Plan Review Details - Permit 02080204
Plan Review Stops For Permit 02080204
Review Stop E ELECTRICAL
Rev No 1 Status P Date 2002-08-19 Cont ID  
Sent By btrobaug Date 2002-08-19 Time 07:26 Rev Time 0.00
Received By btrobaug Date 2002-08-19 Time 07:13 Sent To R
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2002-11-21 Cont ID  
Sent By btrobaug Date 2002-11-21 Time 15:25 Rev Time 0.00
Received By btrobaug Date 2002-11-21 Time 15:25 Sent To R
Notes
2002-11-21 00:00:00TO ROB M./WRT

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2002-11-01 Cont ID  
Sent By dpalmer Date 2002-11-01 Time 13:15 Rev Time 0.00
Received By dpalmer Date 2002-11-01 Time 13:15 Sent To B
Notes
2002-11-01 00:00:00TO ROBERT MCD.

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2002-08-17 Cont ID  
Sent By hmoser Date 2002-08-17 Time 07:59 Rev Time 0.50
Received By hmoser Date 2002-08-17 Time 07:59 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status P Date 2002-12-07 Cont ID  
Sent By kstevens Date 2002-12-07 Time 13:04 Rev Time 0.50
Received By kstevens Date 2002-12-07 Time 13:04 Sent To  
Notes
2002-12-07 00:00:00REVISION OK - SANT. RISER DIAGRAM

Review Stop P PLUMBING
Rev No 1 Status P Date 2002-08-17 Cont ID  
Sent By jleech Date 2002-08-17 Time 06:40 Rev Time 0.33
Received By jleech Date 2002-08-17 Time 06:40 Sent To  
Notes
***NONE***

Review Stop R ROOF PLAN REVIEW
Rev No 2 Status P Date 2002-09-17 Cont ID  
Sent By btrobaug Date 2002-11-21 Time 15:25 Rev Time 2.00
Received By rmcdouga Date   Time   Sent To  
Notes
2002-09-17 00:00:00************BUILDING PROVISO************
  
 1) STRUCTURE IS LOCATED IN AN "AO"
 FLOOD ZONE AN ELEVATION CERTIFICATE IS
 REQUIRED.
  
 2)PROVIDE (2) CURRENT AND COMPLETE
 COPIES OF SBCCI OR METRO-DADE PRODUCT
 APPROVALS FOR THE ARCHED TOP FIXED GLASS
 WINDOW IN BEDROOM #3.

Review Stop R ROOF PLAN REVIEW
Rev No 1 Status F Date 2002-08-29 Cont ID  
Sent By btrobaug Date 2002-08-19 Time 07:27 Rev Time 4.00
Received By rmcdouga Date   Time   Sent To  
Notes
2002-08-29 00:00:00BUILDING PLAN REVIEW
 *******DENIED*******
  
 1) STRUCTURE IS LOCATED IN AN "AO" FLOOD
 ZONE AN ELEVATION CERTIFICATE WILL BE
 REQUIRED.
  
 2) PROVIDE A DETAIL INDICATING HOW A/C
 EQUIPMENT WILL BE SUSPENDED FROM THE
 TRUSSES. THIS INFORMATION IS ALSO TO BE
 PROVIDED TO THE TRUSS ENGINEER.
  
 3)PROVIDE (2) CURRENT AND COMPLETE
 COPIES OF SBCCI OR METRO-DADE PRODUCT
 APPROVALS FOR:
 - ARCHED TOP FIXED GLASS WINDOW SHOWN ON
 PLANS AT BEDROOM #3.
 - STORM PANELS (PRODUCT APPROVAL WAS NOT
 WITH THE KEY PLAN AND INSTALLATION
 SCHEDULE)
  
 4) NO UPLIFT VALUES OR TRUSS ANCHORS ARE
 SPECIFIED ON THE ROOF FRAMING PLAN ON
 3A. THE ANCHORAGE SCHEDULE ON 3A
 SPECIFIES THAT CONNECTORS B OR F BE USED
 UNLESS OTHERWISE NOTED. PLEASE CLARIFY
 IF THESE CONNECTORS WILL BE ADEQUATE TO
 RESIST ALL LOADS.
  
 5) THE LINTEL OVER THE SLIDING GLASS
 DOOR AT THE LIVING ROOM IS NOT SHOWN ON
 THE ROOF FRAMING PLAN ON 3A. PLEASE
 PROVIDE A PRECAST LINTEL SCHEDULE FOR
 LINTELS THAT ARE BEING USED.
  
 6) THE COVERED ENTRY DETAIL ON 3A SHOWS
 THE TRUSSES SITTING ON THE CONCRETE
 BETWEEN THE 2X8 PLATES. ARE THE PLATES
 CONTINOUS WITH THE TRUSSES SITTING ON
 TOP OF THEM? PLEASE CLARIFY.
  
 7) PROVIDE A DETAIL OF THE INTERIOR WOOD
 FRAME BEARING WALLS. INDICATE ANCHORS,
 CONNECTORS, ETC.
  
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW
 (561)659-8096 EXT.8202

Review Stop Z ZONING
Rev No 1 Status P Date 2002-08-08 Cont ID  
Sent By sgraham Date 2002-08-08 Time 15:20 Rev Time 0.25
Received By sgraham Date   Time   Sent To  
Notes
***NONE***