Plan Review Details - Permit 02050254
Plan Review Stops For Permit 02050254
Review Stop E ELECTRICAL
Rev No 2 Status P Date 2002-12-04 Cont ID  
Sent By btrobaug Date 2002-12-04 Time 10:35 Rev Time 0.50
Received By btrobaug Date 2002-12-04 Time 10:35 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2002-05-28 Cont ID  
Sent By btrobaug Date 2002-05-28 Time 11:00 Rev Time 0.00
Received By btrobaug Date 2002-05-28 Time 09:02 Sent To R
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2002-07-20 Cont ID  
Sent By hmoser Date 2002-07-20 Time 09:52 Rev Time 0.50
Received By hmoser Date 2002-07-20 Time 09:52 Sent To  
Notes
2002-07-20 00:00:00PASS/PRIVISO
 1) NEED FRESH AIR CALCULATIONS FOR ROUGH
 2) REFER TO SECTION 601.4 BALANCE
 RETURN AIR
 PLAN REVIEW BY HAROLD MOSER

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2002-05-23 Cont ID  
Sent By hmoser Date 2002-05-23 Time 17:18 Rev Time 0.25
Received By hmoser Date 2002-05-23 Time 17:17 Sent To  
Notes
2002-05-23 00:00:00PLAN DENIED
 NO MANUAL J
 PLAN REVIEW BY HAROLD MOSER
 [561]659-8096 EXT.8390

Review Stop P PLUMBING
Rev No 2 Status P Date 2002-07-24 Cont ID  
Sent By pschmitz Date 2002-07-24 Time 13:42 Rev Time 1.00
Received By pschmitz Date   Time   Sent To  
Notes
2002-07-24 00:00:00RE-SUB APPR KS.

Review Stop P PLUMBING
Rev No 1 Status F Date 2002-05-23 Cont ID  
Sent By kstevens Date 2002-05-23 Time 17:29 Rev Time 0.00
Received By kstevens Date 2002-05-23 Time 17:29 Sent To  
Notes
2002-05-23 00:00:00DENIED
 REFERENCE: FBC-2001 PLUMBING
  
 1) SANITARY RISER DIAGRAM REQUIRED FOR
 PLAN REVIEW.
  
 REVIEW BY KEN STEVENS
 (561) 659-8096 EXT 8377

Review Stop R ROOF PLAN REVIEW
Rev No 3 Status P Date 2002-08-02 Cont ID  
Sent By jgomez Date 2002-08-02 Time 13:42 Rev Time 0.00
Received By jgomez Date 2002-08-02 Time 13:42 Sent To  
Notes
2002-08-02 00:00:00APPROVED WITH PROVISO:
 1-FLOOD ZONE AO. NEED TO PROVIDE THE
 ELEVATION CERTIFICATE.
 2-PROVIDE COMPLETE AND REVISED INFO. FOR
 STORM SHUTTERS UNDER A SEPARATE PERMIT
 3-PROVIDE SOIL TEST REPORT SIGNED AND
 SEALED BY THE ENG'R. CH. 471 FL. ST.
 4-PRODUCT APPROVALS:
 A)WINDOW MULLIONS:
 *NEED PRODUCT APPROVAL FORM SIGNED AND
 SEALED BY ENGINEER AND ARCHITECT AS
 DONE WITH THE OTHER PRODUCT APPROVALS
 SUBMITTED.
 *CLEARLY INDICATE ALL COMPONENTS THAT
 APPLY TO THIS PROJECT.
 *MULLION NEED TO TRANSFER THE LOAD
 DIRECTLY TO THE ROUGH OPENING
 SUBSTRATE TO COMPLY WITH SECTION
 1707.4.5.2 FBC 2001. REVISE DWG.
 B)SINGLE HUNG WINDOWS DON'T MEET THE
 DESIGN PRESSURES CALCULATED BY THE
 ARCHITECT. NEED ANOTHER PROD. APPROVAL
 5-REVISE SURVEY. NEED LOT 8 W/ BAY WIND.
  
 NOTES:
 -DWGS AND COMMENTS TO BE FILED UNDER
 PERMIT #02050254.
 -THESE COMMENTS ALSO APPLY TO PERMIT
 #02050256.

Review Stop R ROOF PLAN REVIEW
Rev No 2 Status F Date 2002-07-17 Cont ID  
Sent By jgomez Date 2002-07-17 Time 18:42 Rev Time 0.00
Received By jgomez Date 2002-07-17 Time 18:43 Sent To  
Notes
2002-07-17 00:00:00SECOND CHECKLIST:
 1-ARCHITECT DIDN'T ADDRESSED ITEM #3
 FROM PREVIOUS CHECKLIST DATED 6-13-02.
 NEW SHEET HAS AREAS CLOUDED BUT THERE
 WERE NOT CHANGES DONE. SEE COMMENTS
 ON SHEET #7 AND PLEASE RETURN MARKED
 SHEET TO EXPEDITE REVIEW PROCESS.
 2-FOUNDATION PLAN: ARCHITECT RESPONDED
 TO COMMENT REGARDING CONCRETE SLAB
 JOINTS BY CITING THE CODE SECTION.
 NEED SPECIFIC INFORMATION. CITING THE
 CODE IS NOT ALLOWED. SECTION 104.2.1
 CITY AMENDMENTS TO FBC 2001.
 **NOTE: IF ARCHITECT WANTS TO USE THE
 EXCEPTION FOR NOT DESIGNING CONTROL
 JOINTS, THEN SPECIFY THE SUPPORTS FOR
 THE WWM. SEE SECTION 1909.3 FBC 2001.
 3-PROVIDE PRODUCT APPROVALS FOR DOORS &
 WINDOWS ASSEMBLIES AS SHOWN ON PLANS.
 **NOTE: CONTRACTOR (NEIL) SAID HE IS
 GETTING TOGETHER THE SITE SPECIFIC
 PRODUCT APPROVALS.
 4-STORM SHUTTERS:
 A)REVISE KEY PLAN AND ANCHOR SCHEDULE
 TO MATCH PLANS (SEE COMMENTS ONSTORM
 SHUTTERS PACKAGE SUBMITTED).
 B)CLEARLY INDICATE ON SHUTTER'S DWGS
 SPECIFIC MOUNTING CONDITIONS & ANCHORS
 TO BE USED.
 **IF INFORMATION IS NOT COMPLETE AT TIME
 OF RESUBMITTAL, THEN A SEPARATE PERMIT
 MAY BE APPLIED FOR BY SUBCONTRACTOR.
  
  
 NOTES:
 *THESE COMMENTS APPLY TO LOTS 7 AND 8.
 *DRAWINGS & COMMENTS TO BE FILED UNDER
 PERMIT #02050254.

Review Stop R ROOF PLAN REVIEW
Rev No 1 Status F Date 2002-06-13 Cont ID  
Sent By btrobaug Date 2002-05-28 Time 11:00 Rev Time 5.00
Received By jgomez Date 2002-06-13 Time 18:00 Sent To  
Notes
2002-06-13 00:00:00CHECKLIST:
 1-PAY IMPACT FEES.
 2-APPLY FOR IRRIGATION UNDER A SEPARATE
 PERMIT.
 3-A)CLARIFY DETAIL @ LEDGER THAT SUPPORT
 ROOF TRUSSES. CONNECTORS SPECIFIED TO
 HOLD TRUSS GIRDERS & ALL OTHER TRUSSES
 ARE TENSION CONNECTORS. DON'T YOU NEED
 TO USE TRUSS HANGERS TO SUPPORT THE
 TRUSSES RESTING ON THE 2X LEDGER?
 B)SEE DRAWING #7 FOR ADDITIONAL COMMENTS
 COMMENTS.
 C)REVISE ANCHOR SCHEDULE. UPLIFT LOADS
 GIVEN DON'T MATCH UPLIFT LOADS SHOWN
 ON SIMPSON CATALOGUE ACCORDING TO # OF
 NAILS USED. PROVIDE ENGINEERING CALCS.
 D)PROVIDE ENGINEERING CALCULATIONS FOR
 THE 4 CONNECTORS SPECIFIED ON DET. D/7
 TAKE INTO CONSIDERATION THE CLOSENESS
 OF ONE ANOTHER FOR THE EFFECTIVE
 STRUCTURAL AREA OF EACH CONNECTOR.
 4-UPDATE ALL DRAWINGS TO FBC 2001. SEE
 COMMENTS ON DRAWINGS & RETURN REVIEWED
 SETS AFTER CORRECTIONS ARE DONE TO THE
 ORIGINAL DRAWINGS TO EXPEDITE REVIEW.
 5-PROVIDE PRODUCT APPROVAL FOR:
 A)ENTRY DOORS WITH TRANSOM ABOVE SINGLE
 ASSEMBLY AS SHOWN ON PLANS.
 B)WINDOW MULLIONS, ARCHED WINDOWS,SINGLE
 HUNG WINDOWS AND SLIDING GLASS DOORS
 PACKAGES SUBMITTED ARE NOT ACCEPTABLE.
 THEY NEED TO BE OFFICIAL PRODUCT
 APPROVALS OR SITE SPECIFIC WITH ALL
 THE SPECIFIC CALCULATIONS, FASTENERS,
 TESTS, ETC. SEE COMMENTS ATTACHED TO
 THEM.
 **USE ATTACHED FORM AS A SAMPLE FOR SITE
 SPECIFIC ADDITIONAL INFORMATION REQ'D.
 **ALSO, ARCHITECT TO APPROVE ALL SITE
 SPECIFIC SUBMITTALS.
 6-UPDATE CERTIFICATION LETTER FOR TWO HR
 FIRE RATED CONCRETE BLOCK. REFER TO
 FBC 2001. PROVIDE ORIGINAL LETTER.
 7-STORM SHUTTERS:
 A)REVISE KEY PLAN AND ANCHOR SCHEDULE TO
 MATCH PLANS. SEE PLANS.
 B)CLEARLY INDICATE ON DWGS ANCHOR SCHED.
 CONNECTOR TYPE AND SPACING TO BE USED
 ACCORDING TO EDGE DISTANCE, STRUCTURE
 TO BE ATTACHED TO ETC.
  
 NOTES:
 *THESE COMMENTS APLY TO LOTS 7 & 8.
 *DRAWINGS AND COMMENTS TO BE FILED UNDER
 PERMIT #02050254.

Review Stop Z ZONING
Rev No 1 Status P Date 2002-05-14 Cont ID  
Sent By sgraham Date 2002-05-14 Time 14:46 Rev Time 0.25
Received By sgraham Date   Time   Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved