Plan Review Details - Permit 02080229
Plan Review Stops For Permit 02080229
Review Stop E ELECTRICAL
Rev No 1 Status P Date 2002-08-19 Cont ID  
Sent By btrobaug Date 2002-08-19 Time 07:49 Rev Time 0.00
Received By btrobaug Date 2002-08-19 Time 07:27 Sent To R
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2002-11-21 Cont ID  
Sent By btrobaug Date 2002-11-21 Time 15:11 Rev Time 0.00
Received By btrobaug Date 2002-11-21 Time 15:11 Sent To R
Notes
2002-11-21 00:00:00TO ROB M./WRT

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2002-08-17 Cont ID  
Sent By hmoser Date 2002-08-17 Time 09:22 Rev Time 0.50
Received By hmoser Date 2002-08-17 Time 09:21 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 3 Status P Date 2002-10-05 Cont ID  
Sent By jleech Date 2002-10-05 Time 07:59 Rev Time 0.33
Received By jleech Date 2002-10-05 Time 07:59 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status F Date 2002-09-07 Cont ID  
Sent By kstevens Date 2002-09-07 Time 07:50 Rev Time 0.00
Received By kstevens Date 2002-09-07 Time 07:50 Sent To  
Notes
2002-09-07 00:00:00DENIED
 REFERENCE: FBC-2001 PLUMBING
  
 1) ONLY THE FIXTURES WITHIN THE BATHROOM
 GROUPS SHALL CONNECT TO THE WET-VENTED
 HORIZONTAL BRANCH DRAIN. SEC 909.1
 ANY ADDITIONAL FIXTURES SHALL DISCHARGE
 DOWNSTREAM OF THE WET VENT. - THE LAUN-
 DRY TRAY SHALL BE TIED IN DOWNSTREAM OF
 THE VENT LINE FOR THE WATER CLOSET. SEE
 RED LINE ON SHEET 1 SUBMITTED.
 2) SANITARY RISER DIAGRAM SHALL REFLECT
 THE FLOOR PLAN. IF THE BLDG DRAIN IS
 ENTERING THE BLDG FROM THE FRONT THEN
 THE MASTER BATH SHALL BE SHOWN ON THE
 RIGHT SIDE OF THE BLDG DRAIN AND BATH
 #2 ON THE LEFT SIDE OF THE BLDG DRAIN
 TO REFLECT THE FLOOR PLAN.
  
 REVIEW BY KEN STEVENS
 (561) 659-8096 EXT 8377

Review Stop P PLUMBING
Rev No 1 Status F Date 2002-08-17 Cont ID  
Sent By jleech Date 2002-08-17 Time 07:08 Rev Time 0.33
Received By jleech Date 2002-08-17 Time 07:08 Sent To  
Notes
2002-08-17 00:00:00DENIED;
 PLUMBING RISER DIAGRAM. LAUNDRY TUB IS
 NOT PERMITED TO DISCHARGE INTO THE WET
 VENT SYSTEM OF A BATHROOM GROUP. 2001
 FBC PLUMBING SEC. 909.1.
 PLUMBING PLAN REVIEW BY;
 JOHN LEECH
 659-8096 EXT. 8369

Review Stop R ROOF PLAN REVIEW
Rev No 1 Status P Date 2002-08-26 Cont ID  
Sent By btrobaug Date 2002-11-21 Time 15:11 Rev Time 4.00
Received By rmcdouga Date   Time   Sent To  
Notes
2002-08-26 00:00:00************BUILDING PROVISO************
  
 1)PROVIDE (2) CURRENT AND COMPLETE
 COPIES OF SBCCI OR METRO-DADE PRODUCT
 APPROVALS FOR:
 - ARCHED TOP WINDOW SHOWN ON REAR
 ELEVATION.
  
 2) THE ROOF FRAMING PLAN ON SHEET 3B
 DOES NOT INDICATE ANY TRUSS ANCHORS OR
 UPLIFTS. THE ANCHOR SCHEDULE INDICATES
 THAT ALL TRUSSES ARE TO BE ANCHORED TO
 THE CONCRETE BEAM WITH ONE SIMPSON HETAL
 OR USP TA/R AND UPLIFT IS LISTED AS
 1383#. IF THE UPLIFT GIVEN ON THE TRUSS
 DRAWINGS EXCEEDS 1383#, A REVISED ROOF
 FRAMING PLAN WILL BE REQUIRED TO BE
 SUBMITTED FOR APPROVAL.

Review Stop Z ZONING
Rev No 1 Status P Date 2002-08-08 Cont ID  
Sent By sgraham Date 2002-08-08 Time 15:19 Rev Time 0.25
Received By sgraham Date   Time   Sent To  
Notes
***NONE***