Plan Review Details - Permit 02111218
Plan Review Stops For Permit 02111218
Review Stop E ELECTRICAL
Rev No 2 Status P Date 2003-06-30 Cont ID  
Sent By btrobaug Date 2003-06-30 Time 13:21 Rev Time 0.50
Received By btrobaug Date 2003-06-30 Time 13:19 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2002-12-21 Cont ID  
Sent By shernand Date 2003-06-27 Time 11:30 Rev Time 0.50
Received By btrobaug Date 2002-12-21 Time 09:49 Sent To R
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2003-06-27 Cont ID  
Sent By shernand Date 2003-06-27 Time 11:30 Rev Time 0.00
Received By shernand Date 2003-06-27 Time 11:30 Sent To E
Notes
2003-06-27 00:00:00BT DESK

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2003-02-06 Cont ID  
Sent By dpalmer Date 2003-02-06 Time 17:10 Rev Time 0.00
Received By dpalmer Date 2003-02-06 Time 17:10 Sent To B
Notes
2003-02-06 00:00:00TO JULIO GOMEZ'S DESK.

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2003-01-08 Cont ID  
Sent By dpalmer Date 2003-01-08 Time 13:29 Rev Time 0.00
Received By dpalmer Date 2003-01-08 Time 13:28 Sent To B
Notes
2003-01-08 00:00:00TO JULIO GOMEZ'S DESK.

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2002-11-20 Cont ID  
Sent By btrobaug Date 2002-11-20 Time 16:33 Rev Time 0.00
Received By btrobaug Date 2002-11-19 Time 16:33 Sent To Z
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2002-12-17 Cont ID  
Sent By jleech Date 2002-12-04 Time 19:13 Rev Time 0.50
Received By rregueir Date 2002-12-17 Time 19:01 Sent To E
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2002-12-04 Cont ID  
Sent By btrobaug Date 2002-11-22 Time 11:51 Rev Time 0.25
Received By jleech Date 2002-12-04 Time 19:13 Sent To M
Notes
***NONE***

Review Stop R ROOF PLAN REVIEW
Rev No 3 Status F Date 2003-02-19 Cont ID  
Sent By jgomez Date 2003-02-19 Time 10:54 Rev Time 2.00
Received By jgomez Date 2003-02-18 Time 17:59 Sent To  
Notes
2003-02-19 00:00:00SUBMITTAL REVIEW COMMENTS:
 1-PROVIDE 2X STRUCTURAL BUCK DETAIL AS
 REQUIRED BY THE ENTRY DOORS PRODUCT
 APPROVAL.
 2-SOIL TEST REPORT WAS NOT SUBMITTED TO
 THIS OFFICE FOR REVIEW.
 3-PROVIDE INSTALLATION AFFIDAVIT FOR
 STORM SHUTTERS SITE SPECIFIC INSTALLA-
 TION AS REQUIRED BY THE IMPLEMENTATION
 STANDARD FOR HURRICANE MISSILE IMPACT
 PROTECTION OF THE CITY.
 4-PROVIDE PRODUCT APPROVAL FOR GARAGE
 DOORS WITH LEGIBLE DRAWINGS.

Review Stop R ROOF PLAN REVIEW
Rev No 2 Status P Date 2003-01-14 Cont ID  
Sent By jgomez Date 2003-01-14 Time 17:04 Rev Time 3.50
Received By jgomez Date 2003-01-14 Time 17:04 Sent To  
Notes
2003-01-14 00:00:00BUILDING REVIEW APPROVED WITH PROVISO:
 1-PROVIDE SOIL TEST REPORT.
 2-CLEARLY SPECIFY SPACING SUPPORTS FOR
 WWM IN CONCRETE SLAB. SEE SECTION
 1909.3 FBC 2001.
 3-STEEL BOLLARD TO PROTECT WATER HEATER:
 SPECIFY HEIGHT OF COLUMN AND CLARIFY
 HOW IS THE COLUMN GOING TO RESIST THE
 IMPACT LOAD WITH ONLY 4" EMBEDMENT
 INTO CONCRETE SLAB. SEC. 104.2.1.2
 CITY AMENDMENTS TO FBC 2001.
 4-PROVIDE ATTIC ACCESS PANEL AT SECOND
 FLOOR ROOF. SEC. 2309.6 FBC 2001.
 5-PROVIDE CERTIFICATE OF COMPLIANCE AND
 ISTALLATION AFFIDAVIT FOR SITE
 SPECIFIC STORM SHUTTERS INSTALLATION
 AS REQUIRED BY THE CITY IMPLEMENTATION
 STANDARD FOR HURRICANE MISSILE IMPACT
 PROTECTION (ITEMS 15, 16 AND 17)
 6-PROVIDE PRODUCT APPROVAL FOR:
 A)GARAGE DOORS NEED LEGIBLE DRAWINGS AND
 MAKE SURE THEY MEET DESIGN PRESSURES
 CALCULATED BY THE ARCHITECT.
 B)OUTSWING DOORS WITH APPROVED DRAWINGS
 THAT MATCH UPDATED PRODUCT APPROVAL.
 (NEED STAMPED DADE COUNTY DRAWINGS
 WITH NEW UPDATED PRODUCT APPROVAL #).

Review Stop R ROOF PLAN REVIEW
Rev No 1 Status F Date 2002-12-27 Cont ID  
Sent By btrobaug Date 2002-12-21 Time 10:00 Rev Time 5.00
Received By jgomez Date 2002-12-27 Time 11:10 Sent To  
Notes
2002-12-27 00:00:00CHECKLIST:
 1-2ND FLOOR PLAN DOESN'T MATCH EXTERIOR
 REAR ELEVATION LOCATION OF WINDOW.
 2-FRAMING PLANS ARE VERY CONFUSING AND
 MISSING STRUCTURAL DETAILS AND SPECS:
 A)TRUSS GIRDERS DON'T SHOW ANY POST AT
 THE ENDS.
 B)PROVIDE COMPLETE SECTION/DETAIL AT
 FRONT ELEVATION CONSTRUCTION SHOWING
 ATTACHMENT OF FRAMED WALL TO GIRDER
 TRUSS AND ATTACHMENT OF GIRDER TRUSS
 AT THE ENDS.
 C)CLARIFY WHY THERE ARE ONLY A COUPLE
 OF SHEARWALLS SHOWN ON TWO SIDES ONLY.
 WHAT ABOUT THE OTHER SIDES?
 D)PROVIDE DETAILS AND SPECS FOR FRAMING
 AT THE CORNERS. HOW ARE THE LOADS
 TRANSFERRED AT CORNERS?
 E)FOUNDATION PLAN DON'T MATCH BEARING
 WALLS SHOWN ON FIRST FLOOR PLAN.
 F)2ND FLOOR FRAMING PLAN IS MISSING
 SPECS FOR SOME HEADERS.
 G)REVISE/UPDATE ANCHOR SCHEDULE. SEE USP
 CATALOGUE FOR PROPER CONNECTOR AND
 ENGINEERED VALUES. PROVIDE ENGINEERING
 CALCULATIONS FOR VALUES THAT ARE
 DIFFERENT FROM THOSE PUBLISHED IN THE
 USP CATALOGUE.
 H)SOME CONNECTORS SPECIFIED ON ROOF
 FRAMING PLANS DON'T RESIST CALCULATED
 LOADS SHOWN ON PLANS. REVISE AS REQ'D.
 SECTION 104.2.1.2 CITY AMENDMENTS TO
 FBC 2001.
  
 3-SPECIFY CONTROL JOINTS IN CONCRETE
 SLAB OR CLEARLY SPECIFY SUPPORTS FOR
 WWM. SEE SEC. 1909.3 FBC 2001.
 4-SPECIFY SAFETY GLASS AT BATH #2 AND
 AT FAMILY AREA. SEE PLANS AND SECTION
 2405.2 FBC 2001.
 5-PROVIDE COMPLETE STRUCTURAL DETAIL FOR
 INSTALLATION OF STEEL PIPE AT GARAGE
 FOR PROTECTION OF WATER HEATER.
 SEC. 104.2.1.2 CITY AMENDMENTS TO FBC.
 6-PROVIDE ATTIC ACCESS ABOVE GARAGE,
 MAIN ROOF AND 2ND FLOOR.
 SEC. 2309.6 FBC 2001.
 7-PROVIDE SMOKE DETECTOR AT 1ST FLOOR BY
 THE STAIRS. SEC. 905.2.2 FBC 2001.
 8-SITE SPECIFIC STORM SHUTTERS INSTALLA-
 TION WILL REQUIRE A CERTIFICATE OF
 COMPLIANCE AND INSTALLATION AFFIDAVIT
 AS REQUIRED BY THE CITY IMPLEMENTATION
 STANDARD FOR HURRICANE MISSILE IMPACT
 PROTECTION (ITEMS 15, 16 AND 17).
 9-NEED PRODUCT APPROVAL FOR:
 A)ROOF CONCRETE TILE: ONE SUBMITTED IS
 EXPIRED.
 B)GARAGE DOORS: PRODUCT APPROVAL WAS
 DELETED FROM SBCCI. NEED A NEW ONE.
  
 10-REVISE ENERGY CALCULATIONS: UNDER THE
 ATTIC AREA IS INCORRECT. SEE SECTION
 604.1.A.1 OF CHAPTER 13 OF FBC 2001.
 11-OWES $236.27 FOR UPDATED VALUE AND
 RADON FEES.
  
 NOTE:
 PLEASE RETURN REVIEWED SET AFTER CORREC-
 TIONS ARE MADE TO THE ORIGINAL CAD DWGS
 IN ORDER TO EXPEDITE THE REVIEW PROCESS.
 IN THE PAST CORRECTIONS WERE DONE ON THE
 BLUEPRINTS. DOES WHY MOST OF THE
 COMMENTS WERE ADDRESSED ON PREVIEWS PLAN
 REVIEWS BUT THEY WERE NOT REVISED ON THE
 ORIGINAL CAD DRAWINGS.

Review Stop Z ZONING
Rev No 1 Status P Date 2002-11-22 Cont ID  
Sent By btrobaug Date 2002-11-20 Time 16:33 Rev Time 0.00
Received By btrobaug Date   Time   Sent To P
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved