Plan Review Stops For Permit 03011841 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
3 |
Status |
P |
Date |
2003-04-24 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2003-04-24 |
Time |
09:19 |
Rev Time |
0.50 |
Received By |
jgomez |
Date |
2003-04-24 |
Time |
09:19 |
Sent To |
|
|
Notes |
2003-04-24 00:00:00 | REVISION OF TOP OF BEAM ELEVATION AT | | ZERO LOT LINE WALL. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
P |
Date |
2003-03-26 |
|
|
Cont ID |
|
Sent By |
jgomez |
Date |
2003-03-25 |
Time |
17:50 |
Rev Time |
2.00 |
Received By |
jgomez |
Date |
2003-03-25 |
Time |
17:50 |
Sent To |
|
|
Notes |
2003-03-25 00:00:00 | BUILDING REVIEW APPROVED WITH PROVISO: | | 1-REVISE LOCATION FOR SOIL TEST REPORT. | | THIS IS LOT 227, PARCEL F. NOT PARCEL | | G. | | 2-STORM SHUTTERS: PROVIDE COMPLETE AND | | CORRECT INFORMATION: | | A)SITE SPECIFIC PRODUCT APPROVAL NEEDS | | THE APPROVATION OF DESIGNER OF RECORD, | | AS REQ'D BY THE BUILDING OFFICIAL. | | B)NEED "CERTIFICATE OF COMPLIANCE" AND | | INSTALLATION AFFIDAVIT" FOR SITE | | SPECIFIC STORM SHUTTERS AS REQUIRED BY | | THE CITY IMPLEMENTATION STANDARD FOR | | HURRICANE MISSILE IMPACT PROTECTION. | | C)REVISE/CLARIFY WHY INSTALLATION SCHED. | | AND KEY PLAN CALLS FOR SBCCI PRODUCT | | APPROVAL BUT DRAWINGS SUBMITTED ARE | | FOR SITE SPECIFIC ENGINEERING. | | D)REVISE INSTALLATION SCHEDULE TO MATCH | | ENGINEERING DRAWINGS: CHECK THE DESIGN | | PRESSURES, MINIMUM AND MAXIMUM SHUTTER | | LENGTH ALLOWED, AND ANCHOR SPACING. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2003-02-24 |
|
|
Cont ID |
|
Sent By |
sthyng |
Date |
2003-03-11 |
Time |
16:32 |
Rev Time |
2.00 |
Received By |
jgomez |
Date |
2003-02-21 |
Time |
17:51 |
Sent To |
|
|
Notes |
2003-02-21 00:00:00 | CHECKLIST: | | 1-MISSING PAGE A-3 SHOWING EXTERIOR | | ELEVATIONS. | | 2-PROVIDE COMPLETE INFORMATION ON DETAIL | | 41/S1. MISSING NUMBER OF ANCHORS, | | ANCHORS SIZE AND WASHERS. SECTION | | 104.2.1.2 CITY AMENDMENTS TO FBC 2001. | | 3-PROVIDE COMPLETE INFORMATION FOR STORM | | SHUTTERS OR APPLY FOR SEPARATE PERMIT. | | 4-NEED NOTICE OF COMMENCEMENT. | | 5-PROVIDE DETAIL CONNECTION AT TOP OF | | WOOD COLUMN P2. SECTION 104.2.1.2 CITY | | AMENDMENTS TO FBC 2001. | | 6-PROVIDE SOIL TEST REPORT. |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
2 |
Status |
F |
Date |
2003-08-11 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2003-08-11 |
Time |
07:37 |
Rev Time |
0.25 |
Received By |
dpalmer |
Date |
2003-08-11 |
Time |
07:37 |
Sent To |
|
|
Notes |
2003-08-11 00:00:00 | ************* UNSAT *************** | | | | 1)NOTE: PLANS MUST CONTAIN ORIGINAL | | SIGNATURE FROM ARCH OF RECORD. PER | | FAC 61G1-16.004, FS 481.221 | | | | PLEASE SUBMIT THE ABOVE INFORMATION FOR | | REVIEW. IF THERE ARE ANY QUESTIONS, | | PLEASE CALL. | | | | DEWEY PALMER | | ELECTRICAL PLAN REVIEW | | 561-805-6717 | | [email protected] |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
P |
Date |
2003-02-10 |
|
|
Cont ID |
|
Sent By |
alange |
Date |
2003-08-05 |
Time |
16:16 |
Rev Time |
0.25 |
Received By |
dpalmer |
Date |
2003-02-10 |
Time |
07:22 |
Sent To |
B |
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
4 |
Status |
N |
Date |
2003-08-05 |
|
|
Cont ID |
|
Sent By |
alange |
Date |
2003-08-05 |
Time |
16:16 |
Rev Time |
0.00 |
Received By |
alange |
Date |
2003-08-05 |
Time |
16:16 |
Sent To |
E |
|
Notes |
2003-08-05 00:00:00 | TO DP DESK |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2003-07-15 |
|
|
Cont ID |
|
Sent By |
shernand |
Date |
2003-07-15 |
Time |
13:54 |
Rev Time |
0.00 |
Received By |
shernand |
Date |
2003-07-15 |
Time |
13:54 |
Sent To |
M |
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2003-03-11 |
|
|
Cont ID |
|
Sent By |
sthyng |
Date |
2003-03-11 |
Time |
16:32 |
Rev Time |
0.00 |
Received By |
sthyng |
Date |
|
Time |
|
Sent To |
B |
|
Notes |
2003-03-11 00:00:00 | TO JG DESK |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2003-01-24 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2003-01-24 |
Time |
13:02 |
Rev Time |
0.00 |
Received By |
dpalmer |
Date |
2003-01-24 |
Time |
13:02 |
Sent To |
Z |
|
Notes |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
2 |
Status |
P |
Date |
2003-07-16 |
|
|
Cont ID |
|
Sent By |
pkrauss |
Date |
2003-07-16 |
Time |
12:11 |
Rev Time |
0.20 |
Received By |
pkrauss |
Date |
2003-07-16 |
Time |
12:11 |
Sent To |
|
|
Notes |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
1 |
Status |
P |
Date |
2003-02-05 |
|
|
Cont ID |
|
Sent By |
shernand |
Date |
2003-07-15 |
Time |
13:54 |
Rev Time |
0.25 |
Received By |
hmoser |
Date |
2003-02-05 |
Time |
18:17 |
Sent To |
E |
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
P |
Date |
2003-02-01 |
|
|
Cont ID |
|
Sent By |
sgraham |
Date |
2003-01-24 |
Time |
16:26 |
Rev Time |
0.25 |
Received By |
jleech |
Date |
2003-02-01 |
Time |
08:44 |
Sent To |
M |
|
Notes |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
P |
Date |
2003-01-24 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2003-01-24 |
Time |
13:02 |
Rev Time |
0.00 |
Received By |
sgraham |
Date |
|
Time |
|
Sent To |
P |
|
Notes |
|
|