE TWO GIRDER TRUSSES. | | SEC. 104.2.1.2 CITY AMENDMENTS TO FBC. | | | | 3-RE-SUBMIT ENERGY CALCULATIONS WITH | | ENGINEER'S ORIGINAL SIGNATURE AND SEAL | | AS REQUIRED BY CHAPTER 471 FLORIDA | | STATUTES AND SEC. 103.0 CHAPTER 13 FBC | | 2001. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
F |
Date |
2003-03-26 |
|
|
Cont ID |
|
Sent By |
shernand |
Date |
2003-04-04 |
Time |
10:16 |
Rev Time |
0.25 |
Received By |
jgomez |
Date |
2003-03-26 |
Time |
12:10 |
Sent To |
|
|
Notes |
2003-03-26 00:00:00 | SECOND CHECKLIST: | | 1-NONE OF THE ITEMS ON FIRST CHECKLIST | | DATED 2-28-03 WERE ADDRESSED. | | SEE ATTACHED COPY OF THAT CHECKLIST. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2003-02-28 |
|
|
Cont ID |
|
Sent By |
btrobaug |
Date |
2003-02-24 |
Time |
17:01 |
Rev Time |
2.00 |
Received By |
jgomez |
Date |
2003-02-28 |
Time |
17:47 |
Sent To |
|
|
Notes |
2003-02-28 00:00:00 | BUILDING CHECKLIST: | | 1-IMPACT FEES RECEIPT NUMBER DOESN'T | | MATCH NUMBER ON STAMPED DRAWINGS. | | PROVIDE MATCHING RECEIPT. | | 2-PROVIDE COMPLETE INFORMATION FOR STORM | | SHUTTERS OR APPLY FOR SEPARATE PERMIT. | | 3-DETAIL S21 DOESN'T APPLY TO COLUMN | | LOCATED BETWEEN GARAGE AND STAIRWAY. | | PROVIDE COMPLETE DETAIL SHOPWING HOW | | ARE STRAPS HOLDING THE TWO GIRDER | | TRUSSES AT THIS LOCATION. SECTION | | 104.2.1.2 CITY AMENDMENTS TO FBC 2001. | | 4-REVISE CONNECTOR TC-1 SPECIFIED ON | | ROOF FRAMING PLAN @ WOOD FRAMED WALL. | | NEED WOOD TO WOOD CONNECTOR. SECTION | | 104.2.1.2 CITY AMENDMENTS TO FBC 2001. | | 5-34SH WINDOW DON'T PROVIDE 24" CLEAR | | OPENING IN HEIGHT REQUIRED BY SECTION | | 1005.4.4 FBC 2001. REVISE/CLARIFY AS | | REQUIRED. |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
2 |
Status |
P |
Date |
2003-09-17 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2003-09-17 |
Time |
17:09 |
Rev Time |
0.25 |
Received By |
dpalmer |
Date |
2003-09-17 |
Time |
17:09 |
Sent To |
|
|
Notes |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
P |
Date |
2003-02-24 |
|
|
Cont ID |
|
Sent By |
hmoser |
Date |
2003-02-22 |
Time |
10:47 |
Rev Time |
0.50 |
Received By |
btrobaug |
Date |
2003-02-24 |
Time |
17:00 |
Sent To |
B |
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
6 |
Status |
N |
Date |
2003-09-03 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2003-09-03 |
Time |
16:54 |
Rev Time |
0.00 |
Received By |
csiegber |
Date |
2003-09-03 |
Time |
16:54 |
Sent To |
M |
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
5 |
Status |
N |
Date |
2003-05-15 |
|
|
Cont ID |
|
Sent By |
shernand |
Date |
2003-05-15 |
Time |
16:42 |
Rev Time |
0.00 |
Received By |
shernand |
Date |
2003-05-15 |
Time |
16:42 |
Sent To |
B |
|
Notes |
2003-05-15 00:00:00 | JGOMEZ DESK |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
4 |
Status |
N |
Date |
2003-05-08 |
|
|
Cont ID |
|
Sent By |
shernand |
Date |
2003-05-08 |
Time |
14:26 |
Rev Time |
0.00 |
Received By |
shernand |
Date |
2003-05-08 |
Time |
14:26 |
Sent To |
B |
|
Notes |
2003-05-08 00:00:00 | JGOMEZ DESK |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2003-04-04 |
|
|
Cont ID |
|
Sent By |
shernand |
Date |
2003-04-04 |
Time |
10:16 |
Rev Time |
0.00 |
Received By |
shernand |
Date |
2003-04-04 |
Time |
10:16 |
Sent To |
M |
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2003-03-04 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2003-03-04 |
Time |
08:49 |
Rev Time |
0.00 |
Received By |
dpalmer |
Date |
2003-03-04 |
Time |
08:49 |
Sent To |
M |
|
Notes |
2003-03-04 00:00:00 | TO HM`S DESK. |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2003-02-06 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2003-02-06 |
Time |
12:43 |
Rev Time |
0.00 |
Received By |
dpalmer |
Date |
2003-02-06 |
Time |
12:43 |
Sent To |
Z |
|
Notes |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
3 |
Status |
P |
Date |
2003-09-15 |
|
|
Cont ID |
|
Sent By |
pkrauss |
Date |
2003-09-15 |
Time |
07:28 |
Rev Time |
0.20 |
Received By |
pkrauss |
Date |
2003-09-15 |
Time |
07:28 |
Sent To |
|
|
Notes |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
2 |
Status |
P |
Date |
2003-03-10 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2003-09-03 |
Time |
16:54 |
Rev Time |
0.25 |
Received By |
hmoser |
Date |
2003-03-10 |
Time |
18:40 |
Sent To |
|
|
Notes |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
1 |
Status |
F |
Date |
2003-02-22 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2003-03-04 |
Time |
08:49 |
Rev Time |
0.50 |
Received By |
hmoser |
Date |
2003-02-22 |
Time |
10:47 |
Sent To |
E |
|
Notes |
2003-02-22 00:00:00 | PLAN DENIED | | 1) ENERGY PERFORMANCE LEVEL DISPLAY CARD | | AND ENERGY CALCULATIONS DO NOT MATCH. | | 2) EQUIPMENT SELESTION ON MANUAL (J) NOT | | COMPLETE. | | 3) COOLING & HEATING BTU.ON MANUAL (J) | | DO NOTMATCH PLANS. | | PLAN REVIEW BY HAROLD MOSER | | (561)689-8096 EXT.8390 |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
P |
Date |
2003-02-19 |
|
|
Cont ID |
|
Sent By |
sgraham |
Date |
2003-02-07 |
Time |
15:42 |
Rev Time |
0.33 |
Received By |
jleech |
Date |
2003-02-19 |
Time |
16:59 |
Sent To |
M |
|
Notes |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
P |
Date |
2003-02-07 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2003-02-06 |
Time |
12:43 |
Rev Time |
0.00 |
Received By |
sgraham |
Date |
|
Time |
|
Sent To |
P |
|
Notes |
|
|