Plan Review Stops For Permit 02101904 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
5 |
Status |
F |
Date |
2003-04-21 |
|
|
Cont ID |
|
Sent By |
shernand |
Date |
2003-05-05 |
Time |
14:02 |
Rev Time |
0.00 |
Received By |
hpiskura |
Date |
2003-04-21 |
Time |
09:15 |
Sent To |
|
|
Notes |
2003-04-21 00:00:00 | AS NOTED PREVIOUSLY, SEPARATE PERMITS | | ARE REQUIRED FOR DOORS, WINDOWS ANDS | | ROOFCOVERINGS NOT INCLUDED WITH THE | | ORIGINAL PERMIT APPLICATION. | | | | THE METRO-DADE NOA # 01-430.01 HAS | | ILLEGIBLE PAGES.ALSO, IT IS REQUIRED | | TO BE REVIEWED BY THE DESIGNER OF | | RECORD FOR CONFORMANCE WITH THE PLANS. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
4 |
Status |
F |
Date |
2003-04-01 |
|
|
Cont ID |
|
Sent By |
shernand |
Date |
2003-04-17 |
Time |
09:59 |
Rev Time |
0.00 |
Received By |
hpiskura |
Date |
2003-04-01 |
Time |
09:10 |
Sent To |
|
|
Notes |
2003-04-01 00:00:00 | PLEASE PROVIDE AN EVALUATION REPORT FOR | | THE JAMES HARDIE SIDING PRODUCTS, NOTE | | THE SPECIFIC PRODUCT(S) TO BE USED, THE | | INSTALLATION METHOD FOR THE WPB WIND | | ZONE (140 MPH) |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
3 |
Status |
P |
Date |
2003-02-25 |
|
|
Cont ID |
|
Sent By |
sthyng |
Date |
2003-03-26 |
Time |
15:30 |
Rev Time |
1.50 |
Received By |
lsmith |
Date |
2003-02-25 |
Time |
08:13 |
Sent To |
|
|
Notes |
2003-02-25 00:00:00 | ****************PROVISO NOTES******** | | | | | | 1. THE CONTRACTOR WILL BE REQUIRED TO | | APPLY FOR SEPARATE PERMITS FOR THE | | FOLLOWING ITEMS: | | 1. STOREFRONT & WINDOWS | | 2. DOORS | | 3. ROOFING MATERIALS | | 4. FIBER-CEMENT SIDING | | | | SEE JOB SPEC BOOK FOR FURTHER | | SUBMITTALS REQUIRED THROUGHTOUT THE JOB. | | | | | | ANY QUESTIONS PLEASE CALL: | | LEA SMITH, BUILDING PLANSEXAMINER | | 659-8096 EXT 8394 OR | | HAROLD PISKURA @ 659-8096 EXT. 8219 |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
P |
Date |
2003-02-07 |
|
|
Cont ID |
|
Sent By |
lsmith |
Date |
2003-02-25 |
Time |
07:06 |
Rev Time |
0.00 |
Received By |
hpiskura |
Date |
2003-02-07 |
Time |
07:41 |
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2002-12-03 |
|
|
Cont ID |
|
Sent By |
btrobaug |
Date |
2002-11-05 |
Time |
16:24 |
Rev Time |
0.00 |
Received By |
hpiskura |
Date |
2002-12-03 |
Time |
09:17 |
Sent To |
|
|
Notes |
2002-12-03 00:00:00 | SHEET SP1 RE: THE HANDICAP PARKING | | SPACES.PLEASE PROVIDE SPECIFIC DESIGN | | INFORMATION, DO NOT QUOTE THE CODE | | SECTION.ALSO, THE SITE PLAN DOES NOT | | HAVE ANY DIMENSIONS LOCATING THE | | PROPOSED CONSTRUCTION ON THE PROPERTY. | | | | THE PLANS DO NOT INDICATE THE ROOF SLOPE | | OR THE WIND PRESSURE ZONES. | | | | PLEASE DEMONSTRATE HOW THE GABLE ENDS OF | | THE ROOF WILL MEET THE "STRUCTURALLY | | CONTINUOUS" REQUIREMENT OF FBC 2313.4.1. | | | | PLEASE PROVIDE A SPECIFIC METHOD OF | | INSTALLATION FOR THE "FIBER CEMENT | | PANELS" AS DEFINED BY THEIR NER 405 | | LISTING. | | | | INDICATE THE ATTIC ACCESS REQUIRED BY | | FBC 2309.6. | | | | SHOW A STRUCTURAL DETAIL FOR THE | | TRANSITION/TERMINATION OF THE 8X16 TIE | | BEAM AT ELEVATION 109'-4" INTO THE CMU | | PRACTICE WALL. | | | | THE SPECIFICATIONS DECLARE AN F'M OF | | 2000 PSI FOR THE MASONRY AND THE | | STRUCTURAL SHEET CALLS OUT 1500 PSI. | | PLEASE CLARIFY THE INTENT.THE | | SPECIFICATIONS ARE NOT SEALED BY THE | | ENGINEER. | | | | IF THE TEST REPORTS AND OR THE NOTICE OF | | ACCEPTANCE INFORMATION FOR THE DOORS | | WINDOWS AND ROOF COVERING ARE NOT | | INCLUDED WITH THE PERMIT APPLICATION, A | | SEPARATE PERMIT, FEES AND PLANS WILL BE | | REQUIRED. | | | | SHOW HOW THE GLAZED AREAS OF THE | | BUILDING EXTERIOR WILL RESIST HURRICANE | | MISSILE IMPACT.SEE FBC 1606.1.4. | 2002-11-05 00:00:00 | TO ZONING BOX./WRT. |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
4 |
Status |
P |
Date |
2003-04-29 |
|
|
Cont ID |
|
Sent By |
btrobaug |
Date |
2003-04-29 |
Time |
09:23 |
Rev Time |
1.00 |
Received By |
btrobaug |
Date |
2003-04-29 |
Time |
09:23 |
Sent To |
|
|
Notes |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
3 |
Status |
P |
Date |
2003-02-21 |
|
|
Cont ID |
|
Sent By |
shernand |
Date |
2003-04-03 |
Time |
14:59 |
Rev Time |
1.00 |
Received By |
dpalmer |
Date |
2003-02-21 |
Time |
14:56 |
Sent To |
Z |
|
Notes |
2003-02-21 00:00:00 | TO ZONING/SG FOR SIGN OFF. |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
2 |
Status |
F |
Date |
2003-02-07 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2003-02-20 |
Time |
11:32 |
Rev Time |
0.75 |
Received By |
dpalmer |
Date |
2003-02-07 |
Time |
05:14 |
Sent To |
|
|
Notes |
2003-02-07 00:00:00 | ************** UNSAT ************ | | | | PLANS ARE BEING SUBMITTED COMPLETED AND | | HAVE THE FOLLOWING COMMENTS. | | | | 1)NOTE: PLEASE CORRELATE RISER AND PANEL | | SCHEDULE. ONE SHOWS 100A PANEL AND OTHER | | SHOWS 200A? | | | | 2)NOTE: PLEASE SUBMIT AIC RATINGS FOR | | NEW DISC AND PANEL. 110-9/215-5 | | | | 3)NOTE: PLEASE INCLUDE CWP AS PART OF | | THE GROUNDING SYSTEM AT BLDG. 250-50 | | | | 4)NOTE: PLEASE SHOW LOAD CALCULATIONS, | | SOME CONN LOADS SHOWN ON PANEL SCHEDULE | | EXCEED 100A RATING OF PANEL, SOME ARE | | SHOWN UNDER?? PLEASE SUBMIT A LOAD | | CALC PER 220-3,10,11,13 ETC, ANY CONTIN- | | UOUS LOADS AT 125%. 215-3,230-42 ETC | | PLEASE ADJUST SERVICE AS NEEDED BY LOAD. | | | | 5)NOTE: PLEASE SEE MECH PLAN, AHU HEAT | | IS SHOWN AT 5KW, ELECTRICAL PANEL/LOADS | | DO NOT CORRELATE, ELEC SHOWS AHU AT 13A | | AND #12 AWG ON 2P-20??? PLEASE ALSO SEE | | COMP UNIT SHOWN AS 2-P35A ON #12?? | | PLEASE SEE 424-3 FOR OCP OF HEAT. MIN | | 125% OF LOAD. | | | | PLEASE SUBMIT THE ABOVE INFORMATION FOR | | REVIEW. IF THERE ARE ANY QUESTIONS, | | PLEASE CALL. | | | | DEWEY PALMER | | ELECTRICAL PLAN REVIEW | | 561-659-8096 EXT 8372 |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
F |
Date |
2002-12-09 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2002-12-09 |
Time |
13:47 |
Rev Time |
1.00 |
Received By |
dpalmer |
Date |
2002-12-09 |
Time |
13:47 |
Sent To |
|
|
Notes |
2002-12-09 00:00:00 | ******** UNSAT ********* | | | | 1)NOTE: PLEASE SHOW ALL CIRCTUIING ON | | PLANS AND CORRELATE WITH A SUBMITTED | | PANEL.215-5 | | | | 2)NOTE: PLEASE NOTE, NO LOAD CALCULATION | | -S/ PANEL SCHEDULE WERE SUBMITTED. | | 215-5 | | | | 3)NOTE: PLEASE SHOW TRACK LIGHTING CALCS | | PER 220-12B | | | | 4)NOTE: PLEASE NOTE THERE IS NO EQUIP- | | -MENT GROUND BETWEEN METER AND MAIN. | | 250-24, PLEASE ALSO NOTE GROUNDING | | CONDUCTOR SHOWN, IS SHOWN AS #5. PLEASE | | NOTE #5 IS NOT A STANDARD SIZE PER AWG. | | | | 5)NOTE: PLEASE PROVIDE GROUNDING SYSTEM | | AT BLDG. 250-50/ 250-32 | | | | PLEASE NOTE PLANS NEED TO BE COMPLETED | | FOR COMPLETE REVIEW. IF THERE ARE ANY | | QUESTIONS, PLEASE CALL. | | | | DEWEY PALMER | | ELECTRICAL PLAN REVIEW | | 561-659-8096 EXT 8372 |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
2 |
Status |
P |
Date |
2003-02-06 |
|
|
Cont ID |
|
Sent By |
mcarsill |
Date |
2003-02-06 |
Time |
12:03 |
Rev Time |
0.00 |
Received By |
mcarsill |
Date |
2003-02-06 |
Time |
12:03 |
Sent To |
|
|
Notes |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
1 |
Status |
F |
Date |
2002-12-12 |
|
|
Cont ID |
|
Sent By |
mcarsill |
Date |
2002-12-12 |
Time |
13:49 |
Rev Time |
0.00 |
Received By |
mcarsill |
Date |
2002-12-12 |
Time |
13:49 |
Sent To |
|
|
Notes |
2002-12-12 00:00:00 | 1) PLEASE INDICATE IN WRITING HOW | | LONG THE TRAILERS WILL BE AT THIS | | SITE. | | | | 2) BUILDING ADDRESS REQUIRED ON | | BUILDING. | | | | 3) THE INTERIOR STORAGE ROOM SHALL | | BE SEPARATED BY AT LEAST ONE HOUR | | WITH 45 MINUTE OPENING PROTECTIVES. | | | | MIKE CARSILLO, ASSISTANT FIRE MARSHAL | | 659-8096,EXT.8497 | | 835-2910 |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
10 |
Status |
N |
Date |
2003-05-05 |
|
|
Cont ID |
|
Sent By |
shernand |
Date |
2003-05-05 |
Time |
14:02 |
Rev Time |
0.00 |
Received By |
shernand |
Date |
2003-05-05 |
Time |
14:02 |
Sent To |
B |
|
Notes |
2003-05-05 00:00:00 | HP DESK |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
9 |
Status |
N |
Date |
2003-04-17 |
|
|
Cont ID |
|
Sent By |
shernand |
Date |
2003-04-17 |
Time |
09:59 |
Rev Time |
0.00 |
Received By |
shernand |
Date |
2003-04-17 |
Time |
09:58 |
Sent To |
B |
|
Notes |
2003-04-17 00:00:00 | HP DESK |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
8 |
Status |
N |
Date |
2003-04-03 |
|
|
Cont ID |
|
Sent By |
shernand |
Date |
2003-04-03 |
Time |
14:59 |
Rev Time |
0.00 |
Received By |
shernand |
Date |
2003-04-03 |
Time |
14:59 |
Sent To |
E |
|
Notes |
2003-04-03 00:00:00 | LIGHTING FIXTURES SUBMITTAL |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
7 |
Status |
N |
Date |
2003-04-03 |
|
|
Cont ID |
|
Sent By |
shernand |
Date |
2003-04-03 |
Time |
14:56 |
Rev Time |
0.00 |
Received By |
shernand |
Date |
2003-04-03 |
Time |
14:56 |
Sent To |
P |
|
Notes |
2003-04-03 00:00:00 | SUBMITTING FOR PLUMBING FIXTURES & | | ACCESSORIES |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
6 |
Status |
N |
Date |
2003-04-03 |
|
|
Cont ID |
|
Sent By |
shernand |
Date |
2003-04-03 |
Time |
14:49 |
Rev Time |
0.00 |
Received By |
shernand |
Date |
2003-04-03 |
Time |
14:49 |
Sent To |
B |
|
Notes |
2003-04-03 00:00:00 | HP DESK |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
5 |
Status |
N |
Date |
2003-03-26 |
|
|
Cont ID |
|
Sent By |
sthyng |
Date |
2003-03-26 |
Time |
15:30 |
Rev Time |
0.00 |
Received By |
sthyng |
Date |
2003-03-26 |
Time |
15:30 |
Sent To |
B |
|
Notes |
2003-03-26 00:00:00 | TO HP DESK |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
4 |
Status |
N |
Date |
2003-02-20 |
|
|
Cont ID |
|
Sent By |
sgraham |
Date |
2003-02-24 |
Time |
16:37 |
Rev Time |
0.00 |
Received By |
dpalmer |
Date |
2003-02-20 |
Time |
11:32 |
Sent To |
E |
|
Notes |
2003-02-20 00:00:00 | TO DVP'S DESK. |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2003-01-31 |
|
|
Cont ID |
|
Sent By |
btrobaug |
Date |
2003-01-31 |
Time |
18:11 |
Rev Time |
0.00 |
Received By |
btrobaug |
Date |
2003-01-28 |
Time |
18:14 |
Sent To |
|
|
Notes |
2003-01-31 00:00:00 | COM BOARD #3./WRT |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2002-12-03 |
|
|
Cont ID |
|
Sent By |
btrobaug |
Date |
2002-12-03 |
Time |
08:33 |
Rev Time |
0.00 |
Received By |
btrobaug |
Date |
2002-12-03 |
Time |
08:33 |
Sent To |
|
|
Notes |
2002-12-03 00:00:00 | COMM BOARD # 15./WRT |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2002-11-05 |
|
|
Cont ID |
|
Sent By |
btrobaug |
Date |
2002-11-05 |
Time |
16:18 |
Rev Time |
0.00 |
Received By |
btrobaug |
Date |
2002-11-05 |
Time |
16:18 |
Sent To |
Z |
|
Notes |
2002-11-05 00:00:00 | TO ZONING BOX./WRT. |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
2 |
Status |
P |
Date |
2003-02-12 |
|
|
Cont ID |
|
Sent By |
pkrauss |
Date |
2003-02-12 |
Time |
16:28 |
Rev Time |
0.45 |
Received By |
pkrauss |
Date |
2003-02-12 |
Time |
16:05 |
Sent To |
|
|
Notes |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
1 |
Status |
F |
Date |
2002-12-24 |
|
|
Cont ID |
|
Sent By |
pkrauss |
Date |
2002-12-24 |
Time |
09:43 |
Rev Time |
0.45 |
Received By |
pkrauss |
Date |
2002-12-24 |
Time |
09:29 |
Sent To |
|
|
Notes |
2002-12-24 00:00:00 | DENIED: | | | | 1.PLEASE PROVIDE ENERGY & COOLING LOAD | | CALCULATION AS PER 2001 FBC CHAPTER | | 13 SECTION 400.0 & 407.1.ABCD.1. | | | | 2.PLAN SHEET M1 GENERAL HVAC NOTES #2, | | INDICATES CONDENSING UNIT SHALL BE | | A 1.5 TON UNIT.EQUIPMENT SCHEDULE | | INDICATES A 3 TON. PLEASE CORRELATE. | | | | 3.PLEASE CLARIFY R/A LOUVERD DOOR INTO | | THE STORAGE ROOM. AS PER 2001 FBC(M) | | 602.1 RETURN AIR PLENUMS SHALL BE | | LIMITED TO UNINHABITED SPACES, THE | | STORAGE ROOM IS NOT CONSIDERED AN | | UNINHABITED SPACE. | | | | 4.CONDENSATE SHALL DISCHARGE A MINIMUM | | OF 12" AWAY FROM THE BUILDING | | STRUCTURE, 2001 FBC 1503.4.4. | | | | 5.PROVIDE OUTSIDE AIR CALCULATIONS | | AS PER 2001 FBC(M) TABLE 403.3. | | | | 6.EXHAUST FAN SCHEDULE INDICATES FANS | | ARE IN THE CLASS RMS? PLAN INDICATES | | EXHAUST FANS ARE IN THE RESTROOMS. | | | | IF YOU HAVE ANY QUESTIONS, PLEASE | | CONTACT PATTY KRAUSS AT 659-8096 | | EXT. 8388. |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
3 |
Status |
P |
Date |
2003-04-04 |
|
|
Cont ID |
|
Sent By |
kstevens |
Date |
2003-04-04 |
Time |
13:41 |
Rev Time |
0.75 |
Received By |
kstevens |
Date |
2003-04-04 |
Time |
13:39 |
Sent To |
|
|
Notes |
2003-04-04 00:00:00 | SUBMITTALS OK - PLUMBING FIXTURES & | | EQUIPMENT. |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
2 |
Status |
P |
Date |
2003-02-05 |
|
|
Cont ID |
|
Sent By |
shernand |
Date |
2003-04-03 |
Time |
14:56 |
Rev Time |
0.75 |
Received By |
kstevens |
Date |
2003-02-05 |
Time |
09:21 |
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
F |
Date |
2002-12-26 |
|
|
Cont ID |
|
Sent By |
kstevens |
Date |
2002-12-26 |
Time |
11:03 |
Rev Time |
1.50 |
Received By |
kstevens |
Date |
2002-12-26 |
Time |
11:02 |
Sent To |
|
|
Notes |
2002-12-26 00:00:00 | DENIED | | REFERENCE: FBC-2001 PLUMBING | | FBC-2001 CHAPTER 11 | | | | 1) SHT P-1 WASTE AND VENT RISER DOES NOT | | REFLECT FLOOR PLAN. DRINKING FOUNTAIN | | NOT SHOWN ON RISER. | | 2) SHT P-1 WASTE & VENT RISER, VENT REQ- | | UIRED FOR SHOWER & FLOOR SINK, AND VENT | | REQUIRED FOR SINK IN PRO SHOP. | | 3) SHT P-1 INDIRECT WASTE SHALL DRAIN | | TO A FLOOR SINK. 802.3 - FLOOR DRAIN IS | | NOT AN APPROVED WASTE RECEPTOR. | | 4) SHT P-1 WATER RISER DOES NOT REFLECT | | FLOOR PLAN. DRINKING FOUNTAIN NOT SHOWN | | ON WATER RISER DIAGRAM. | | 5) RPZ BACKFLOW REQUIRED ON WATER SERV. | | 6) SHT P-1 WATER HEATER DETAIL, THERMAL | | EXPANSION CONTROL REQUIRED PER 607.3.2. | | PLEASE SHOW ON DETAIL | | | | REVIEW BY KEN STEVENS | | (561) 659-8096 EXT 8377 |
|
|
Review Stop |
Z |
ZONING |
Rev No |
4 |
Status |
P |
Date |
2003-02-24 |
|
|
Cont ID |
|
Sent By |
sthyng |
Date |
2003-03-26 |
Time |
15:30 |
Rev Time |
1.00 |
Received By |
lsmith |
Date |
|
Time |
|
Sent To |
B |
|
Notes |
2003-02-25 00:00:00 | PER AG 2/24/03 (SEE PLANS) |
|
|
Review Stop |
Z |
ZONING |
Rev No |
3 |
Status |
P |
Date |
2003-02-24 |
|
|
Cont ID |
|
Sent By |
sgraham |
Date |
2003-02-24 |
Time |
16:37 |
Rev Time |
0.00 |
Received By |
sgraham |
Date |
|
Time |
|
Sent To |
I |
|
Notes |
|
|
Review Stop |
Z |
ZONING |
Rev No |
2 |
Status |
P |
Date |
2003-02-24 |
|
|
Cont ID |
|
Sent By |
lmartine |
Date |
2003-02-24 |
Time |
16:13 |
Rev Time |
1.00 |
Received By |
lmartine |
Date |
|
Time |
|
Sent To |
|
|
Notes |
2003-02-24 00:00:00 | APPROVED BY SHIRLEY2/24/03 LM |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
F |
Date |
2002-11-25 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2003-02-21 |
Time |
15:39 |
Rev Time |
0.25 |
Received By |
sgraham |
Date |
|
Time |
|
Sent To |
|
|
Notes |
2002-11-25 00:00:00 | DENIED, NEED TO GO TO THE DAC BOARD |
|
|