2002-08-29 00:00:00 | BUILDING PLAN REVIEW |
| *******DENIED******* |
| |
| 1) STRUCTURE IS LOCATED IN AN "AO" FLOOD |
| ZONE AN ELEVATION CERTIFICATE WILL BE |
| REQUIRED. |
| |
| 2) THE SURVEY SHOWS THE A/C PAD AND |
| CONDENSING UNIT LOCATED IN A DRAINAGE |
| EASEMENT. AN EASEMENT RELEASE IS |
| REQUIRED OR A REVISED SURVEY SHOWING |
| RELOCATED EQUIPMENT. |
| |
| 3) PROVIDE DETAIL INDICATING HOW A/C |
| EQUIPMENT IS TO SUSPENDED FROM TRUSSES. |
| THIS INFORMATION IS ALSO TO BE PROVIDED |
| TO THE TRUSS ENGINEER. |
| |
| 4)PROVIDE (2) CURRENT AND COMPLETE |
| COPIES OF SBCCI OR METRO-DADE PRODUCT |
| APPROVALS FOR: |
| - ARCHED TOP FIXED GLASS WINDOW SHOWN ON |
| PLANS AT BEDROOM #3. |
| - STORM PANELS (PRODUCT APPROVAL WAS NOT |
| WITH KEY PLAN AND INSTALLATION SCHEDULE) |
| |
| 5) NO UPLIFT VALUES OR ANCHORS ARE |
| SPECIFIED ON THE ROOF FRAMING PLAN ON |
| 3A. THE ANCHORAGE SCHEDULE ON 3A NOTES |
| THAT CONNECTOR B OR F BE USED UNLESS |
| OTHERWISE NOTED ON FRAMING PLAN. PLEASE |
| CLARIFY IF THESE CONNECTORS WILL BE |
| ADEQUATE TO RESIST ALL LOADS. |
| |
| 6) THE LINTEL OVER THE SLIDING GLASS |
| DOOR AT THE LIVING ROOM IS NOT SHOWN ON |
| THE ROOFING PLAN ON 3A. PLEASE PROVIDE |
| A PRECAST LINTEL SCHEDULE FOR THE TWO |
| LINTELS ON PLANS. |
| |
| 7) THE COVERED ENTRY DETAIL ON 3A SHOWS |
| THE TRUSSES SITTING ON THE CONCRETE TIE |
| BEAM BETWEEN THE 2X8 PLATES. ARE THE |
| PLATES CONTINOUS WITH THE TRUSSES |
| SITTING ON TOP OF THEM. PLEASE CLARIFY. |
| |
| 8) PROVIDE A DETAIL OF THE INTERIOR WOOD |
| FRAME BEARING WALLS. INDICATE ANCHORS, |
| CONNECTORS,ETC. |
| |
| ROBERT MCDOUGAL |
| BLDG. PLAN REVIEW |
| (561)659-8096 EXT.8202 |