Plan Review Details - Permit 03011259
Plan Review Stops For Permit 03011259
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2003-03-07 Cont ID  
Sent By pkrauss Date 2003-07-11 Time 14:25 Rev Time 0.25
Received By jgomez Date 2003-03-07 Time 09:13 Sent To  
Notes
2003-03-07 00:00:00BUILDING APPROVED. SEE PROVISO DATED
 2-14-03.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2003-02-14 Cont ID  
Sent By btrobaug Date 2003-02-04 Time 13:03 Rev Time 2.00
Received By jgomez Date 2003-02-14 Time 11:59 Sent To  
Notes
2003-02-14 00:00:00BUILDING REVIEW APPROVED WITH PROVISO:
 1-PROVIDE COMPLETE INFORMATION FOR STORM
 SHUTTERS UNDER A SEPARATE PERMIT.
 2-FLOOD ZONE A8: NEED TO PROVIDE THE
 ELEVATION CERTIFICATE.
 3-CLARIFY DETAIL S21 FOR COLUMN LOCATED
 BETWEEN GARAGE AND STAIRWAY. SHOW HOW
 ARE STRAPS HOLDING THE THE GIRDER
 TRUSSES. SECTION 104.2.1.2 CITY
 AMENDMENTS TO FBC 2001.
 4-REVISE CONNECTOR TC-1 SPECIFIED ON
 ROOF FRAMING PLAN AT FRONT ELEVATION.
 NEED WOOD TO WOOD CONNECTORS.
 5-34SH WINDOWS DON'T PROVIDE THE 24"
 CLEAR HEIGHT REQUIRED BY SECTION
 1005.4.4 FBC 2001.
 6-PROVIDE SOIL TEST REPORT PRIOR TO
 CONSTRUCTION.

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2003-02-04 Cont ID  
Sent By hmoser Date 2003-02-03 Time 17:53 Rev Time 0.00
Received By btrobaug Date 2003-02-04 Time 13:02 Sent To B
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2003-07-08 Cont ID  
Sent By shernand Date 2003-07-08 Time 16:04 Rev Time 0.00
Received By shernand Date 2003-07-08 Time 16:04 Sent To M
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 3 Status P Date 2003-07-11 Cont ID  
Sent By pkrauss Date 2003-07-11 Time 14:25 Rev Time 0.25
Received By pkrauss Date 2003-07-11 Time 14:25 Sent To B
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2003-03-01 Cont ID  
Sent By shernand Date 2003-07-08 Time 16:04 Rev Time 0.50
Received By hmoser Date 2003-03-01 Time 07:22 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2003-02-03 Cont ID  
Sent By kstevens Date 2003-01-27 Time 12:56 Rev Time 0.25
Received By hmoser Date 2003-02-03 Time 17:46 Sent To E
Notes
2003-02-03 00:00:00PLAN DENIED
 1) ENERGY PERFORMANCE LEVEL DISPLAY CARD
 AND ENERGY CALCULATIONS DO NOT MATCH.
 2) EQUIPMENT SELESTION ON MANUAL (J) NOT
 COMPLETE.
 3) COOLING & HEATING BTU.ON MANUAL (J)
 DO NOTMATCH PLANS.
 PLAN REVIEW BY HAROLD MOSER
 (561)689-8096 EXT.8390

Review Stop P PLUMBING
Rev No 1 Status P Date 2003-01-27 Cont ID  
Sent By sgraham Date 2003-01-24 Time 16:29 Rev Time 0.25
Received By kstevens Date 2003-01-27 Time 12:47 Sent To M
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2003-01-24 Cont ID  
Sent By sgraham Date 2003-01-24 Time 16:29 Rev Time 0.00
Received By sgraham Date   Time   Sent To P
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved