Plan Review Details - Permit 02101405
Plan Review Stops For Permit 02101405
Review Stop E ELECTRICAL
Rev No 1 Status P Date 2002-11-04 Cont ID  
Sent By btrobaug Date 2002-11-04 Time 16:25 Rev Time 0.50
Received By btrobaug Date 2002-11-04 Time 15:36 Sent To R
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2002-12-02 Cont ID  
Sent By btrobaug Date 2002-12-02 Time 17:09 Rev Time 0.00
Received By btrobaug Date 2002-12-02 Time 17:09 Sent To R
Notes
2002-12-02 00:00:00TO ROB M./WRT.

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2002-11-02 Cont ID  
Sent By jleech Date 2002-11-02 Time 08:10 Rev Time 0.33
Received By jleech Date 2002-11-02 Time 08:10 Sent To  
Notes
2002-11-02 00:00:00PROVISO;
 FAN SHUTDOWN REQUIRED FOR FINAL A/C
 INSPECTION.
 DRYER VENT THRU ROOF -O- LOT SIDE.

Review Stop P PLUMBING
Rev No 1 Status P Date 2002-11-02 Cont ID  
Sent By jleech Date 2002-11-02 Time 08:13 Rev Time 0.25
Received By jleech Date 2002-11-02 Time 08:13 Sent To  
Notes
***NONE***

Review Stop R ROOF PLAN REVIEW
Rev No 2 Status P Date 2002-12-03 Cont ID  
Sent By rmcdouga Date 2002-12-03 Time 10:54 Rev Time 0.00
Received By rmcdouga Date   Time   Sent To  
Notes
2002-12-03 00:00:00SUBMITTED SOILS TEST REPORT AND PRODUCT
 APPROVAL FOR FIXED GLASS WINDOWS.

Review Stop R ROOF PLAN REVIEW
Rev No 1 Status P Date 2002-11-27 Cont ID  
Sent By btrobaug Date 2002-12-02 Time 17:10 Rev Time 4.00
Received By rmcdouga Date   Time   Sent To  
Notes
2002-11-27 00:00:00BUILDING PROVISO
  
 1) A RECORDED COPY OF THE NOTICE OF
 COMMENCEMENT MUST BE SUBMITTED BEFORE A
 PERMIT CAN BE ISSUED.
  
 2) SUBMIT A SOIL TEST REPORT FROM A
 SOILS ENGINEER INDICATING THE SAFE
 BEARING CAPACITY OF THE SOIL PRIOR TO
 POURING THE FOUNDATION AS REQUIRED BY
 CITY AMENDMENTS SECTION 1804.2.2. A
 SOIL DENSITY TEST IS ALSO REQUIRED.
  
 3) SUBMIT A SIGNED AND SEALED DETAIL,
 INDICATING THE CONNECTION OF THE SECOND
 FLOOR WOOD FRAME EXTERIOR BEARING WALL
 TO THE WOOD FLOOR TRUSSES.
  
 4) SUBMIT SIGNED & SEALED DRAWINGS OF
 THE BUCKET CONNECTOR SHOWN IN DETAIL D
 ON S2.
  
 5) SUBMIT SIGNED AND SEALED DETAIL WHICH
 INDICATES THE DIMENSIONS AND REINFORCING
 FOR THE F4 FOOTINGS INDICATED ON S1.
  
 6)PROVIDE (2) CURRENT AND COMPLETE
 COPIES OF SBCCI OR METRO-DADE PRODUCT
 APPROVALS FOR THE FIXED GLASS WINDOWS
 PRIOR TO INSTALLATION.

Review Stop Z ZONING
Rev No 1 Status P Date 2002-10-25 Cont ID  
Sent By btrobaug Date 2002-12-02 Time 17:09 Rev Time 0.25
Received By sgraham Date   Time   Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved