Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status P Date 2003-04-17 Cont ID  
Sent By lmartine Date 2003-04-17 Time 11:00 Rev Time 1.00
Received By lmartine Date   Time   Sent To  
Notes
2003-04-17 00:00:00ELECTRICAL REVISIONS WILL BE REQUIRED
 FOR TRACK LIGHTING

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status F Date 2003-01-28 Cont ID  
Sent By hpiskura Date 2003-01-28 Time 13:34 Rev Time 0.00
Received By hpiskura Date 2003-01-28 Time 13:34 Sent To  
Notes
2003-01-28 00:00:00S SHEETS REV 1 DATED 12/6/02.
 SHOW THE FLOOR DESIGN LOADS FOR THE
 ELEVATED DISPLAY AREAS.SEE FBC 104.2.
  
 A SHEETS REV 3 DATED 11/02.
  
 SHOW HOW THE ELEVATED DISPLAY AREAS WILL
 BE ACCESSED, (EGRESS) SEE FBC 104.2.
  
 THE ADDITIONAL 800 +/- SQUARE FEET OF
 AREA ARE SUBJECT TO IMPACT FEES
 COLLECTED BY THE COUNTY.THE REVISED
 PLANS MUST BE STAMPED BY THAT OFFICE
 AND A COPY OF THE PAID RECEIPT ATTACHED
 TO THE PLAN BEFORE CONSTRUCTION
 APPROVALS CAN BE GRANTED.CALL
 561-233-5025 FOR MORE INFORMATION.
  
 THE ADDITIONAL PERMIT FEES ARE DUE TO
 THE CITY FOR THE ADDED CONTRACT VALUE
 OF THE WORK.

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2002-12-05 Cont ID  
Sent By hpiskura Date 2002-12-04 Time 16:09 Rev Time 0.00
Received By drunnels Date 2002-12-04 Time 10:50 Sent To  
Notes
2002-12-04 00:00:00BEFORE THE PERMIT MAY BE ISSUED, THE
 IMPACT FEES MUST BE PAID TO THE COUNTY
 AND THE PLANS STAMPED BY THAT OFFICE.
  
 A COPY OF THE RECORDED NOTICE OF
 COMMENCEMENT MUST BE PROVIDED TO THE
 CITY.
  
 A THIRD SET OF PLANS FOR THE RESIDENT IN
 SPECTOR IS REQUIRED.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2002-10-23 Cont ID  
Sent By hpiskura Date 2002-10-23 Time 13:50 Rev Time 0.00
Received By hpiskura Date 2002-10-22 Time 12:07 Sent To Z
Notes
2002-10-23 00:00:00THE BUILDING DATA INFORMATION ON SHEET
 SP-1 IS NOT CLEAR.THE FLOOR AREAS
 CITED DO NOT AGREE WITH FBC TABLE 500
 FOR TYPE IV CONSTRUCTION.WILL THE
 BUILDING BE FIRE SPRINKLERED?THE FIRE
 SPRINKLER PLANS NOTED ON THE COVER
 SHEET ARE NOT INCLUDED WITH THESE PLANS.
  
 THIS PLAN REVIEW ASSUMES A TYPE IV FIRE
 SPRINKLERED BUILDING WAS INTENDED.
  
 SHOW THE METHOD OF VENTILATION FOR THE
 REPAIR GARAGE IN ACCORDANCE WITH FBC
 411.5.5.
  
 THE AREAS SHOWN AS "DELIVERY" AND
 "SERVICE" CANOPIES ARE BUILDING AREA
 AND NOT CANOPIES AS PROVIDED FOR IN FBC
 3106.2. (>15' PROJECTION)AS SUCH THEY
 ARE SUBJECT TO SPRINKLER REQUIREMENTS
 AND TABLE 600, PARTICULARLY THE WEST
 ELEVATION.PLEASE REVISE AS NECESSARY.
  
 ON CONSTRUCTION OF THIS NATURE, (TILT
 SLAB), THE BUILDING OFFICIAL WILL
 REQUIRE A RESIDENT INSPECTOR.CONTACT
 DON NEELY AT 561-659-8096 X 8333 FOR
 MORE INFORMATION.
  
 BEFORE A PERMIT TO CONSTRUCT MAY BE
 ISSUED, IMPACT FEES MUST BE PAID TO THE
 COUNTY, THE PERMIT PLANS STAMPED BY
 THAT OFFICE AND A COPY OF THE PAID
 RECEIPT ATTACHED TO THE PERMIT
 APPLICATION.CALL 561-233-5025 FOR
 MORE INFORMATION.
  
 IF PRODUCT TEST REPORTS FOR THE DOORS,
 WINDOWS AND ROOF COVERING ARE NOT
 INCLUDED WITH THIS PERMIT APPLICATION,
 A SEPARATE PERMIT AND FEES WILL BE
 REQUIERED FOR THAT PORTION OF THE WORK.
  
 SHOW HOW THE GLAZED PORTIONS OF THE
 EXTERIOR ENVELOPE WILL RESIST HURRICANE
 MISSILE IMPACT.SEE FBC 1606.1.4.

Review Stop E ELECTRICAL
Rev No 3 Status P Date 2003-01-23 Cont ID  
Sent By dpalmer Date 2003-01-23 Time 07:27 Rev Time 0.33
Received By dpalmer Date 2003-01-23 Time 07:27 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2002-11-14 Cont ID  
Sent By dpalmer Date 2002-11-14 Time 15:59 Rev Time 1.00
Received By dpalmer Date 2002-11-14 Time 15:59 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2002-10-03 Cont ID  
Sent By dpalmer Date 2002-10-03 Time 10:26 Rev Time 2.00
Received By dpalmer Date 2002-10-03 Time 10:23 Sent To  
Notes
2002-10-03 00:00:00*************** UNSAT ***************
  
 1)NOTE: PLEASE NOTE PLANS NEED TO BE
 COMPLETED FOR SUFFICIENT REVIEW.
 PLEASE NOTE THERE ARE MANY ITEMS THAT
 MISSINGAND/OR DO NOT CORRELATE.
  
  
  
 PLEASE SUBMIT THE ABOVE INFORMATION FOR
 REVIEW. IF THERE ARE ANY QUESTIONS,
 PLEASE CALL.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 561-659-8096 EXT 8372

Review Stop ENG ENGINEERING CSD
Rev No 2 Status N Date 2002-11-07 Cont ID  
Sent By mamini Date 2002-11-07 Time 15:34 Rev Time 1.00
Received By mamini Date 2002-11-07 Time 15:34 Sent To  
Notes
2002-11-07 00:00:00N/A
 1. SEE # 02110492 FOR UNDERGROUND
 UTILITIES PERMIT.
 IF ANY QUESTION PLEASE CONTACT 659-8096
 EXT. 8492 MOHAMMAD R. AMINI`

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2002-10-09 Cont ID  
Sent By mamini Date 2002-10-09 Time 14:01 Rev Time 5.00
Received By mamini Date 2002-10-09 Time 14:01 Sent To  
Notes
2002-10-09 00:00:00FAILED:
 1. PLEASE PROVIDE STORM WATER
 CALCULATIONS FOR THE PROPOSED SITE.
 2. PLEASE PROVIDE A COPY OF SFWMD PERMIT
 3. PERMIT FORM F.D.O.T, FOR DISCHARGING
 INTO THE 70' DRAINAGE EASEMENT MUST BE
 OBTAINED.
 4. ANY WORK WITHIN PUBLIC R.O.W WOULD
 REQUIRE PERMIT FOM PALM BEACH COUNTY &
 CWP PUBLIC UTILITIES 659-8040.
 5. ALL PARKING STALLS MUST BE PAINTED
 WITH DOUBLE 4" STRIPE, SEE ARCHITECTURAL
 DWG. SP-2.
 6. ALL CONNECTION TO CITY SERVICES MUST
 APPROVED BY CWP PUBLIC UTILITIES,
 659-8040
 7. FOR THE INSTALLATION/INSPECTION AND
 SIZE OF THE PROPOSED OIL/WATER SEPARATOR
 CONTACT RODNEY COMPO, 837-4051 EXT. 4074
 8. * PLEASE NOTE THAT A SEPARATE PERMIT*
 * APPLICATION AND FEES FOR THE*
 * UNDERGROUND UTILITIES/ SITE WORKS *
 * IS REQUIRED. *
 IF ANY QUESTIONS PLEASE CONTACT 659-8096
 EXT. 8492 MOHAMMAD R. AMINI

Review Stop FIRE FIRE DEPARTMENT
Rev No 3 Status P Date 2003-01-24 Cont ID  
Sent By mcarsill Date 2003-01-24 Time 11:13 Rev Time 0.00
Received By mcarsill Date 2003-01-24 Time 11:13 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2002-11-14 Cont ID  
Sent By mcarsill Date 2002-11-14 Time 14:12 Rev Time 0.00
Received By mcarsill Date 2002-11-14 Time 14:12 Sent To  
Notes
2002-11-14 00:00:001) IT APPEARS THAT A FIRE HYDRANT IS
 MISSING FROM THE PARKING AREA. PLEASE
 REVIEW PREVIOUS PLANS FOR THE LOCATION
 OF THE SECOND FIRE HYDRANT.
  
 2) THE SIX INCH GATE VALVE LOCATED NEAR
 THE 8X6 TEE SHALL BE AN INDICATING TYPE
 VALVE.
  
 3) A KNOX-BOX WILL BE REQUIRED.
  
 4) PROVIDE SEPARATE PLANS AND PERMITS
 FOR FIRE SPRINKLER AND FIRE ALARM
 SYSTEM.
  
 5) ENSURE EMERGENCY LIGHTING THROUGHOUT.
  
 MIKE CARSILLO, ASSISTANT FIRE MARSHAL
 659-8096,EXT.8497
 835-2910

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status F Date 2002-10-04 Cont ID  
Sent By mcarsill Date 2002-10-04 Time 16:10 Rev Time 0.00
Received By mcarsill Date 2002-10-04 Time 16:10 Sent To  
Notes
2002-10-04 00:00:001) WET FIRE HYDRANTS ARE REQUIRED PRIOR
 TO, DURING AND AFTER CONSTRUCTION.
  
 2) PLEASE INDICATE ON PLANS HOW THE
 MOTORCYCLES WILL BE DISPLAYED IN
 SHOWROOM. PLEASE INDICATE PROPOSED
 FUEL AND BATTERY ARRANGEMENTS.
  
 3) NO CHANGES OF ELEVATIONS PERMITTED
 AT EXIT DOORS. ELEVATIONS ARE TO BE THE
 SAME FOR AT LEAST THE WIDTH OF THE
 DOOR.
  
 4) BUILDING ADDRESS REQUIRED.
  
 5) WILL THERE BE ANY PAINTING OR WELDING
 CONDUCTED ON SITE.
  
 6) NO FIRE SPRINKLER SYSTEM PLANS OR
 HYDRAULIC CALCULATIONS PROVIDED.
  
 7) SEPARATE PLANS AND PERMITS REQUIRED
 FOR FIRE ALARM SYSTEM INSTALLATION.
  
 MIKE CARSILLO, ASSISTANT FIRE MARSHAL
 659-8096,EXT.8497
 835-2910

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2002-12-27 Cont ID  
Sent By dpalmer Date 2002-12-27 Time 12:45 Rev Time 0.00
Received By dpalmer Date 2002-12-27 Time 12:45 Sent To  
Notes
2002-12-27 00:00:00TO COMM BOARD #55

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2002-11-05 Cont ID  
Sent By btrobaug Date 2002-11-05 Time 13:51 Rev Time 0.00
Received By btrobaug Date 2002-11-05 Time 13:51 Sent To  
Notes
2002-11-05 00:00:00TO COMM BOARD #19./WRT.

Review Stop M MECHANICAL (A/C)
Rev No 3 Status P Date 2003-01-10 Cont ID  
Sent By pkrauss Date 2003-01-10 Time 14:59 Rev Time 0.35
Received By pkrauss Date 2003-01-10 Time 14:50 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2002-11-22 Cont ID  
Sent By pkrauss Date 2002-11-22 Time 13:57 Rev Time 0.50
Received By pkrauss Date 2002-11-22 Time 13:57 Sent To  
Notes
2002-11-22 00:00:00PROVISO:MECHANICAL PERMIT 02100418
  
 PROVIDE MANUFACTURER SUBMITTAL DATA ON
 THE ENERGY RECOVERY VENTILATOR PRIOR TO
 INSPECTION.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE
 CONTACT PATTY KRAUSS AT 659-8096
 EXT. 8388.

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2002-10-02 Cont ID  
Sent By hmoser Date 2002-10-02 Time 16:23 Rev Time 2.00
Received By hmoser Date 2002-10-02 Time 16:23 Sent To  
Notes
2002-10-02 00:00:00PASS/PRIVISO
 1) ALL DUCT,DUCT REINFORCEMENT,DUCT SAG
 SUPPORTS.TO BE INSTALLED TO SMACA
 STANDARDS
 2) A/C DUCT IN ROOM 121 MUST HAVE
 FIRE DAMPER.REFER TO SECTION 607.1.3
 FOR EXECPTIONS
 3) NEED MANUFACTURER INSTRUCTIONS
 ENERGY RECOVERY VENTILATOR
 PLAN REVIEW BY HAROLD MOSER
 (561)659-8096 EXT 8390

Review Stop P PLUMBING
Rev No 2 Status P Date 2002-11-20 Cont ID  
Sent By kstevens Date 2002-11-20 Time 21:45 Rev Time 1.00
Received By kstevens Date 2002-11-20 Time 21:44 Sent To  
Notes
2002-11-20 00:00:00PASSED/PROVISO
  
 THERMAL EXPANSION CONTROL REQUIRED

Review Stop P PLUMBING
Rev No 1 Status F Date 2002-10-12 Cont ID  
Sent By kstevens Date 2002-10-12 Time 09:30 Rev Time 0.00
Received By kstevens Date 2002-10-12 Time 09:30 Sent To  
Notes
2002-10-12 00:00:00DENIED
 REFERENCE: FBC-2001 CHAPTER 11
 FBC-2001 PLUMBING
 FBC-2001
  
 1) SHT CIVIL 6 0F 9 OIL/WATER SEPARATOR
 DETAIL, 2 WAY CLEAN OUTS ARE REQUIRED.
 2) FOR OIL/WATER SEPARATOR SIZE CONTACT
 RODNEY COMPO, ENVIRONMENTAL COMPLIANCE
 MANAGER, (561) 837-4074. WASTE ORD. #
 2938-96
 3) SHT LP-1 SEPARATE IRRIGATION PERMIT
 IS REQUIRED.
 4) SHT A-1 MINIMUM FACILITIES CALLS FOR
 3 DRINKING FOUNTAINS. 2 HI/LOW DRINKING
 FOUNTAINS ARE SHOWN WHICH COUNT AS 2.
 SEE SECTION 410.1 A WATER COOLER CAN BE
 USED AS A THIRD DRINKING FOUNTAIN. IF
 USED IT SHALL COMPLY WITH ARI-1010.
 PLEASE PROVIDE MANUFACTURE CUT SHEETS.
 5) SHT A-1.3 DETAIL #7 LIFT PLATFORM PIT
 SHOWS A DRAIN, BUT NO PIPING IS INDICAT-
 ED OR SHOWN. PLEASE CLAIRFY.
 6) SHT A-2 PLEASE PROVIDE CALCULATIONS
 FOR PRIMARY AND SECONDARY ROOF DRAINS.
 SHOW TOTAL SQUARE FOOTAGE OF ROOF AREA
 INCLUDING 1/2 AREA OF ALL VERTICAL WALLS
 SHOW SQUARE FOOTAGE FOR EACH ROOF DRAIN.
 SHOW LOCATION AND SIZE FOR SECONDARY
 ROOF DRAINS.
 7) SHT A-8 FINISH SCHEDULE. THE WALLS OF
 ALL PUBLIC RESTROOMS SHALL BE LINED WITH
 A NON ABSORBENT MATERIAL TO A HEIGHT OF
 4 FEET. SEC 1204.2 - PLEASE INDICATE THE
 PAINT TYPE FOR WALLS.
 8) SHT A-9 DETAIL #7 WATER CLOSET SHALL
 BE SET 1'6" OFF WALL TO CENTER, NOT 1'4"
 AS SHOWN. LAV SHALL BE SET 34" TO FLOOD
 RIM LEVEL.
 9) SHT A-9 DETAIL #14 W/C TO BE SET 1'6"
 TO CENTER OFF WALL NOT 1'4" AS SHOWN.
 10) SHT A-10 DETAIL #16 SHOW DETAIL FOR
 BENCH PER 11-4.35.4
 11) SHT M-4 PLUMBING NOTES: NUMBERING
 SECQUENCE NOT CONSISTANT. #'S 10-11-12
 REPETE. SECOND #10 REFERS TO AIR CHAMB-
 ERS WHICH ARE NOT APPROVED. PLEASE DE-
 LETE REFERENCE AND RE-NUMBER NOTES.
 12) SHT M-4 RELIEF (T/P) VALVE DISCHARGE
 SHALL NOT BE TRAPPED. SEC 504.7.1
 WATER HEATER REQUIRES THERMAL EXPANSION
 CONTROL. SEC 607.3.2. PLEASE SHOW ON DE-
 TAIL.
  
 REVIEW BY KEN STEVENS
 (561) 659-8096 EXT 8377

Review Stop Z ZONING
Rev No 1 Status P Date 2003-05-06 Cont ID  
Sent By hpiskura Date 2002-10-23 Time 14:14 Rev Time 0.25
Received By sgraham Date   Time   Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy