Plan Review Details - Permit 02040368
Plan Review Stops For Permit 02040368
Review Stop B BUILDING (STRUCTURAL)
Rev No 8 Status P Date 2004-06-21 Cont ID  
Sent By rmcdouga Date 2004-06-21 Time 08:04 Rev Time 1.00
Received By rmcdouga Date 2004-06-21 Time 08:04 Sent To  
Notes
2004-06-21 00:00:00REVISION TO CHANGE WINDOW MANUFACTURER
 IS OK. WINDOWS MUST COMPLY WITH FBC FOR
 EGRESS AND SAFETY GLAZING.

Review Stop B BUILDING (STRUCTURAL)
Rev No 7 Status P Date 2004-01-22 Cont ID  
Sent By mjacobs Date 2004-06-17 Time 08:52 Rev Time 2.00
Received By rmcdouga Date 2004-01-22 Time 15:49 Sent To  
Notes
2004-01-22 00:00:00BUILDING PROVISO
  
 1) SUBMIT CURRENT PRODUCT APPROVALS FOR
 DOORS.
  
 2) SEPARATE PERMITS REQUIRED FOR TRADES
 AND ROOFING.

Review Stop B BUILDING (STRUCTURAL)
Rev No 6 Status F Date 2003-12-15 Cont ID  
Sent By kstevens Date 2004-01-22 Time 09:06 Rev Time 3.00
Received By rmcdouga Date 2003-12-15 Time 15:44 Sent To  
Notes
2003-12-15 00:00:00DENIED
  
 1) THE WINDOW AND DOOR PRESSURES ON A2
 ARE INCORRECT. THE MAXIMUM PRESSURES
 FOR THE STRUCTURE ARE THE SAME FOR BOTH
 FLOORS AND ARE BASED ON A TWO STORY
 STRUCTURE. PLEASE CORRECT.
  
 2) THE NEGATIVE PRESSURE SPECIFIED ON
 THE PLANS OF -57 PSF EXCEEDS THE
 NEGATIVE DESIGN PRESSURES OF THE DOORS
 AND THE 35 SINGLE HUNG WINDOWS. SEE THE
 PRODUCT APPROVALS. PLEASE CORRECT.
 NOTE: REVIEW THE SPECIFIED WIND LOAD
 PRESSURES. THE FBC TABLE 1606.2B FOR A
 STRUCTURE WITH A MEAN ROOF HEIGHT OF 30'
 OR LESS WITH EXPOSURE B LISTS THE
 MAXIMUM PRESSURES AS +35.3 AND -47.2 PSF
  
 3) THE ID MARKS ON THE DOOR SCHEDULE DO
 NOT CORRESPOND TO THE ID MARKS ON THE
 PLANS.
  
 4) CHANGE THE WINDOW SIZES ON SHEETS A3
 AND P1 TO CORRESPOND WITH A2.
  
 5) THE PRODUCT APPROVALS FOR THE JELD-
 WEN DOOR, THE SHINGLES AND STORM PANELS
 HAVE EXPIRED. SUBMIT CURRENT PRODUCT
 APPROVALS.
  
 6) THE INSTALLATION SCHEDULE FOR THE
 STORM PANELS HAS ERRORS. PLEASE CORRECT.
 THE GLAZING IN THE DOORS ARE REQUIRED TO
 BE SHUTTERED. SPECIFY THE ANCHOR TYPE
 AND REQUIRED SPACING OF THE ANCHORS AS
 INDICATED ON THE PRODUCT APPROVAL.
  
 7) THE ORIGINAL WET SIGNATURE AND DATE
 AS WELL AS THE EMBOSSD SEAL OF THE
 ENGINEER ARE REQUIRED ON EACH PAGE OF
 PLANS AND ON ALL DRAWINGS FROM HIM.
  
 8) PLEASE REVIEW THE EAST & WEST
 ELEVATIONS FOR COMPLIANCE WITH FBC
 TABLE 600 REQUIREMENTS. THE AREA OF WALL
 ALLOWED AS OPENINGS IS 20% ON THE EAST
 SIDE AND 40% ON THE WEST SIDE. THE
 LARGER EGRESS WINDOWS MAY EXCEED THE
 ALLOWABLE AREA. SUBMIT YOUR CALCULATIONS
 FOR THESE TWO ELEVATIONS.
  
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW
 (561)805-6714

Review Stop B BUILDING (STRUCTURAL)
Rev No 5 Status F Date 2003-10-20 Cont ID  
Sent By jleech Date 2003-12-13 Time 10:31 Rev Time 2.00
Received By rmcdouga Date 2003-10-20 Time 07:44 Sent To  
Notes
2003-10-20 00:00:00BUILDING DENIED
  
 1) ENERGY CALCULATIONS ARE REQUIRED TO
 BE SIGNED AND DATED BY THE OWNER/AGENT.
 FBC CHAPTER 13.
  
 2) SPECIFY THE ROOF PITCH, MEAN ROOF
 HEIGHT, HEIGHT OF FLOORS AND CEILINGS
 ABOVE GRADE ON THE ELEVATIONS.
  
 3) THE PRODUCT APPROVALS SUBMITTED ARE
 FOR JELD-WEN "GLAZED" EXTERIOR STEEL
 DOORS.THE SCHEDULE ON THE PLANS SPECIFY
 STANLEY DOORS W/ ACCEPTANCE #00-0512.09.
 THE SCHEDULE SPECIFIES ALUMNIUM DOORS.
 PLEASE REVISE.
  
 4) THE 34 SH WINDOWS SPECIFIED ON THE
 PLANS DO NOT PROVIDE THE CLEAR OPENING
 SIZE REQUIRED FOR EMERGENCY ESCAPE AND
 RESCUE OPENINGS BY FBC 1005.4.4.
  
 5) THE PLANS SPECIFY BINNINGS PAN
 AMERICAN WINDOWS WITH ACCEPTANCE #
 01-0226.04. THE PRODUCT APPROVALS THAT
 WERE SUBMITTED ARE FOR TRACO WINDOWS.
  
 6) THE SIZES SPECIFIED IN THE SCHEDULE
 FOR THE 14SH, 1/2 33SH AND 1/2 34SH
 WINDOWS ARE INCORRECT. PLEASE CORRECT.
  
 7) SUBMIT A KEY PLAN AND INSTALLATION
 SCHEDULE FOR THE STORM PANELS. INDICATE
 THE CONNECTOR TYPE & SPACING AND TYPE OF
 MOUNT THAT WILL BE USED.
  
 8) THE WALL SECTIONS ON A-5 DO NOT
 SPECIFY A CONCRETE CAP WITH HORIZONTAL
 REINFORCEMENT OR VERTICAL REINFORCEMENT
 AND FILLED CELLS TYING THE STEM WALL TO
 THE FOOTER. A CONTINOUS LOAD PATH FROM
 THE ROOF TO THE FOOTING IS REQUIRED.
 SPECIFY ON THE PLAN HOW THE LOAD WILL BE
 TRANSFERED FROM THE TOP OF THE STEM WALL
 TO THE FOUNDATION.
  
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW
 (561)805-6714

Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status F Date 2003-08-14 Cont ID  
Sent By rmcdouga Date 2003-08-14 Time 14:37 Rev Time 2.00
Received By rmcdouga Date 2003-08-14 Time 14:37 Sent To  
Notes
2003-08-14 00:00:00DENIED
  
 1)SUBMIT ENERGY CALCULATIONS AS REQUIRED
 BY FBC CHAPTER 13.
  
 2) PROVIDE TWO COPIES OF A KEY PLAN AND
 INSTALLATION SCHEDULE FOR THE STORM
 PANELS. NOTE: THE PRODUCT APPROVALS THAT
 WERE SUBMITTED FOR THE STORM PANELS ARE
 EXPIRED. PLEASE SUBMIT CURRENT ONES.
  
 3) SUBMIT A SIGNED AND SEALED SURVEY
 INDICATING THE LOCATION OF THE STRUCTURE
 ON THE PROPERTY AND THE DISTANCE TO THE
 PROPERTY LINES. THIS IS REQUIRED TO
 DETERMINE THE PERCENT OF WALL AREA THAT
 IS ALLOWED AS OPENINGS. FBC TABLE 600
  
 4) PROVIDE EXTERIOR ELEVATIONS. INDICATE
 THE HEIGHT ABOVE GRADE TO FLOORS,
 CEILINGS, ETC. INDICATE THE MEAN ROOF
 HEIGHT AND PITCH.
  
 5)PROVIDE (2) CURRENT AND COMPLETE
 COPIES OF SBCCI OR METRO-DADE PRODUCT
 APPROVALS FOR:
 - THE EXTERIOR ALUMINUM DOORS
 PRODUCT APPROVALS THAT WERE SUBMITTED
 ARE FOR STEEL DOORS. IF YOU ARE USING
 STEEL EXTERIOR DOORS, PLEASE REVISE THE
 DOOR SCHEDULE ON THE PLANS.
  
 6) THE ITEMS THAT ARE REDLINED ON THE
 PLANS ARE REQUIRED TO BE INITALED AND
 DATED BY THE DESIGNER OF RECORD.
  
 7) THE DOOR/WINDOW PRESSURES LISTED ON
 A-2 CONFLICT WITH THOSE ON A-1. PLEASE
 CORRECT.
  
 8) THE WINDOW SCHEDULE ON A-2 DOES NOT
 INCLUDE THE 34 SH WINDOWS SPECIFIED ON
 THE FLOOR PLAN. THE WRONG SIZES ARE
 GIVEN FOR THE 14SH, 1/2 33SH AND
 1/2 34SH WINDOWS. PLEASE CORRECT.
  
 9) SPECIFY THE SPACING OF THE THE MTS 30
 CONNECTORS ON A-5.
  
 10) THE WALL SECTIONS ON A-5 DO NOT
 INDICATE A CAP BEAM ON TOP OF THE STEM
 WALL WITH DOWN BARS CONNECTING TO THE
 FOOTER. A CONTINOUS TIE FROM THE ROOF TO
 THE FOOTING IS REQUIRED TO TRANSFER THE
 LOADS TO THE GROUND. SPECIFY HOW THIS
 WILL BE ACHIEVED.
  
 11) SEVERAL OF THESE COMMENTS WERE NOTED
 IN PREVIOUS REVIEWS AND HAVE NOT BEEN
 ADDRESSED. SEE FL STATUTE 553.80 (2) (B)
  
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW
 (561)805-6714

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status F Date 2003-04-15 Cont ID  
Sent By pkrauss Date 2003-08-14 Time 10:24 Rev Time 4.00
Received By rmcdouga Date   Time   Sent To  
Notes
2003-04-14 00:00:00BUILDING DENIED
  
 1) FBC 1606.1.7 WIND LOADS. THE PLANS
 SHALL STATE THE BASIC WIND SPEED, WIND
 IMPORTANCE FACTOR, WIND EXPOSURE
 CATEGORY, INTERNAL PRESSURE COEFFICENT,
 AND EXTERIOR COMPONENT AND CLADDING
 DESIGN WIND PRESSURES. THIS INFORMATION
 IS REQUIRED TO BE ON THE PLANS.
  
 2) SHEETS A2 AND A4 CONTAIN REFERENCES
 TO THE WRONG CODE AND INCORRECT DESIGN
 CRITERIA. PLEASE CORRECT.
  
 3) PROVIDE ENERGY CALCULATIONS. SEE FBC
 CHAPTER 13.
  
 4) THE FASTENER SCHEDULE ON A4 REFERS TO
 SOUTH FLORIDA BUILDING CODE UNDER THE
 REMARKS COLUMN. PLEASE CORRECT TO FBC.
  
 5)CORRECT NOTE #11 UNDER TYPICAL SECTION
 NOTES ON A4 AND THE DRYWALL FASTENER
 SPACING SPECIFIED ON DETAIL 1 AND DETAIL
 5 ON A5 TO COMPLY WITH FBC TABLE 2306.1.
  
 6) SPECIFY ON THE PLANS THAT ADEQUATE
 SUBSTRATE WILL BE PROVIDED AT THE
 WINDOWS FOR ATTACHMENT OF THE STORM
 PANELS.
  
 7) PROVIDE (2) COPIES OF INSTALLATION
 SCHEDULE AND KEY PLAN FOR STORM PANELS.
 NOTE: THE PRODUCT APPROVALS THAT WERE
 SUBMITTED FOR STORM PANELS HAS EXPIRED.
 PLEASE SUBMIT CURRENT ONES.
  
 8) STUCCO ON METAL LATH OVER SOLID BASE
 IS REQUIRED BY FBC 2504.2.1 AND ASTM C
 926 TO BE 7/8" THICK. PLEASE REVISE ON
 WALL SECTIONS.
  
 9) INDICATE THE ATTIC ACCESS ON THE
 PLANS. SEE FBC 2309.6.
  
 10) FBC 1005.4 REQUIRES SLEEPING ROOMS
 TO HAVE AN EMERGENCY ESCAPE AND RESCUE
 OPENING. SEE CLEAR OPENING SIZE AND AREA
 REQUIREMENTS. THE 1/2- 34SH WINDOWS
 SHOWN ON THE PLANS DO NOT COMPLY.
  
 11) PROVIDE DETAILS OF THE INTERIOR AND
 EXTERIOR STAIRS. SPECIFY THE RISER
 HEIGHTS AND TREAD DEPTHS. INDICATE THE
 FOUNDATION THAT SUPPORTS THE EXTERIOR
 STAIRS.
  
 12) PROVIDE A SIGNED AND SEALED SURVEY
 INDICATING THE LOCATION OF THE STRUCTURE
 ON THE PROPERTY AND THE DISTANCE TO THE
 PROPERTY LINES. THIS IS REQUIRED TO
 DETERMINE THE PERCENT OF WALL AREA THAT
 IS ALLOWED AS OPENINGS.
  
 13)PROVIDE EXTERIOR ELEVATIONS. INDICATE
 THE HEIGHT ABOVE GRADE TO FLOORS,
 CEILINGS, ETC. INDICATE THE MEAN ROOF
 HEIGHT AND ROOF PITCH.
  
 14) SPECIFY THE POSITIVE AND NEGATIVE
 DESIGN WINDLOAD PRESSURES ON THE PLANS
 FOR ALL EXTERIOR OPENINGS.
  
 15) PROVIDE (2) CURRENT AND COMPLETE
 COPIES OF SBCCI OR METRO-DADE PRODUCT
 APPROVALS FOR:
 - EXTERIOR WOOD DOOR
 - EXTERIOR ALUMINUM DOOR
 THESE ARE THE EXTERIOR DOORS THAT ARE
 SPECIFIED ON THE PLANS IN THE DOOR
 SCHEDULE ON ON A2. IF YOU ARE NOT USING
 THESE DOORS, CHANGE THE SCHEDULE TO
 INDICATE THE DOORS THAT WILL BE USED.
  
 16) THE DOOR SCHEDULE INDICATES THAT TWO
 EXTERIOR DOORS ARE HOLLOW CORE WOOD.
 THIS IS NOT ALLOWED BY FBC CHAPTER 13.
 (ENERGY EFFICIENCY)
  
 17) THE COMMENTS NOTED IN PREVIOUS
 REVIEWS HAVE NOT BEEN ADDRESSED. FL
 STATUTE 553.80 (2) (B) REQUIRES A FEE OF
 FOUR TIMES THE PLAN REVIEW PORTION OF
 THE PERMIT FEE TO BE IMPOSED FOR EACH
 TIME AFTER THE THIRD REVIEW IN WHICH THE
 SAME ITEM HAS NOT BEEN CORRECTED.
  
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW
 (561)659-8096 EXT.8202

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2003-02-20 Cont ID  
Sent By shernand Date 2003-04-02 Time 15:36 Rev Time 4.00
Received By rmcdouga Date 2003-02-20 Time 16:28 Sent To P
Notes
2003-02-20 00:00:00BUILDING DENIED
 THIS IS THE FOURTH STRUCTURAL REVIEW.
  
 1) THE ENTIRE STRUCTURE SHALL BE MADE TO
 CONFORM THE REQUIREMENTS FOR A NEW
 STRUCTURE PER FBC 3401.7.2.6 AND THE
 CONSTRUCTION BOARD OF ADJUSTMENT AND
 APPEALS.
  
 2) A SUCCESSOR PROFESSIONAL ENGINEER
 MUST USE HIS OWN TITLE BLOCK, SEAL AND
 SIGNATURE AND MUST REMOVE THE TITLE
 BLOCK, SEAL AND SIGNATURE OF THE
 ORIGINAL PROFESSIONAL ENGINEER BEFORE
 REUSING ANY SEALED CONTRACT DOCUMENTS.
 SEE FAC 61G15-27 FOR REQUIREMENTS.
  
 3) FBC 1606.1.7WIND LOAD.THE PLANS
 SHALL STATE THE BASIC WIND SPEED, WIND
 IMPORTANCE FACTOR, WIND EXPOSURE
 CATEGORY, INTERNAL PRESSURE COEFFICIENT,
 AND EXTERIOR COMPONENT AND CLADDING
 DESIGN WIND PRESSURES.
  
 4) SHEETS A2 AND A4 REFERENCE THE WRONG
 CODE AND DESIGN CRITERIA. PLEASE
 CORRECT.
  
 5) PROVIDE ENERGY CALCULATIONS. SEE FBC
 CHAPTER 13.
  
 6) THE FASTENER SCHEDULE ON A4 CONTAINS
 INCORRECT INFORMATION. REFER TO FBC
 TABLE 2306.1 AND CORRECT.
  
 7) PLEASE CORRECT NOTE 11 ON A4 AND DRY-
 WALL FASTENER SPACING NOTE ON A5 TO
 COMPLY WITH FBC TABLE 2306.1.
  
 8) SPECIFY ON THE PLANS ADEQUATE
 SUBSTRATE AT WINDOWS FOR THE ATTACHMENT
 OF STORM PANELS.
  
 9) PROVIDE KEY PLANS AND INSTALLATION
 SCHEDULE FOR THE STORM PANELS.
  
 10) STUCCO ON METAL LATH IS REQUIRED TO
 BE 7/8" THICK PER FBC 2504.2.1 AND ASTM
 C 926. PLEASE REVISE ON WALL SECTIONS.
  
 11) INDICATE THE ATTIC ACCESS ON THE
 PLANS. SEE FBC 2309.6
  
 12) FBC 1005.4 REQUIRES SLEEPING ROOMS
 TO HAVE AN EMERGENCY ESCAPE AND RESCUE
 OPENING. SEE CLEAR OPENING SIZE AND AREA
 REQUIREMENTS.
  
 13) PROVIDE DETAILS OF INTERIOR AND
 EXTERIOR STAIRS. SPECIFY THE RISER
 HEIGHT AND TREAD DEPTH. INDICATE THE
 FOUNDATION THAT SUPPORTS EXTERIOR STAIRS
  
 14) PROVIDE A SIGNED AND SEALED SURVEY
 INDICATING THE LOCATION OF THE STRUCTURE
 ON THE PROPERTY AND THE DISTANCE TO THE
 PROPERTY LINES, IN ORDER TO DETERMINE
 COMPLIANCE WITH FBC TABLE 600.
  
 15) PROVIDE EXTERIOR ELEVATIONS.
 INDICATE HEIGHTS ABOVE GRADE TO FLOORS,
 CEILINGS, ETC. INDICATE MEAN ROOF HEIGHT
 AND ROOF PITCH.
  
 16) SPECIFY THE POSITIVE AND NEGATIVE
 DESIGN WINDLOAD PRESSURES ON THE PLANS
 FOR ALL EXTERIOR OPENINGS.
  
 17) PROVIDE (2) CURRENT AND COMPLETE
 COPIES OF SBCCI OR METRO-DADE PRODUCT
 APPROVALS FOR:
 - EXTERIOR WOOD DOOR
 - EXTERIOR ALUMNIUM DOOR
 THESE DOORS ARE SPECIFIED IN THE DOOR
 SCHEDULE ON A2.
  
 18) THE DOOR SCHEDULE INDICATES THAT
 TWO EXTERIOR DOORS ARE HOLLOW CORE WOOD.
 THIS IS NOT ALLOWED BY FBC CHAPTER 13.
 (FL ENERGY CODE)
  
 19) THE STRUCTURE IS REQUIRED TO BE
 RETURNED TO A SINGLE FAMILY DWELLING BY
 THE ZONING DEPARTMENT. PLEASE REVISE THE
 DRAWINGS TO REFLECT THIS. REMOVE THE
 SECOND FLOOR KITCHEN AND CHANGE TITLE
 BLOCK.
  
 MOST OF THESE COMMENTS WERE MADE IN THE
 THREE PREVIOUS REVIEWS AND HAVE NOT BEEN
 ADDRESSED. THE SAME PLANS HAVE BEEN
 SUBMITTED WITH NO REVISIONS BEING MADE.
 FLORIDA STATUTE 553.80(2)(B) REQUIRES A
 FEE OF FOUR TIMES THE PLAN REVIEW
 PORTION OF THE PERMIT FEE TO BE IMPOSED.
 SEE ATTACHMENT.
 IF YOU HAVE ANY QUESTIONS CALL:
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW
 (561)659-8096 EXT.8202

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2002-12-09 Cont ID  
Sent By sgraham Date 2003-02-19 Time 08:17 Rev Time 5.00
Received By rmcdouga Date   Time   Sent To  
Notes
2002-05-13 00:00:00BUILDING DENIED
  
 1) IMPACT FEES MUST BE PAID TO PALM
 BEACH COUNTY, PLANS STAMPED BY THEM AND
 COPY OF RECEIPT SUBMITTED TO CITY OF
 WEST PALM BEACH BUILDING DEPARTMENT,
 BEFORE A BUILDING PERMIT CAN BE ISSUED.
 DUE TO THE CHANGE FROM A SINGLE FAMILY
 DWELLING TO A DUPLEX ADDITION IMPACT
 FEES MAY BE DUE TO PALM BEACH COUNTY.
  
 2) PROVIDE ENERGY CALCULATIONS AND
 EQUIPMENT SIZING CALCULATIONS (MANUAL J)
 AS REQUIRED BY CHAPTER 13 OF THE FLORIDA
 BUILDING CODE, THE FLORIDA ENERGY
 EFFICIENCY CODE FOR BUILDING
 CONSTRUCTION.
  
 3) INDICATE DESIGN INFORMATION ON PLANS.
 2001 FLORIDA BUILDING CODE AND ASCE7-98
 NOT SFBC OR ASCE7-93. SHEETS A2 AND A4
 REFERENCE THE WRONG CODE AND DESIGN
 CRITERIA.
  
 4) FASTENING SCHEDULE ON A4 CONTAINS
 INCORRECT INFORMATION. PLEASE REFER TO
 TABLE 2306.1 IN THE 2001 FBC AND MAKE
 CORRECTIONS.
  
 5) PLEASE CORRECT NOTE 11 ON A4 AND
 DRYWALL FASTENER SPACING NOTE ON A5 TO
 COMPLY WITH 2001FBC TABLE 2306.1 OR AS
 SPECIFIED BY MANUFACTURER.
  
 6) INDICATE ON THE PLANS THAT ADEQUATE
 SUBSTRATE IS TO BE PROVIDED FOR THE
 ATTACHMENT OF STORM PANELS.
  
 7) PROVIDE (2) COPIES OF AN INSTALLATION
 SCHEDULE AND KEY PLAN FOR HURRICANE
 PANELS.
  
 8) STUCCO ON LATHE AS INDICATED ON WALL
 SECTIONS ON A5 IS REQUIRED TO BE 7/8"
 THICK PER FBC 2504.2.1 AND ASTM C 926.
  
 9) A CONTINOUS LOAD PATH FROM THE ROOF
 TO THE FOUNDATION IS REQUIRED TO
 TRANSFER LOADS. NO CONNECTORS ARE SHOWN
 ON A5 BETWEEN THE FLOOR SILL AND STUDS
 OR BETWEEN 1ST AND 2ND FLOORS. PLEASE
 CORRECT.
  
 10) FIREBLOCKING IS REQUIRED BETWEEN THE
 FLOOR AND WALL ASSEMBLIES AT THE 1ST AND
 2ND FLOORS PER FBC 2305.1. PLEASE
 INDICATE ON PLANS.
  
 11) INDICATE ATTIC ACCESS ON PLANS.
 FBC 2309.6
  
 12) EMERGENCY ESCAPE AND RESCUE OPENINGS
 ARE REQUIRED AT SLEEPING ROOMS PER FBC
 1005.4. THE 1/2- 34SH WINDOWS INDICATED
 DO NOT PROVIDE THE REQUIRED NET CLEAR
 OPENING. PLEASE CORRECT.
  
 13) A ONE HOUR TENANT SEPARATION IS
 REQUIRED BETWEEN UNITS PER FBC 704.2.2.3
 AND 704.3.1.
  
 14) INDICATE HOW THE REQUIRED MEANS OF
 EGRESS FROM THE SECOND FLOOR UNIT WILL
 BE PROVIDED. EXIT STAIRWAYS SHALL COMPLY
 WITH FBC 1006. PROVIDE STAIR DETAILS.
  
 15) PROVIDE COPIES OF SURVEY INDICATING
 DISTANCES TO PROPERTY LINES IN ORDER TO
 DETERMINE COMPLIANCE WITH TABLE 600 FOR
 PERCENT OF WALL OPENINGS ALLOWED.
  
 16) PROVIDE ELEVATIONS. INDICATE FLOOR,
 CEILING,ETC. HEIGHTS. INDICATE MEAN ROOF
 HEIGHT AND ROOF PITCH.
  
 17) INDICATE THE POSITIVE AND NEGATIVE
 PRESSURES FOR ALL EXTERIOR DOOR AND
 WINDOW OPENINGS ON THE PLANS.
  
 18) PROVIDE (2) CURRENT AND COMPLETE
 COPIES OF SBCCI OR METRO-DADE PRODUCT
 APPROVALS FOR:
 - EXTERIOR WOOD DOOR
 - EXTERIOR ALUMINUM DOOR
 THE PRODUCT APPROVAL THAT WAS SUBMITTED
 WAS FOR EXTERIOR STEEL DOOR, WHICH IS
 NOT LISTED IN THE DOOR SCHEDULE ON A2.
  
 19) THE DOOR SCHEDULE INDICATES THE
 EXTERIOR WOOD DOOR WITH A HOLLOW CORE.
 THIS IS NOT ALLOWED BY THE FLORIDA
 ENERGY CODE (FBC CHAPTER 13).
  
 IF YOU HAVE ANY QUESTIONS PLEASE CALL:
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW
 (561)659-8096 EXT.8202

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2002-12-03 Cont ID  
Sent By kstevens Date 2003-10-14 Time 07:44 Rev Time 0.00
Received By btrobaug Date 2002-12-03 Time 13:45 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2002-04-08 Cont ID  
Sent By btrobaug Date 2002-12-03 Time 13:45 Rev Time 0.00
Received By btrobaug Date 2002-04-08 Time 13:00 Sent To Z
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 8 Status N Date 2004-06-17 Cont ID  
Sent By mjacobs Date 2004-06-17 Time 08:52 Rev Time 0.00
Received By mjacobs Date 2004-06-17 Time 08:51 Sent To B
Notes
2004-06-17 00:00:00SENT TO RM DESK/REVISION /PRODUCT APPROV

Review Stop I INCOMING/PROCESSING
Rev No 7 Status N Date 2004-01-13 Cont ID  
Sent By csiegber Date 2004-01-13 Time 15:18 Rev Time 0.00
Received By csiegber Date 2004-01-13 Time 15:18 Sent To P
Notes
2004-01-13 00:00:00TO KS BOX/RESUB

Review Stop I INCOMING/PROCESSING
Rev No 6 Status N Date 2003-11-26 Cont ID  
Sent By csiegber Date 2003-11-26 Time 16:00 Rev Time 0.00
Received By csiegber Date 2003-11-26 Time 16:00 Sent To P
Notes
2003-11-26 00:00:00TO KS BOX/RESUB

Review Stop I INCOMING/PROCESSING
Rev No 5 Status N Date 2003-10-06 Cont ID  
Sent By csiegber Date 2003-10-06 Time 10:17 Rev Time 0.00
Received By csiegber Date 2003-10-06 Time 10:17 Sent To E
Notes
2003-10-06 00:00:00TO PK DESK

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2003-08-13 Cont ID  
Sent By alange Date 2003-08-13 Time 09:18 Rev Time 0.00
Received By alange Date 2003-08-13 Time 09:18 Sent To E
Notes
2003-08-13 00:00:00 
 TO BT DESK

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2003-04-02 Cont ID  
Sent By shernand Date 2003-04-02 Time 15:36 Rev Time 0.00
Received By shernand Date 2003-04-02 Time 15:31 Sent To B
Notes
2003-04-02 00:00:00RM DESK

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2003-02-04 Cont ID  
Sent By dpalmer Date 2003-02-04 Time 13:36 Rev Time 0.00
Received By dpalmer Date 2003-02-04 Time 13:36 Sent To  
Notes
2003-02-04 00:00:00PLANS SENT OUT FRONT UNDER"K" SEE NOTES
 ON FRONT SRCEEN.

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2002-12-03 Cont ID  
Sent By btrobaug Date 2002-12-03 Time 13:44 Rev Time 0.00
Received By btrobaug Date 2002-12-03 Time 13:44 Sent To E
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 4 Status N Date 2003-10-09 Cont ID  
Sent By pkrauss Date 2003-10-09 Time 13:17 Rev Time 0.00
Received By pkrauss Date 2003-10-09 Time 13:02 Sent To  
Notes
2003-10-09 00:00:00NO MECHANICAL PLANS SUBMITTED FOR REVIEW
 ENERGY CALCS INDICATE DUCTLESS PTAC
 UNITS.

Review Stop M MECHANICAL (A/C)
Rev No 3 Status F Date 2003-08-14 Cont ID  
Sent By pkrauss Date 2003-08-14 Time 10:24 Rev Time 0.30
Received By pkrauss Date 2003-08-14 Time 10:24 Sent To P
Notes
2003-08-14 00:00:00DENIED:
 COMMENTS NOT ADDRESSED FROM PREVIOUS
 REVIEW:
  
 NO MECHANICAL PLANS SUBMITTED FOR REVIEW
 PROVIDE ENERGY AND MANUAL J CALCULATIONS
 AS PER 2001 FBC CHAPTER 13 SUB-CHAPTER
 600
  
 PROVIDED INFORMATION ON THE HVAC.
 INDICATE IF SYSTEM IS NEW, EXISTING OR
 IF DUCTWORK IS BEING REPLACED.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE
 CONTACT PATTY KRAUSS AT (561) 805-6719.

Review Stop M MECHANICAL (A/C)
Rev No 2 Status F Date 2003-04-09 Cont ID  
Sent By pkrauss Date 2003-04-09 Time 14:08 Rev Time 0.35
Received By pkrauss Date 2003-04-09 Time 14:08 Sent To E
Notes
2003-04-09 00:00:00DENIED:
  
 1.PROVIDE ENERGY & MANUAL J CALCS.
  
 2.PLANS INDICATE FIRE DAMAGE, PLEASE
 INDICATE WHAT IF ANY MECHANICAL WORK IS
 INVOLVED.NEW OR EXISTING SYSTEM?
  
 IF YOU HAVE ANY QUESTIONS, PLEASE
 CONTACT PATTY KRAUSS AT (561) 805-6719

Review Stop M MECHANICAL (A/C)
Rev No 1 Status N Date 2002-04-30 Cont ID  
Sent By kstevens Date 2003-04-04 Time 08:13 Rev Time 0.50
Received By hmoser Date 2002-04-30 Time 16:50 Sent To  
Notes
2002-04-30 00:00:00NO PLANS,NO ENERGY CALCS NO MANUAL J.
 MECHANICAL CONTRACTOR MUST BRING IN
 INFORMATION WITH PERMIT APPLICATION
 PLAN REVIEW BY HAROLD MOSER 4/30/02

Review Stop P PLUMBING
Rev No 9 Status P Date 2004-01-22 Cont ID  
Sent By kstevens Date 2004-01-22 Time 09:03 Rev Time 0.33
Received By kstevens Date 2004-01-22 Time 09:03 Sent To B
Notes
***NONE***

Review Stop P PLUMBING
Rev No 8 Status F Date 2003-12-13 Cont ID  
Sent By csiegber Date 2004-01-13 Time 15:18 Rev Time 1.25
Received By jleech Date 2003-12-13 Time 10:30 Sent To B
Notes
2003-12-13 00:00:00DENIED;
 1.PLANS ARE NOT SIGNED SEE FL. ADMINIS-
 TRATIVE CODE SEC. 61G15-23.002 ( COPY
 ENCLOSED ).
 2.PLANS SHOW WASHER DRYER ON FIRST AND
 SECOND FLOOR.RISER DIAGRAM SHOWS W/M ON
 FIRST FLOOR. PLEASE CORRECT.
 3.RISER DIAGRAM;
 A.FIRST FLOOR BATHROOM CANNOT DIS-
 CHARGE INTO THE SECOND FLOOR
 BATHROOM SANITARY RISER.
 B.WASHING MACHINE VENT MUST RE-VENT
 6" ABOVE THE HIGHEST FIXTURE ON
 THE SECOND FLOOR.
 C.TOTAL FIXTURE UNITS IS 14 NOT 18.
 PLUMBING PLAN REVIEW BY;
 JOHN LEECH
 805-6695

Review Stop P PLUMBING
Rev No 7 Status F Date 2003-10-14 Cont ID  
Sent By csiegber Date 2003-11-26 Time 16:00 Rev Time 0.75
Received By kstevens Date 2003-10-14 Time 07:29 Sent To E
Notes
2003-10-14 00:00:00DENIED
 REFERENCE: FBC-2001 PLUMBING
 FBC-2001 CHAPTER 1
 FLORIDA STATUTES
  
 1) COMMENTS FROM LAST REVIEW HAVE NOT
 BEEN ADDRESSED. PLEASE SEE ATTACHED
 COMMENTS FROM 8-14-3.
 2) SEE ATTACHED SHEET CONCERNING FLORIDA
 STATUTE 553.80(2)(B) DESIGN PROFESSIONAL
 IF THE COMMENTS ARE NOT ADDRESSED THEN
 4 TIMES THE FEE ($1,800) SHALL BE IM-
 POSED.
  
 REVIEW BY KEN STEVENS
 (561) 805-6721
 FAX (561) 653-2692
 E-MAIL [email protected]

Review Stop P PLUMBING
Rev No 6 Status F Date 2003-08-14 Cont ID  
Sent By kstevens Date 2003-08-14 Time 12:46 Rev Time 1.00
Received By kstevens Date 2003-08-14 Time 12:46 Sent To  
Notes
2003-08-14 00:00:00DENIED
 REFERENCE: FBC-2001 PLUMBING
  
 1) SANITARY RISER DIAGRAM DOES NOT MEET
 CODE REQUIREMENTS.
 A) 909.1 ONLY THE FIXTURES WITHIN THE
 BATHROOM GROUPS SHALL CONNECT TO THE WET
 VENTED HORIZONTAL BRANCH DRAIN. ANY
 ADDITIONAL FIXTURES SHALL DISCHARGE
 DOWNSTREAM OF THE WET VENT. WASHMACHINES
 B) BATHTUB P-TRAPS CANNOT BE TAKEN OFF
 ABOVE THE WASHMACHINE AND THE WATER
 CLOSET AND THE CLEANOUT.????? WATER
 CLOSET AND TUB SHOULD BE CONNECTED ON
 THE HORIZONTAL BELOW THE FLOOR WITH THE
 CLEANOUT AND LAV ABOVE THE FLOOR
 C) SANITARY RISER DIAGRAM SHOWS A KIT.
 SINK ON THE SECOND FLOOR, BUT THE FLOOR
 PLAN DOES NOT SHOW A KITCHEN SINK.
 3) SEE ATTACHED SHEET FOR EXAMPLE OF
 APPROVED BATHROOM/WASH MACHINE RISER
 DIAGRAM. - SUBMIT A RISER DIAGRAM THAT
 MEETS CODE AND REFLECTS FLOOR PLAN.
  
 REVIEW BY KEN STEVENS
 (561) 805-6721
 FAX (561) 653-2692
 E-MAIL [email protected]

Review Stop P PLUMBING
Rev No 5 Status F Date 2003-04-04 Cont ID  
Sent By pkrauss Date 2003-08-14 Time 10:32 Rev Time 0.75
Received By kstevens Date 2003-04-04 Time 08:02 Sent To M
Notes
2003-04-04 00:00:00DENIED
 REFERENCE: FBC-2001 PLUMBING
  
 PLAN REVIEW COMMENTS FROM 5-8-2, 10-5-2
 12/5/2 & 2-28-3 HAVE NOT BEEN ADDRESSED.
  
 1) SHT A2, 1 AAUTOMATIC CLOTHES WASHER
 CONNECTION REQUIRED FOR EACH UNIT OR A
 CENTRAL FACILITY WITH 1 CONNECTION PER
 20 UNITS REQUIRED PER TABLE 403.1.
 2) SHT P1 PLUMBING NOTES #'2 2, 5, 6, 7,
 8, 9, 10, & 11. CURRENT CODE IS FBC-2001
 PLUMBING, NOT SFBC AS STATED IN NOTES.
 PLEASE CHANGE NOTES TO REFLECT PRESENT
 PLUMBING CODE.
 3) SHT P2 1ST & 2ND FLOOR WATER RISER
 DIAGRAMS, AIR CHAMBERS ARE NOT APPROVED.
 WATER HAMMER ARRESTORS SHALL BE PROVIDED
 PER SECTION 604.9 AND LOCATED PER PDI-WH
 201 AND MANUF. INSTALLATION INSTRUCTIONS
 4) SHT P2 SANITARY RISER DIAGRAM, 2ND
 FLOOR BATHROOM GROUP SHALL NOT DRAIN IN-
 TO VENT OF 1ST FLOOR BATHROOM GROUP. 2ND
 FLOOR STACK SHALL BE TAKEN OFF BLDG
 DRAIN DOWNSTREAM OF 1ST FLOOR BATHROOM
 GROUP.
 5) SHT P2 SANITARY RISER DIAGRAM, 3"
 VENT REQUIRED FOR MAIN STACK PER SEC.
 903.1
 6) SEE ATTACHED SHEET CONCERNING FLORIDA
 STATUTE 553.80(2) (B). ADDITIONAL FEES
 SHALL BE IMPOSED AS THIS IS THE FIFTH
 TIME THESE COMMENTS HAVE BEEN ADDRESSED.
  
  
 REVIEW BY KEN STEVENS
 (561) 659-8096 EXT 8377

Review Stop P PLUMBING
Rev No 4 Status F Date 2003-02-28 Cont ID  
Sent By kstevens Date 2003-02-28 Time 09:32 Rev Time 0.75
Received By kstevens Date 2003-02-28 Time 09:31 Sent To  
Notes
2003-02-28 00:00:00DENIED
 REFERENCE: FBC-2001 PLUMBING
  
 PLAN REVIEW COMMENTS FROM 5-8-02/10-5-02
 AND 12-5-02 HAVE NOT BEEN ADDRESSED.
  
 1) SHT A2, 1 AUTOMATIC CLOTHES WASHER
 CONNECTION REQUIRED FOR EACH UNIT OR A
 CENTRAL FACILITY WITH 1 CONNECTION PER
 20 UNITS REQUIRED PER TABLE 403.1.
 2) SHT P1, WATER HEATER DETAIL, SHUT OFF
 VALVE REQUIRED FOR WATER HEATER. EMERGEN
 CY DRAIN PAN REQUIRED FOR ALL HEATERS
 ABOVE THE FIRST FLOOR. 3/4" PAN DRAIN
 LINE REQUIRED FOR PAN TERMINATING 6"
 ABOVE GRADE.
 3) SHT P1 PLUMBING NOTES, #'S 2, 5, 6,
 7, 8, 9, 10, & 11. CURRENT CODE IS FBC-
 2001 PLUMBING NOT SFBC AS STATED IN
 NOTES. PLEASE CHANGE NOTES TO REFLECT
 PRESENT PLUMBING CODE.
 4) SHT P1 PLUMBING NOTES: NOTE #2 SHEET
 Z1 REFERENCED IN NOTE NOT SUBMITTED.
 PLEASE SUBMIT ALL SHEETS FOR REVIEW.
 5) SHT P2 1ST & 2ND FLOOR WATER RISER
 DIAGRAMS, AIR CHAMBERS ARE NOT APPROVED.
 WATER HAMMER ARRESTORS SHALL BE PROVIDED
 PER SECTION 604.9 AND LOCATED NEXT TO
 THE FIXTURES NOT IN CEILING.
 6) SHT P2 SANITARY RISER DIAGRAM, 2ND
 FLOOR BATHROOM GROUP SHALL NOT DRAIN IN-
 TO VENT OF 1ST FLOOR BATHROOM GROUP. 2ND
 FLOR STACK SHALL BE TAKEN OFF BLDG DRAIN
 DOWNSTREAM OF 1ST FLOOR BATHROOM GROUP.
 7) SHT P2 SANITARY RISER DIAGRAM, 3"
 VENT REQUIRED FOR MAIN STACK PER SEC.
 903.1
 8) SEE ATTACHED SHEET - CONCERNING FLA
 STATUTE 553.80(2)(B) - ADDITIONAL FEES
 SHALL BE IMPOSED AS THIS IS THE FOURTH
 TIME THESE COMMENTS HAVE BEEN ADDRESSED.
  
 REVIEW BY KEN STEVENS
 (561) 659-8096 EXT 8377

Review Stop P PLUMBING
Rev No 3 Status F Date 2002-12-05 Cont ID  
Sent By rmcdouga Date 2003-02-21 Time 10:46 Rev Time 0.75
Received By lmartine Date 2002-12-03 Time 17:05 Sent To Z
Notes
2002-12-03 00:00:00DENIED
 REFERENCE: FBC-2001 PLUMBING
  
 1) FROM PREVIOUS REVIEWS 5-8-2 & 10-5-2
 SHT A2, 1 AUTOMATIC CLOTHES WASHER CON-
 NECTION REQUIRED FOR EACH UNIT OR A CEN-
 TRAL FACILITY WITH 1 CONNECTION PER 20
 UNITS REQUIRED PER TABLE 403.1
 2) FROM PREVIOUS REVIEWS 5-8-2 & 10-5-2
 SHT P1 PLUMBING NOTES, #'S 2, 5, 6, 7, 8
 9, 10, & 11. CURRENT CODE IS FBC-2001
 PLUMBING, NOT SFBC AS STATED IN NOTES.
 PLEASE CHANGE NOTES TO REFLECT PRESENT
 PLUMBING CODE.
 3) FROM PREVIOUS REVIEWS 5-8-2 & 10-5-2
 SHT P1 PLUMBING NOTES #2 SHEET Z1 REFER-
 ENCED IN NOTE NOT SUBMITTED. PLEASE SUB-
 MIT ALL SHEETS FOR REVIEW.
 4) FROM PREVIOUS REVIEWS 5-8-2 & 10-5-2
 SHT P2 1ST & 2ND FLOOR WATER WATER RISER
 DIAGRAMS, AIR CHAMBERS ARE NOT APPROVED.
 WATER HAMMER ARRESTORS SHALL BE PROVIDED
 FOR WASH MACHINE, ICE MAKER, AND DISH
 WASHER IF PROVIDED. SEC 604.9
 5) FROM PREVIOUS REVIEWS 5-8-2 & 10-5-2
 SHT P2 SANITARY RISER DIAGRAM, 2ND FLOOR
 BATHROOM GROUP SHALL NOT DRAIN INTO VENT
 OF 1ST FLOOR BATHROOM GROUP VENT. 2ND
 FLOOR STACK SHALL BE TAKEN OFF BLDG
 DRAIN DOWNSTREAM OF 1ST FLOOR BATHROOM
 GROUP. FLOOR PLAN DOES NOT SHOW KITCHEN
 ON SECOND FLOOR
 6) FROM PREVIOUS REVIEWS 5-8-2 & 10-5-2
 SHT P2 SANITARY RISER DIAGRAM, 3" VENT
 REQUIRED FOR MAIN STACK VENT PER SECTION
 903.1
  
 REVIEW BY KEN STEVENS
 (561) 659-8096 EXT 8377

Review Stop P PLUMBING
Rev No 2 Status F Date 2002-10-05 Cont ID  
Sent By jleech Date 2002-10-05 Time 10:04 Rev Time 2.00
Received By jleech Date 2002-10-05 Time 10:04 Sent To  
Notes
2002-10-05 00:00:00DENIED;
 PLAN REVIEW COMMENTS FROM 5/8/02 HAVE
 NOT BEEN ADDRESSED.NOTES FROM 5/8/02 ARE
 LISTED BELOW.
  
 1.SHT AE. 1 AUTOMATIC CLOTHES WASHER
 CONNECTION REQUIRED FOR EACH UNIT OR A
 CENTRAL FACILITY WITH 1 CONNECTION PER
 20 UNITS REQUIRED PER TABLE 403.1.
 2.3/4 " PAN DRAIN LINE REQUIRED FOR ALL
 PANS INSTALLED. PAN DRAIN TO TERMINATE
 OUTSIDE 6" ABOVE GRADE.
 3.NOTES ON SHEET P-1 CURRENT CODE IS
 FBC-2001 NOT SFBC. PLEASE CHANGE NOTES
 TO REFLECT PRESENT PLUMBING CODE.
 4.SHT P-1 PLUMBING NOTE 1 SHT Z-1
 REFERENCED IN NOTE WAS NOT SUBMITED
 WITH PLANS.
 5.AIR CHAMBERS ARE NOT APPROVED. WATER
 HAMER ARRESTORS SHALL BE INSTALLED PER
 FBC 2001.
 6.SHT P-2 SANITARY RISER DIAGRAM. SECOND
 FLOOR BATHROOM GROUP SHALL NOT DRAIN
 INTO THE VENT FOR THE FIRST FLOOR.
 RISER DIAGRAM SHOWS A KITCHENSINK ON
 SECOND FLOOR, FLOOR PLAN DOESNOT SHOW
 KITCHEN.
 7.SHT P-2 SANITARY RISER DIAGRAM 3" VENT
 REQUIRED FOR MAIN STACK VENT PER SEC.
 903.1
 PLUMBING PLAN REVIEW BY;
 JOHN LEECH
 659-8096 EXT 8369

Review Stop P PLUMBING
Rev No 1 Status F Date 2002-05-08 Cont ID  
Sent By kstevens Date 2002-05-08 Time 09:55 Rev Time 0.00
Received By kstevens Date 2002-05-08 Time 09:55 Sent To B
Notes
2002-05-08 00:00:00DENIED
 REFERENCE: FBC-2001 PLUMBING.
  
 1) SHT A2, 1 AUTOMATIC CLOTHES WASHER
 CONNECTION REQUIRED FOR EACH UNIT OR A
 CENTRAL FACILITY WITH I CONNECTION PER
 20 UNITS REQUIRED PER TABLE 403.1
 2) SHT P1, WATER HEATER DETAIL, SHUT OFF
 VALVE REQUIRED FOR WATER HEATER. EMERGEN
 CY DRAIN PAN REQUIRED FOR ALL HEATERS
 ABOVE FIRST FLOOR. 3/4" PAN DRAIN LINE
 REQUIRED FOR PAN TERMINATING 6" ABOVE
 GRADE.
 3) SHT P1 PLUMBING NOTES, #'S 2,5,6,7,8,
 9,10, & 11. CURRENT CODE IS FBC-2001
 PLUMBING, NOT SFBC AS STATED IN NOTES.
 PLEASE CHANGE NOTES TO REFLECT PRESENT
 PLUMBING CODE.
 4) SHT P1 PLUMBING NOTES, NOTE #2 SHEET
 Z1 REFERENCED IN NOTE NOT SUBMITTED.
 PLEASE SUBMIT ALL SHEETS FOR REVIEW.
 5) SHT P2 1ST & 2ND FLOOR WATER RISER
 DIAGRAMS, AIR CHAMBERS ARE NOT APPROVED.
 WATER HAMMER ARRESTORS SHALL BE PROVIDED
 FOR WASH MACHINE, ICE MAKER, & DISHWASH-
 ER IF PROVIDED. LOCATE W.H.A. NEAR FIX-
 TURE IN AN "EFFECTIVE RANGE" NOT AT TOP
 OF DROP.
 6) SHT P2 SANITARY RISER DIAGRAM, 2ND
 FLOOR BATHROOM GROUP SHALL NOT DRAIN IN-
 TO VENT OF 1ST FLOOR BATHROOM GROUP VENT
 2ND FLOOR STACK SHALL BE TAKEN OFF BLDG
 DRAIN DOWNSTREAM OF 1ST FLOOR BATHROOM
 GROUP.
 7) SHT P2 SANITARY RISER DIAGRAM, 3"
 VENT REQUIRED FOR MAIN STACK VENT PER
 SEC 903.1
  
 REVIEW BY KEN STEVENS
 (561) 659-8096 EXT 8377

Review Stop R ROOF PLAN REVIEW
Rev No 3 Status P Date 2004-01-23 Cont ID  
Sent By rmcdouga Date 2004-01-23 Time 13:11 Rev Time 0.00
Received By rmcdouga Date   Time   Sent To  
Notes
***NONE***

Review Stop R ROOF PLAN REVIEW
Rev No 2 Status F Date 2002-12-09 Cont ID  
Sent By rmcdouga Date 2002-12-09 Time 14:18 Rev Time 2.00
Received By rmcdouga Date   Time   Sent To  
Notes
2002-12-09 00:00:00BUILDING DENIED
  
 1) THE COST OF REPAIRS HAS BEEN
 ESTABLISHED BASED ON A CONSTRUCTION COST
 STANDARD AND DETERMINED TO EXCEED FIFTY
 PERCENT OF THE STRUCTURES VALUE. THIS IS
 THE REASON THE STRUCTURE HAS BEEN
 SCHEDULED TO BE DEMOLISHED. THE
 CONSTRUCTION BOARD OF ADJUSTMENT AND
 APPEALS HAS CONCURED WITH THIS
 ASSESSMENT AND RULED THAT THE STRUCTURE
 IS MORE THAN FIFTY PERCENT DETERIORATED.
 THEREFORE, BASED ON THE FLORIDA BUILDING
 CODE SECTION 3401.7.2.6 THE ENTIRE
 STRUCTURE SHALL BE MADE TO CONFORM TO
 THE REQUIREMENTS FOR A NEW STRUCTURE OR
 BE ENTIRELY DEMOLISHED.
  
 2) PLEASE ADDRESS ALL OF THE COMMENTS
 FROM THE LAST REVIEW. COPY ATTACHED.
  
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW
 (561)659-8096 EXT.8202

Review Stop R ROOF PLAN REVIEW
Rev No 1 Status F Date 2002-09-30 Cont ID  
Sent By rmcdouga Date 2002-09-30 Time 11:59 Rev Time 4.00
Received By rmcdouga Date   Time   Sent To  
Notes
2002-09-30 00:00:00DENIED BY BUILDING
  
 1) STRUCTURE MUST REMAIN A SINGLE FAMILY
 RESIDENCE PER CITY OF WPB ZONING
 DEPARTMENT. THEREFORE, ITEMS 1 AND 13 ON
 FIRST REVIEW ARE NOT REQUIRED. PLEASE
 REVISE SHEET 1 FROM MULTIFAMILY TO
 SINGLE FAMILY.
  
 2) THE ENTIRE STRUCTURE IS REQUIRED TO
 BE MADE TO CONFORM TO THE REQUIREMENTS
 FOR A NEW STRUCTURE DUE TO THE REPAIRS
 AMOUNTING TO MORE THAN 50% OF THE VALUE
 OF THE EXISTING BUILDING. SEE 2001 FBC
 SECTION 3401.7.2.6.
  
 3) PROVIDE ENERGY CALCULATIONS AND
 MANUAL J CALCULATIONS AS REQUIRED BY THE
 FBC CHAPTER 13.
  
 4) INDICATE DESIGN INFORMATION ON PLANS.
 2001 FL. BLD CODE 1606.1.7 THE FOLLOWING
 INFORMATION RELATED TO WIND SHALL BE
 SHOWN ON THE CONSTRUCTION DRAWINGS,
 1)- BASIC WIND SPEED, MPH
 2)- WIND IMPORTANCE FACTOR, & BUILDING
 CATEGORY
 3)- WIND EXPOSURE
 4)- INTERNAL PRESSURE COEFFICIENT,
 5)- COMPONENTS & CLADDING, THE DESIGN
 WIND PRESSURES IN TERMS OF PSF.
  
 5) SHEETS A2 AND A4 REFERENCE THE WRONG
 CODE AND DESIGN CRITERIA. PLEASE REVISE.
 THE 2001 FLORIDA BUILDING CODE AND
 ASCE 7-98 ARE THE PROPER REFERENCES.
  
 6) PLEASE REVISE THE CODE REFERENCES ON
 A4 TO FLORIDA BUILDING CODE IN THE
 FASTENER SCHEDULE. REVISE #12 UNDER
 TYPICAL SECTION NOTES TO REFERENCE
 ASCE 7-98.
  
 7) REVISE ITEM #9 UNDER TYPICAL SECTION
 NOTES ON A4 TO ALL WINDOWS.
  
 8) INDICATE ON THE PLANS THAT ADEQUATE
 SUBSTRATE IS TO BE PROVIDE FOR THE
 ATTACHMENT OF THE STORM PANELS.
  
 9) PROVIDE (2) COPIES OF AN INSTALLATION
 SCHEDULE AND KEY PLAN FOR THE HURRICANE
 PANELS.
  
 10) PLEASE REVISE SHEET A3 WHICH SHOWS A
 KITCHEN ON THE SECOND FLOOR.
  
 11) INDICATE THE UNDER FLOOR INSULATION
 AT THE FIRST FLOOR AS REQUIRED BY FBC
 CHAPTER 13.
  
 12) STUCCO ON LATHE AS INDICATED ON WALL
 SECTIONS ON A5 IS REQUIRED TO BE 7/8"
 THICK PER FBC 2504.2.1 AND ASTM C 926.
  
 13) A CONTINOUS LOAD PATH FROM THE ROOF
 TO THE FOUNDATION IS REQUIRED TO
 TRANSFER THE LOADS. NO CONNECTORS ARE
 SHOWN ON A5 TO CONNECT THE BOTTOM PLATE
 AND FLOOR JOISTS TO SILL PLATE AT THE
 FIRST FLOOR. NO CONNECTORS ARE INDICATED
 FROM TOP PLATES ON FIRST FLOOR TO BOTTOM
 PLATE OF SECOND FLOOR. INDICATE THESE
 CONNECTORS ON THE PLANS.
  
 14) FIREBLOCKING IS REQUIRED BETWEEN THE
 FLOOR AND WALL ASSEMBLIES ON THE FIRST
 AND SECOND FLOORS PER FBC 2305.1. PLEASE
 SHOW THIS ON THE PLANS. INDICATE THE
 LOCATION AND MATERIALS USED TO DRAFTSTOP
 THE FLOOR/CEILING ASSEMBLY INTO 500 SQFT
 AREAS PER FBC 2305.2.2.
  
 5) INDICATE THE ATTIC ACCESS ON THE
 PLANS THAT COMPLIES WITH 2309.6.
  
 16) EMERGENCY ESCAPE AND RESCUE OPENINGS
 ARE REQUIRED AT SLEEPING ROOMS PER 2001
 FBC 1005.4. THE 1/2 34SH WINDOWS DO NOT
 PROVIDE REQUIRED NET CLEAR OPENING AREA
 FOR THE SECOND FLOOR OR THE CLEAR
 OPENING HEIGHT. THE ROOMS WHICH HAVE
 CLOSETS MUST ALSO COMPLY.
  
 17) INTERIOR AND EXTERIOR STAIRS MUST BE
 MADE TO COMPLY WITH 2001 FBC. PROVIDE
 DETAILS OF STAIRS, HANDRAILS AND GUARD-
 RAILS. THE INTERMEDIATE RAILS ON THE
 STAIRS MUST REJECT THE PASSAGE OF A 4"
 DIAMETER SPHERE THROUGH ANY OPENING. THE
 PICKETS INDICATED ON SHEET A2 DO NOT
 COMPLY.
  
 18) PROVIDE COPIES OF SURVEY INDICATING
 DISTANCES TO THE PROPERTY LINES IN ORDER
 TO DETERMINE COMPLIANCE WITH TABLE 600
 FOR PERCENT OF WALL AREA ALLOWED AS WALL
 OPENINGS.
  
 19) PROVIDE ELEVATIONS. INDICATE FLOOR,
 CEILING, CRAWL SPACE, ETC. ELEVATIONS.
 INDICATE THE MEAN ROOF HEIGHT AND ROOF
 PITCH ON THE PLANS.
  
 20) INDICATE THE POSITIVE AND NEGATIVE
 WINDLOAD PRESSURES FOR ALL EXTERIOR DOOR
 AND WINDOW OPENINGS ON THE PLANS.
  
 21) PROVIDE (2) CURRENT AND COMPLETE
 COPIES OF SBCCI OR METRO-DADE PRODUCT
 APPROVALS FOR:
 - EXTERIOR WOOD DOOR
 - EXTERIOR ALUMINUM DOOR
 THE PRODUCT APPROVAL THAT WAS SUBMITTED
 IS FOR AN EXTERIOR STEEL DOOR WHICH IS
 NOT INDICATED ON THE PLANS.
  
 22) THE DOOR SCHEDULE ON A2 INDICATES
 HOLLOW CORE WOOD EXTERIOR DOORS. CHAPTER
 13 OF THE FBC DOES NOT ALLOW THIS TYPE
 OF DOOR TO BE USED AT THE EXTERIOR.
 PLEASE REVISE.
  
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW
 (561)659-8096 EXT.8202

Review Stop Z ZONING
Rev No 4 Status P Date 2003-02-19 Cont ID  
Sent By lmartine Date 2003-02-19 Time 08:38 Rev Time 0.00
Received By lmartine Date   Time   Sent To  
Notes
2003-02-19 00:00:00APP BY SGRAHAM

Review Stop Z ZONING
Rev No 3 Status F Date 2002-12-05 Cont ID  
Sent By sgraham Date 2002-12-05 Time 10:18 Rev Time 0.25
Received By sgraham Date   Time   Sent To B
Notes
2002-12-05 00:00:00DENIED, 3RD CK LIST, SHEET A-3 IS
 STILL SHOWING A KITCHEN ON THE 2ND
 FLOOR, ANY SHEETS SHOWING A KITCHEN ON
 2ND FLOOR MUST BE REMOVED BEFORE ZONING
 CAN APPROVE THESE PLANS

Review Stop Z ZONING
Rev No 2 Status F Date 2002-09-17 Cont ID  
Sent By lmartine Date 2002-12-05 Time 09:32 Rev Time 0.25
Received By sgraham Date   Time   Sent To  
Notes
2002-09-17 00:00:00DENIED AGAIN,SHEET A-3 IS SHOWING A
 KITCHEN ON 2ND FLOOR, THIS IS A SINGLE
 FAMILY HOUSE, ONLY ONE KITCHEN ALLOWED
 THIS BLDG CAN NOT BE USED AS 2-UNITS

Review Stop Z ZONING
Rev No 1 Status F Date 2002-05-14 Cont ID  
Sent By btrobaug Date 2002-04-08 Time 14:56 Rev Time 0.25
Received By sgraham Date   Time   Sent To  
Notes
2002-05-14 00:00:00DENIED, BLDG MUST BE REPAIRED AS A
 SINGLE FAMILY RESIDENT ONLY.HOUSE
 WAS BUILT AS A SFR NOT 2-UNITS