Plan Review Details - Permit 02111936
Plan Review Stops For Permit 02111936
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2003-01-29 Cont ID  
Sent By btrobaug Date 2003-01-30 Time 07:41 Rev Time 0.00
Received By lsmith Date 2003-01-30 Time 10:58 Sent To E
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2003-01-10 Cont ID  
Sent By kstevens Date 2003-01-10 Time 17:28 Rev Time 0.23
Received By kstevens Date 2003-01-10 Time 17:25 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 3 Status P Date 2003-01-30 Cont ID  
Sent By btrobaug Date 2003-01-30 Time 07:41 Rev Time 0.25
Received By btrobaug Date 2003-01-30 Time 07:35 Sent To B
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2002-12-31 Cont ID  
Sent By kstevens Date 2003-01-29 Time 10:03 Rev Time 0.50
Received By btrobaug Date   Time   Sent To P
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2002-12-23 Cont ID  
Sent By btrobaug Date 2002-12-31 Time 09:33 Rev Time 0.25
Received By dpalmer Date 2002-12-23 Time 18:47 Sent To B
Notes
2002-12-23 00:00:00*********** NOTE **********
  
 PLEASE SEE PLUMB PLAN REVIEW COMMENTS.
 PLEASE NOTE ELECTRICAL IS OK, HOWEVER
 PLANS WILL GET STAMPED BY ELEC WHEN
 PLUMB COMMENTS ARE ADDRESSED DUE TO
 BOTH BEING ON SAME PAGE.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 561-659-8096 EXT 8372

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2003-01-22 Cont ID  
Sent By btrobaug Date 2003-01-22 Time 16:59 Rev Time 0.00
Received By btrobaug Date 2003-01-22 Time 16:59 Sent To Z
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2002-12-31 Cont ID  
Sent By btrobaug Date 2002-12-31 Time 09:32 Rev Time 0.00
Received By btrobaug Date 2002-12-27 Time 09:32 Sent To E
Notes
***NONE***

Review Stop P PLUMBING
Rev No 3 Status P Date 2003-01-29 Cont ID  
Sent By kstevens Date 2003-01-29 Time 10:02 Rev Time 0.33
Received By kstevens Date 2003-01-29 Time 10:02 Sent To  
Notes
2003-01-29 00:00:00REVISION OK - SPA SHAPE CHANGED

Review Stop P PLUMBING
Rev No 2 Status P Date 2003-01-10 Cont ID  
Sent By sgraham Date 2003-01-28 Time 14:58 Rev Time 0.25
Received By kstevens Date 2003-01-10 Time 17:28 Sent To B
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status F Date 2002-12-07 Cont ID  
Sent By btrobaug Date 2002-12-31 Time 12:31 Rev Time 0.50
Received By kstevens Date 2002-12-07 Time 09:20 Sent To Z
Notes
2002-12-07 00:00:00DENIED
 REFERENCE: FBC-2001 424.2 SWIMMING POOLS
  
 A) PLEASE ADJUST YOUR NOTES, DETAILS, OR
 SUBMITTALS TO REFLECT THE FOLLOWING IN-
 FORMATION REQUIRED FOR PLAN REVIEW
 1) COMPLY WITH FBC-2001 SEC 424.2
 PRIVATE SWIMMING POOLS.
 2) FBC-2001 SEC 424.2.6.1 ENGINEERING
 DESIGN, CONSTRUCTION AND WORKMANSHIP.
 ANSI/NSPI-4 92, AND NSPI-5. (ADD TO
 NOTES)
 3) FBC-2001 424.2.9 WATER SUPPLY, LOCAL
 ORD. #2853-95, BACKFLOW REQUIRED ON
 WATER SERVICE. (ADD TO NOTES)
 4) FBC-2001 424.2.12.1 PRESSURE TESTS.
 PER MANUFACTURE RECOMMENDATIONS, NO AIR
 TEST SHALL BE APPROVED FOR PVC PIPE AND
 FITTINGS. (ADD TO NOTES)
 5) FBC-2001 424.2.13.2JOINTS AND CON-
 NECTIONS, FBC PLMG SEC 605.21, PURPLE
 PRIMER REQUIRED ON PVC PIPING. (ADD TO
 NOTES)
  
 REVIEW BY KEN STEVENS
 (561) 659-8096 EXT 8377

Review Stop Z ZONING
Rev No 2 Status P Date 2003-01-28 Cont ID  
Sent By sgraham Date 2003-01-28 Time 14:57 Rev Time 0.00
Received By sgraham Date   Time   Sent To P
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2002-12-11 Cont ID  
Sent By btrobaug Date 2003-01-22 Time 16:59 Rev Time 0.25
Received By sgraham Date   Time   Sent To P
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved