Plan Review Details - Permit 02110371
Plan Review Stops For Permit 02110371
Review Stop E ELECTRICAL
Rev No 1 Status P Date 2002-11-27 Cont ID  
Sent By dpalmer Date 2002-11-27 Time 05:40 Rev Time 0.25
Received By dpalmer Date 2002-11-27 Time 05:40 Sent To M
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 5 Status N Date 2003-04-10 Cont ID  
Sent By shernand Date 2003-04-10 Time 16:51 Rev Time 0.00
Received By shernand Date 2003-04-10 Time 16:51 Sent To M
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2003-04-10 Cont ID  
Sent By shernand Date 2003-04-10 Time 16:37 Rev Time 0.00
Received By shernand Date 2003-04-10 Time 16:37 Sent To B
Notes
2003-04-10 00:00:00JGOMEZ DESK

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2003-02-06 Cont ID  
Sent By btrobaug Date 2003-02-06 Time 11:45 Rev Time 0.20
Received By btrobaug Date 2003-02-06 Time 11:44 Sent To B
Notes
2003-02-06 00:00:00TO JULIO./WRT

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2003-01-30 Cont ID  
Sent By dpalmer Date 2003-01-30 Time 15:08 Rev Time 0.00
Received By dpalmer Date 2003-01-30 Time 15:08 Sent To M
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2002-11-06 Cont ID  
Sent By btrobaug Date 2002-11-06 Time 17:17 Rev Time 0.00
Received By btrobaug Date 2002-11-06 Time 17:17 Sent To Z
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 3 Status P Date 2003-04-12 Cont ID  
Sent By rregueir Date 2003-04-12 Time 12:53 Rev Time 0.33
Received By rregueir Date 2003-04-12 Time 12:53 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2003-03-06 Cont ID  
Sent By shernand Date 2003-04-10 Time 16:51 Rev Time 0.50
Received By rregueir Date 2003-03-06 Time 18:04 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2002-11-30 Cont ID  
Sent By dpalmer Date 2003-01-30 Time 15:08 Rev Time 0.33
Received By jleech Date 2002-11-30 Time 13:48 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2002-11-23 Cont ID  
Sent By sgraham Date 2002-11-13 Time 08:11 Rev Time 0.25
Received By jleech Date 2002-11-23 Time 09:30 Sent To  
Notes
***NONE***

Review Stop R ROOF PLAN REVIEW
Rev No 3 Status P Date 2003-04-15 Cont ID  
Sent By jgomez Date 2003-04-15 Time 17:45 Rev Time 1.00
Received By jgomez Date 2003-04-15 Time 17:45 Sent To  
Notes
2003-04-15 00:00:00BUILDING REVISION FOR TOP OF BEAM ELEV.
 AT ZERO LOT LINE WALL.

Review Stop R ROOF PLAN REVIEW
Rev No 2 Status F Date 2003-03-10 Cont ID  
Sent By jgomez Date 2003-03-10 Time 17:01 Rev Time 0.50
Received By jgomez Date 2003-03-10 Time 17:01 Sent To  
Notes
2003-03-10 00:00:00REVISION CHECKLIST:
 1-ARCHITECT NEEDS TO REVIEW ENGINEERING
 CALCULATIONS AND SPECS AND REVISE THE
 DIAPHRAGM SCHEDULE AS REQUIRED.
 2-REVISE RIGHT ELEVATION TO MATCH BLDG
 SECTION A/A3. SEE PLANS FOR COMMENTS.
 ALSO, REVISE TOP OF BB ON RAISED WALL
 ON ALL EXTERIOR ELEVATIONS AND ROOF
 FRAMING PLAN.
 3-PROVIDE SOIL TEST REPORT AS REQUESTED
 ON PROVISO DATED 12-5-02.
 4-PROVIDE COMPLETE INFORMATION FOR STORM
 SHUTTERS UNDER A SEPARATE PERMIT AS
 REQUESTED ON PROVISO DATED 12-5-02.
 5-PROVIDE COMPLETE INFORMATION ON DETAIL
 41/S1. NEED COMPLETE ANCHOR SIZE AND
 WASHER. SEC. 104.2.1.2 CITY AMENDMENTS
 TO FBC 2001.

Review Stop R ROOF PLAN REVIEW
Rev No 1 Status P Date 2002-12-05 Cont ID  
Sent By jgomez Date 2002-12-05 Time 16:32 Rev Time 2.00
Received By jgomez Date 2002-12-05 Time 16:32 Sent To  
Notes
2002-12-05 00:00:00BUILDING REVIEW APPROVED WITH PROVISO:
 1-PROVIDE SOIL TEST REPORT.
 2-ARCHITECT TO REVISE DETAIL FOR ONE HR
 FIRE RATED WALL ASSEMBLY AT ZERO LOT
 LINE. TABLE REFERENCED ON DETAIL 11/S3
 IS FOR CONCRETE WALL ASSEMBLIES, NOT
 FOR WOOD CONSTRUCTION. SEE SECTION
 709.6 FBC FOR WOOD ASSEMBLIES AND NEED
 TO COMPLETE DETAIL PROVIDING SPECS FOR
 INTERIOR AND EXTERIOR EXPOSURE TO FIRE
 AS REQUIRED BY TABLE 600 FBC 2001.
 3-ARCHITECT TO REVISE THE DIAPHRAGM
 SCHEDULE TO MATCH ENGINEERING ANALYSIS
 AND SPECIFICATIONS.
 4-PROVIDE COMPLETE INFORMATION FOR STORM
 SHUTTERS UNDER A SEPARATE PERMIT.
 5-PROVIDE COMPLETE INFORMATION ON DETAIL
 41/S1. NEED ANCHOR SIZE AND WASHER.
 SEC. 104.2.1.2 CITY AMENDMENTS TO FBC.

Review Stop Z ZONING
Rev No 1 Status P Date 2002-11-13 Cont ID  
Sent By btrobaug Date 2002-11-06 Time 17:18 Rev Time 0.25
Received By sgraham Date   Time   Sent To P
Notes
***NONE***