2002-09-17 00:00:00 | CHECKLIST: |
| 1-PROVIDE ENGINEERING ANALYSIS/CALCS |
| SHOWING HOW FLOOR AND ROOF DIAPHRAGMS |
| TRANSFER ALL LOADS CONSIDERING THE |
| DOUBLE CEILING AREA AND THE PARTIAL |
| FL. DIAPHRAGM SUPPORTED ON WD COLUMNS |
| WITH TOP AND BOTTOM CONNECTORS THAT |
| DON'T TRANSFER RESIST LATERAL LOADS. |
| SEC. 1606.2.4 FBC 2001 & SEC 104.2.1.2 |
| CITY AMENDMENTS TO FBC 2001. |
| 2-NEED RECORDED NOTICE OF COMMENCEMENT. |
| 3-PROVIDE COMPLETE/CORRECT INFORMATION |
| FOR STORM SHUTTERS. |
| 4-PROVIDE PRODUCT APPROVAL FOR GARAGE |
| SIDE DOOR AND PRODUCT APPROVAL WITH |
| LEGIBLE DRAWINGS FOR GARAGE DOORS. |
| 5-SPECIFY FIREBLOCKING MATERIAL AND LO- |
| CATION AT STAIRS. SEE SEC. 2305.1.4. |
| 6-PROVIDE GENERAL SPECIFICATIONS FOR |
| REQUIRED FIREBLOCKING AT ALL CONCEALED |
| SPACES. SEE SEC. 2305.1.4 FBC 2001. |
| 7-SHEET C-1: REVISE FOUNDATION NOTE. USE |
| 0.006 MIL VISQUEEN MIN. SEC. 1909.2. |
| 8-PROVIDE SAFETY GLASS IN WINDOW AT 1ST |
| FLOOR BATHROOM. SEC. 2405.2 FBC 2001. |
| 9-PROVIDE STRUCTURAL DETAIL AT RECESSED |
| WINDOWS TO ALLOW FOR STORM SHUTTERS |
| INSTALLATION. SEE PRODUCT APPROVAL FOR |
| LIMITATIONS AND REQUIRED ENGINEERING. |
| 10-24SH WINDOW AT MASTER BEDROOM DOESN'T |
| PROVIDE 24" MIN. CLEAR HT. & 5.7 S.F. |
| MIN. CLEAR OPENING. SEC. 1005.4.4 FBC. |
| 11-REVISE NOTE #1 ON STAIR KEY NOTES. |
| HEIGHT OF HANDRAIL TO BE BET. 34" AND |
| 38" HIGH MAX. SEE SEC. 1007.5.1 FBC. |
| 12-SHEET A-7: A) SOME INFORMATION IS |
| OVERLAPPING. B)NOTE #9: REVISE SIZE |
| OF LEDGER. SEE 2ND FLOOR FRAMING PLAN. |
| C)REVISE HANDRAIL HEIGHT ON STAIR |
| SECTION AS WELL. |
| 13-SHEET S-1: A) CLARIFY REINFORCING FOR |
| FOOTING F5530. B) LINTEL SCHEDULE DOES |
| NOT MATCH PLANS. REVISE AS REQUIRED. |
| 14-SPECIFY FIRECUT REQUIREMENTS ON THE |
| STRUCTURAL WALL SECTIONS. SEC. 2305.4. |
| 15-REVISE TRUSS CONNECTOR SCHEDULE TO |
| MATCH USP PUBLISHED VALUES OR PROVIDE |
| ENGINEERED CALCS FOR DIFFERENT VALUES. |
| 16-SHEET S-2: SECTION 1 AND SECTION 2 |
| HAVE DIFFERENT SPECS. REVISE AS REQ'D. |
| 17-ROOF SHEATHING & NAILING STATEMENT & |
| DIAPHRAGM SCHEDULE HAVE DIFFERENT |
| SPECS. CLARIFY/REVISE AS REQUIRED. |
| 18-IDENTIFY ROOF NAILING ZONES. SEE |
| TABLE 2306.1 CITY AMENDMENTS TO FBC. |
| 19-SPECIFY CONNECTORS FOR GIRDER TRUSS |
| AT GARAGE ROOF FRAMING PLAN. SECTION |
| 104.2.1.2 CITY AMENDMENTS TO FBC 2001. |
| 20-REVISE ENERGY CALCULATIONS: |
| A)A/C AREA DOESN'T MATCH PLANS. |
| B)THERE IS NOT ADJACENT FRAMING, BUT |
| ADJACENT MASONRY. REVISE AS REQUIRED. |
| C)OWNER/AGENT TO DATE BOTTOM OF FORM |
| WHEN SIGNING IT. |
| 21-SEE GARAGE DOOR PRODUCT APPROVAL FOR |
| STRUCTURAL BUCK REQUIREMENTS & REVISE |
| DETAIL AS REQUIRED. SPECIFY WASHER |
| SIZE. SEC. 104.2.1.2 CITY AMENDMENTS. |
| 22-SHEET S-1: CLARIFY TYP. DETAIL AT |
| BOND BEAM ELEVATION CHANGE. IS IT 1#7 |
| OR 1#5?. SEE BB SPECS. |
| ALSO, CLARIFY REINFORCEMENT FOR PRIVA- |
| CY WALL. IS IT 1#7 OR 2#5?. SEE FLOOR |
| PLAN AND SECTION 6. |
| 23-SHEET A-2: UPDATE PLUMBING NOTE. USE |
| FPC 2001, NOT SBC 1994. |
| 24-SPECIFY SPACING FOR WWM SUPPORTS IN |
| CONCRETE SLAB. SEC. 1909.3 FBC 2001. |
| 25-REVIEW ROOF FRAMING PLAN AND REVISE |
| AS REQUIRED: SOME SPECIFIED CONNECTORS |
| DON'T RESIST THE UPLIFT LOADS THAT |
| WERE CALCULATED ON ROOF FRAMING PLAN. |
| SEC. 104.2.1.2 CITY AMENDMENTS TO FBC. |