Plan Review Stops For Permit 02040368 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
8 |
Status |
P |
Date |
2004-06-21 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2004-06-21 |
Time |
08:04 |
Rev Time |
1.00 |
Received By |
rmcdouga |
Date |
2004-06-21 |
Time |
08:04 |
Sent To |
|
|
Notes |
2004-06-21 00:00:00 | REVISION TO CHANGE WINDOW MANUFACTURER | | IS OK. WINDOWS MUST COMPLY WITH FBC FOR | | EGRESS AND SAFETY GLAZING. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
7 |
Status |
P |
Date |
2004-01-22 |
|
|
Cont ID |
|
Sent By |
mjacobs |
Date |
2004-06-17 |
Time |
08:52 |
Rev Time |
2.00 |
Received By |
rmcdouga |
Date |
2004-01-22 |
Time |
15:49 |
Sent To |
|
|
Notes |
2004-01-22 00:00:00 | BUILDING PROVISO | | | | 1) SUBMIT CURRENT PRODUCT APPROVALS FOR | | DOORS. | | | | 2) SEPARATE PERMITS REQUIRED FOR TRADES | | AND ROOFING. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
6 |
Status |
F |
Date |
2003-12-15 |
|
|
Cont ID |
|
Sent By |
kstevens |
Date |
2004-01-22 |
Time |
09:06 |
Rev Time |
3.00 |
Received By |
rmcdouga |
Date |
2003-12-15 |
Time |
15:44 |
Sent To |
|
|
Notes |
2003-12-15 00:00:00 | DENIED | | | | 1) THE WINDOW AND DOOR PRESSURES ON A2 | | ARE INCORRECT. THE MAXIMUM PRESSURES | | FOR THE STRUCTURE ARE THE SAME FOR BOTH | | FLOORS AND ARE BASED ON A TWO STORY | | STRUCTURE. PLEASE CORRECT. | | | | 2) THE NEGATIVE PRESSURE SPECIFIED ON | | THE PLANS OF -57 PSF EXCEEDS THE | | NEGATIVE DESIGN PRESSURES OF THE DOORS | | AND THE 35 SINGLE HUNG WINDOWS. SEE THE | | PRODUCT APPROVALS. PLEASE CORRECT. | | NOTE: REVIEW THE SPECIFIED WIND LOAD | | PRESSURES. THE FBC TABLE 1606.2B FOR A | | STRUCTURE WITH A MEAN ROOF HEIGHT OF 30' | | OR LESS WITH EXPOSURE B LISTS THE | | MAXIMUM PRESSURES AS +35.3 AND -47.2 PSF | | | | 3) THE ID MARKS ON THE DOOR SCHEDULE DO | | NOT CORRESPOND TO THE ID MARKS ON THE | | PLANS. | | | | 4) CHANGE THE WINDOW SIZES ON SHEETS A3 | | AND P1 TO CORRESPOND WITH A2. | | | | 5) THE PRODUCT APPROVALS FOR THE JELD- | | WEN DOOR, THE SHINGLES AND STORM PANELS | | HAVE EXPIRED. SUBMIT CURRENT PRODUCT | | APPROVALS. | | | | 6) THE INSTALLATION SCHEDULE FOR THE | | STORM PANELS HAS ERRORS. PLEASE CORRECT. | | THE GLAZING IN THE DOORS ARE REQUIRED TO | | BE SHUTTERED. SPECIFY THE ANCHOR TYPE | | AND REQUIRED SPACING OF THE ANCHORS AS | | INDICATED ON THE PRODUCT APPROVAL. | | | | 7) THE ORIGINAL WET SIGNATURE AND DATE | | AS WELL AS THE EMBOSSD SEAL OF THE | | ENGINEER ARE REQUIRED ON EACH PAGE OF | | PLANS AND ON ALL DRAWINGS FROM HIM. | | | | 8) PLEASE REVIEW THE EAST & WEST | | ELEVATIONS FOR COMPLIANCE WITH FBC | | TABLE 600 REQUIREMENTS. THE AREA OF WALL | | ALLOWED AS OPENINGS IS 20% ON THE EAST | | SIDE AND 40% ON THE WEST SIDE. THE | | LARGER EGRESS WINDOWS MAY EXCEED THE | | ALLOWABLE AREA. SUBMIT YOUR CALCULATIONS | | FOR THESE TWO ELEVATIONS. | | | | ROBERT MCDOUGAL | | BLDG. PLAN REVIEW | | (561)805-6714 |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
5 |
Status |
F |
Date |
2003-10-20 |
|
|
Cont ID |
|
Sent By |
jleech |
Date |
2003-12-13 |
Time |
10:31 |
Rev Time |
2.00 |
Received By |
rmcdouga |
Date |
2003-10-20 |
Time |
07:44 |
Sent To |
|
|
Notes |
2003-10-20 00:00:00 | BUILDING DENIED | | | | 1) ENERGY CALCULATIONS ARE REQUIRED TO | | BE SIGNED AND DATED BY THE OWNER/AGENT. | | FBC CHAPTER 13. | | | | 2) SPECIFY THE ROOF PITCH, MEAN ROOF | | HEIGHT, HEIGHT OF FLOORS AND CEILINGS | | ABOVE GRADE ON THE ELEVATIONS. | | | | 3) THE PRODUCT APPROVALS SUBMITTED ARE | | FOR JELD-WEN "GLAZED" EXTERIOR STEEL | | DOORS.THE SCHEDULE ON THE PLANS SPECIFY | | STANLEY DOORS W/ ACCEPTANCE #00-0512.09. | | THE SCHEDULE SPECIFIES ALUMNIUM DOORS. | | PLEASE REVISE. | | | | 4) THE 34 SH WINDOWS SPECIFIED ON THE | | PLANS DO NOT PROVIDE THE CLEAR OPENING | | SIZE REQUIRED FOR EMERGENCY ESCAPE AND | | RESCUE OPENINGS BY FBC 1005.4.4. | | | | 5) THE PLANS SPECIFY BINNINGS PAN | | AMERICAN WINDOWS WITH ACCEPTANCE # | | 01-0226.04. THE PRODUCT APPROVALS THAT | | WERE SUBMITTED ARE FOR TRACO WINDOWS. | | | | 6) THE SIZES SPECIFIED IN THE SCHEDULE | | FOR THE 14SH, 1/2 33SH AND 1/2 34SH | | WINDOWS ARE INCORRECT. PLEASE CORRECT. | | | | 7) SUBMIT A KEY PLAN AND INSTALLATION | | SCHEDULE FOR THE STORM PANELS. INDICATE | | THE CONNECTOR TYPE & SPACING AND TYPE OF | | MOUNT THAT WILL BE USED. | | | | 8) THE WALL SECTIONS ON A-5 DO NOT | | SPECIFY A CONCRETE CAP WITH HORIZONTAL | | REINFORCEMENT OR VERTICAL REINFORCEMENT | | AND FILLED CELLS TYING THE STEM WALL TO | | THE FOOTER. A CONTINOUS LOAD PATH FROM | | THE ROOF TO THE FOOTING IS REQUIRED. | | SPECIFY ON THE PLAN HOW THE LOAD WILL BE | | TRANSFERED FROM THE TOP OF THE STEM WALL | | TO THE FOUNDATION. | | | | ROBERT MCDOUGAL | | BLDG. PLAN REVIEW | | (561)805-6714 |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
4 |
Status |
F |
Date |
2003-08-14 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2003-08-14 |
Time |
14:37 |
Rev Time |
2.00 |
Received By |
rmcdouga |
Date |
2003-08-14 |
Time |
14:37 |
Sent To |
|
|
Notes |
2003-08-14 00:00:00 | DENIED | | | | 1)SUBMIT ENERGY CALCULATIONS AS REQUIRED | | BY FBC CHAPTER 13. | | | | 2) PROVIDE TWO COPIES OF A KEY PLAN AND | | INSTALLATION SCHEDULE FOR THE STORM | | PANELS. NOTE: THE PRODUCT APPROVALS THAT | | WERE SUBMITTED FOR THE STORM PANELS ARE | | EXPIRED. PLEASE SUBMIT CURRENT ONES. | | | | 3) SUBMIT A SIGNED AND SEALED SURVEY | | INDICATING THE LOCATION OF THE STRUCTURE | | ON THE PROPERTY AND THE DISTANCE TO THE | | PROPERTY LINES. THIS IS REQUIRED TO | | DETERMINE THE PERCENT OF WALL AREA THAT | | IS ALLOWED AS OPENINGS. FBC TABLE 600 | | | | 4) PROVIDE EXTERIOR ELEVATIONS. INDICATE | | THE HEIGHT ABOVE GRADE TO FLOORS, | | CEILINGS, ETC. INDICATE THE MEAN ROOF | | HEIGHT AND PITCH. | | | | 5)PROVIDE (2) CURRENT AND COMPLETE | | COPIES OF SBCCI OR METRO-DADE PRODUCT | | APPROVALS FOR: | | - THE EXTERIOR ALUMINUM DOORS | | PRODUCT APPROVALS THAT WERE SUBMITTED | | ARE FOR STEEL DOORS. IF YOU ARE USING | | STEEL EXTERIOR DOORS, PLEASE REVISE THE | | DOOR SCHEDULE ON THE PLANS. | | | | 6) THE ITEMS THAT ARE REDLINED ON THE | | PLANS ARE REQUIRED TO BE INITALED AND | | DATED BY THE DESIGNER OF RECORD. | | | | 7) THE DOOR/WINDOW PRESSURES LISTED ON | | A-2 CONFLICT WITH THOSE ON A-1. PLEASE | | CORRECT. | | | | 8) THE WINDOW SCHEDULE ON A-2 DOES NOT | | INCLUDE THE 34 SH WINDOWS SPECIFIED ON | | THE FLOOR PLAN. THE WRONG SIZES ARE | | GIVEN FOR THE 14SH, 1/2 33SH AND | | 1/2 34SH WINDOWS. PLEASE CORRECT. | | | | 9) SPECIFY THE SPACING OF THE THE MTS 30 | | CONNECTORS ON A-5. | | | | 10) THE WALL SECTIONS ON A-5 DO NOT | | INDICATE A CAP BEAM ON TOP OF THE STEM | | WALL WITH DOWN BARS CONNECTING TO THE | | FOOTER. A CONTINOUS TIE FROM THE ROOF TO | | THE FOOTING IS REQUIRED TO TRANSFER THE | | LOADS TO THE GROUND. SPECIFY HOW THIS | | WILL BE ACHIEVED. | | | | 11) SEVERAL OF THESE COMMENTS WERE NOTED | | IN PREVIOUS REVIEWS AND HAVE NOT BEEN | | ADDRESSED. SEE FL STATUTE 553.80 (2) (B) | | | | ROBERT MCDOUGAL | | BLDG. PLAN REVIEW | | (561)805-6714 |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
3 |
Status |
F |
Date |
2003-04-15 |
|
|
Cont ID |
|
Sent By |
pkrauss |
Date |
2003-08-14 |
Time |
10:24 |
Rev Time |
4.00 |
Received By |
rmcdouga |
Date |
|
Time |
|
Sent To |
|
|
Notes |
2003-04-14 00:00:00 | BUILDING DENIED | | | | 1) FBC 1606.1.7 WIND LOADS. THE PLANS | | SHALL STATE THE BASIC WIND SPEED, WIND | | IMPORTANCE FACTOR, WIND EXPOSURE | | CATEGORY, INTERNAL PRESSURE COEFFICENT, | | AND EXTERIOR COMPONENT AND CLADDING | | DESIGN WIND PRESSURES. THIS INFORMATION | | IS REQUIRED TO BE ON THE PLANS. | | | | 2) SHEETS A2 AND A4 CONTAIN REFERENCES | | TO THE WRONG CODE AND INCORRECT DESIGN | | CRITERIA. PLEASE CORRECT. | | | | 3) PROVIDE ENERGY CALCULATIONS. SEE FBC | | CHAPTER 13. | | | | 4) THE FASTENER SCHEDULE ON A4 REFERS TO | | SOUTH FLORIDA BUILDING CODE UNDER THE | | REMARKS COLUMN. PLEASE CORRECT TO FBC. | | | | 5)CORRECT NOTE #11 UNDER TYPICAL SECTION | | NOTES ON A4 AND THE DRYWALL FASTENER | | SPACING SPECIFIED ON DETAIL 1 AND DETAIL | | 5 ON A5 TO COMPLY WITH FBC TABLE 2306.1. | | | | 6) SPECIFY ON THE PLANS THAT ADEQUATE | | SUBSTRATE WILL BE PROVIDED AT THE | | WINDOWS FOR ATTACHMENT OF THE STORM | | PANELS. | | | | 7) PROVIDE (2) COPIES OF INSTALLATION | | SCHEDULE AND KEY PLAN FOR STORM PANELS. | | NOTE: THE PRODUCT APPROVALS THAT WERE | | SUBMITTED FOR STORM PANELS HAS EXPIRED. | | PLEASE SUBMIT CURRENT ONES. | | | | 8) STUCCO ON METAL LATH OVER SOLID BASE | | IS REQUIRED BY FBC 2504.2.1 AND ASTM C | | 926 TO BE 7/8" THICK. PLEASE REVISE ON | | WALL SECTIONS. | | | | 9) INDICATE THE ATTIC ACCESS ON THE | | PLANS. SEE FBC 2309.6. | | | | 10) FBC 1005.4 REQUIRES SLEEPING ROOMS | | TO HAVE AN EMERGENCY ESCAPE AND RESCUE | | OPENING. SEE CLEAR OPENING SIZE AND AREA | | REQUIREMENTS. THE 1/2- 34SH WINDOWS | | SHOWN ON THE PLANS DO NOT COMPLY. | | | | 11) PROVIDE DETAILS OF THE INTERIOR AND | | EXTERIOR STAIRS. SPECIFY THE RISER | | HEIGHTS AND TREAD DEPTHS. INDICATE THE | | FOUNDATION THAT SUPPORTS THE EXTERIOR | | STAIRS. | | | | 12) PROVIDE A SIGNED AND SEALED SURVEY | | INDICATING THE LOCATION OF THE STRUCTURE | | ON THE PROPERTY AND THE DISTANCE TO THE | | PROPERTY LINES. THIS IS REQUIRED TO | | DETERMINE THE PERCENT OF WALL AREA THAT | | IS ALLOWED AS OPENINGS. | | | | 13)PROVIDE EXTERIOR ELEVATIONS. INDICATE | | THE HEIGHT ABOVE GRADE TO FLOORS, | | CEILINGS, ETC. INDICATE THE MEAN ROOF | | HEIGHT AND ROOF PITCH. | | | | 14) SPECIFY THE POSITIVE AND NEGATIVE | | DESIGN WINDLOAD PRESSURES ON THE PLANS | | FOR ALL EXTERIOR OPENINGS. | | | | 15) PROVIDE (2) CURRENT AND COMPLETE | | COPIES OF SBCCI OR METRO-DADE PRODUCT | | APPROVALS FOR: | | - EXTERIOR WOOD DOOR | | - EXTERIOR ALUMINUM DOOR | | THESE ARE THE EXTERIOR DOORS THAT ARE | | SPECIFIED ON THE PLANS IN THE DOOR | | SCHEDULE ON ON A2. IF YOU ARE NOT USING | | THESE DOORS, CHANGE THE SCHEDULE TO | | INDICATE THE DOORS THAT WILL BE USED. | | | | 16) THE DOOR SCHEDULE INDICATES THAT TWO | | EXTERIOR DOORS ARE HOLLOW CORE WOOD. | | THIS IS NOT ALLOWED BY FBC CHAPTER 13. | | (ENERGY EFFICIENCY) | | | | 17) THE COMMENTS NOTED IN PREVIOUS | | REVIEWS HAVE NOT BEEN ADDRESSED. FL | | STATUTE 553.80 (2) (B) REQUIRES A FEE OF | | FOUR TIMES THE PLAN REVIEW PORTION OF | | THE PERMIT FEE TO BE IMPOSED FOR EACH | | TIME AFTER THE THIRD REVIEW IN WHICH THE | | SAME ITEM HAS NOT BEEN CORRECTED. | | | | ROBERT MCDOUGAL | | BLDG. PLAN REVIEW | | (561)659-8096 EXT.8202 |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
F |
Date |
2003-02-20 |
|
|
Cont ID |
|
Sent By |
shernand |
Date |
2003-04-02 |
Time |
15:36 |
Rev Time |
4.00 |
Received By |
rmcdouga |
Date |
2003-02-20 |
Time |
16:28 |
Sent To |
P |
|
Notes |
2003-02-20 00:00:00 | BUILDING DENIED | | THIS IS THE FOURTH STRUCTURAL REVIEW. | | | | 1) THE ENTIRE STRUCTURE SHALL BE MADE TO | | CONFORM THE REQUIREMENTS FOR A NEW | | STRUCTURE PER FBC 3401.7.2.6 AND THE | | CONSTRUCTION BOARD OF ADJUSTMENT AND | | APPEALS. | | | | 2) A SUCCESSOR PROFESSIONAL ENGINEER | | MUST USE HIS OWN TITLE BLOCK, SEAL AND | | SIGNATURE AND MUST REMOVE THE TITLE | | BLOCK, SEAL AND SIGNATURE OF THE | | ORIGINAL PROFESSIONAL ENGINEER BEFORE | | REUSING ANY SEALED CONTRACT DOCUMENTS. | | SEE FAC 61G15-27 FOR REQUIREMENTS. | | | | 3) FBC 1606.1.7WIND LOAD.THE PLANS | | SHALL STATE THE BASIC WIND SPEED, WIND | | IMPORTANCE FACTOR, WIND EXPOSURE | | CATEGORY, INTERNAL PRESSURE COEFFICIENT, | | AND EXTERIOR COMPONENT AND CLADDING | | DESIGN WIND PRESSURES. | | | | 4) SHEETS A2 AND A4 REFERENCE THE WRONG | | CODE AND DESIGN CRITERIA. PLEASE | | CORRECT. | | | | 5) PROVIDE ENERGY CALCULATIONS. SEE FBC | | CHAPTER 13. | | | | 6) THE FASTENER SCHEDULE ON A4 CONTAINS | | INCORRECT INFORMATION. REFER TO FBC | | TABLE 2306.1 AND CORRECT. | | | | 7) PLEASE CORRECT NOTE 11 ON A4 AND DRY- | | WALL FASTENER SPACING NOTE ON A5 TO | | COMPLY WITH FBC TABLE 2306.1. | | | | 8) SPECIFY ON THE PLANS ADEQUATE | | SUBSTRATE AT WINDOWS FOR THE ATTACHMENT | | OF STORM PANELS. | | | | 9) PROVIDE KEY PLANS AND INSTALLATION | | SCHEDULE FOR THE STORM PANELS. | | | | 10) STUCCO ON METAL LATH IS REQUIRED TO | | BE 7/8" THICK PER FBC 2504.2.1 AND ASTM | | C 926. PLEASE REVISE ON WALL SECTIONS. | | | | 11) INDICATE THE ATTIC ACCESS ON THE | | PLANS. SEE FBC 2309.6 | | | | 12) FBC 1005.4 REQUIRES SLEEPING ROOMS | | TO HAVE AN EMERGENCY ESCAPE AND RESCUE | | OPENING. SEE CLEAR OPENING SIZE AND AREA | | REQUIREMENTS. | | | | 13) PROVIDE DETAILS OF INTERIOR AND | | EXTERIOR STAIRS. SPECIFY THE RISER | | HEIGHT AND TREAD DEPTH. INDICATE THE | | FOUNDATION THAT SUPPORTS EXTERIOR STAIRS | | | | 14) PROVIDE A SIGNED AND SEALED SURVEY | | INDICATING THE LOCATION OF THE STRUCTURE | | ON THE PROPERTY AND THE DISTANCE TO THE | | PROPERTY LINES, IN ORDER TO DETERMINE | | COMPLIANCE WITH FBC TABLE 600. | | | | 15) PROVIDE EXTERIOR ELEVATIONS. | | INDICATE HEIGHTS ABOVE GRADE TO FLOORS, | | CEILINGS, ETC. INDICATE MEAN ROOF HEIGHT | | AND ROOF PITCH. | | | | 16) SPECIFY THE POSITIVE AND NEGATIVE | | DESIGN WINDLOAD PRESSURES ON THE PLANS | | FOR ALL EXTERIOR OPENINGS. | | | | 17) PROVIDE (2) CURRENT AND COMPLETE | | COPIES OF SBCCI OR METRO-DADE PRODUCT | | APPROVALS FOR: | | - EXTERIOR WOOD DOOR | | - EXTERIOR ALUMNIUM DOOR | | THESE DOORS ARE SPECIFIED IN THE DOOR | | SCHEDULE ON A2. | | | | 18) THE DOOR SCHEDULE INDICATES THAT | | TWO EXTERIOR DOORS ARE HOLLOW CORE WOOD. | | THIS IS NOT ALLOWED BY FBC CHAPTER 13. | | (FL ENERGY CODE) | | | | 19) THE STRUCTURE IS REQUIRED TO BE | | RETURNED TO A SINGLE FAMILY DWELLING BY | | THE ZONING DEPARTMENT. PLEASE REVISE THE | | DRAWINGS TO REFLECT THIS. REMOVE THE | | SECOND FLOOR KITCHEN AND CHANGE TITLE | | BLOCK. | | | | MOST OF THESE COMMENTS WERE MADE IN THE | | THREE PREVIOUS REVIEWS AND HAVE NOT BEEN | | ADDRESSED. THE SAME PLANS HAVE BEEN | | SUBMITTED WITH NO REVISIONS BEING MADE. | | FLORIDA STATUTE 553.80(2)(B) REQUIRES A | | FEE OF FOUR TIMES THE PLAN REVIEW | | PORTION OF THE PERMIT FEE TO BE IMPOSED. | | SEE ATTACHMENT. | | IF YOU HAVE ANY QUESTIONS CALL: | | ROBERT MCDOUGAL | | BLDG. PLAN REVIEW | | (561)659-8096 EXT.8202 |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2002-12-09 |
|
|
Cont ID |
|
Sent By |
sgraham |
Date |
2003-02-19 |
Time |
08:17 |
Rev Time |
5.00 |
Received By |
rmcdouga |
Date |
|
Time |
|
Sent To |
|
|
Notes |
2002-05-13 00:00:00 | BUILDING DENIED | | | | 1) IMPACT FEES MUST BE PAID TO PALM | | BEACH COUNTY, PLANS STAMPED BY THEM AND | | COPY OF RECEIPT SUBMITTED TO CITY OF | | WEST PALM BEACH BUILDING DEPARTMENT, | | BEFORE A BUILDING PERMIT CAN BE ISSUED. | | DUE TO THE CHANGE FROM A SINGLE FAMILY | | DWELLING TO A DUPLEX ADDITION IMPACT | | FEES MAY BE DUE TO PALM BEACH COUNTY. | | | | 2) PROVIDE ENERGY CALCULATIONS AND | | EQUIPMENT SIZING CALCULATIONS (MANUAL J) | | AS REQUIRED BY CHAPTER 13 OF THE FLORIDA | | BUILDING CODE, THE FLORIDA ENERGY | | EFFICIENCY CODE FOR BUILDING | | CONSTRUCTION. | | | | 3) INDICATE DESIGN INFORMATION ON PLANS. | | 2001 FLORIDA BUILDING CODE AND ASCE7-98 | | NOT SFBC OR ASCE7-93. SHEETS A2 AND A4 | | REFERENCE THE WRONG CODE AND DESIGN | | CRITERIA. | | | | 4) FASTENING SCHEDULE ON A4 CONTAINS | | INCORRECT INFORMATION. PLEASE REFER TO | | TABLE 2306.1 IN THE 2001 FBC AND MAKE | | CORRECTIONS. | | | | 5) PLEASE CORRECT NOTE 11 ON A4 AND | | DRYWALL FASTENER SPACING NOTE ON A5 TO | | COMPLY WITH 2001FBC TABLE 2306.1 OR AS | | SPECIFIED BY MANUFACTURER. | | | | 6) INDICATE ON THE PLANS THAT ADEQUATE | | SUBSTRATE IS TO BE PROVIDED FOR THE | | ATTACHMENT OF STORM PANELS. | | | | 7) PROVIDE (2) COPIES OF AN INSTALLATION | | SCHEDULE AND KEY PLAN FOR HURRICANE | | PANELS. | | | | 8) STUCCO ON LATHE AS INDICATED ON WALL | | SECTIONS ON A5 IS REQUIRED TO BE 7/8" | | THICK PER FBC 2504.2.1 AND ASTM C 926. | | | | 9) A CONTINOUS LOAD PATH FROM THE ROOF | | TO THE FOUNDATION IS REQUIRED TO | | TRANSFER LOADS. NO CONNECTORS ARE SHOWN | | ON A5 BETWEEN THE FLOOR SILL AND STUDS | | OR BETWEEN 1ST AND 2ND FLOORS. PLEASE | | CORRECT. | | | | 10) FIREBLOCKING IS REQUIRED BETWEEN THE | | FLOOR AND WALL ASSEMBLIES AT THE 1ST AND | | 2ND FLOORS PER FBC 2305.1. PLEASE | | INDICATE ON PLANS. | | | | 11) INDICATE ATTIC ACCESS ON PLANS. | | FBC 2309.6 | | | | 12) EMERGENCY ESCAPE AND RESCUE OPENINGS | | ARE REQUIRED AT SLEEPING ROOMS PER FBC | | 1005.4. THE 1/2- 34SH WINDOWS INDICATED | | DO NOT PROVIDE THE REQUIRED NET CLEAR | | OPENING. PLEASE CORRECT. | | | | 13) A ONE HOUR TENANT SEPARATION IS | | REQUIRED BETWEEN UNITS PER FBC 704.2.2.3 | | AND 704.3.1. | | | | 14) INDICATE HOW THE REQUIRED MEANS OF | | EGRESS FROM THE SECOND FLOOR UNIT WILL | | BE PROVIDED. EXIT STAIRWAYS SHALL COMPLY | | WITH FBC 1006. PROVIDE STAIR DETAILS. | | | | 15) PROVIDE COPIES OF SURVEY INDICATING | | DISTANCES TO PROPERTY LINES IN ORDER TO | | DETERMINE COMPLIANCE WITH TABLE 600 FOR | | PERCENT OF WALL OPENINGS ALLOWED. | | | | 16) PROVIDE ELEVATIONS. INDICATE FLOOR, | | CEILING,ETC. HEIGHTS. INDICATE MEAN ROOF | | HEIGHT AND ROOF PITCH. | | | | 17) INDICATE THE POSITIVE AND NEGATIVE | | PRESSURES FOR ALL EXTERIOR DOOR AND | | WINDOW OPENINGS ON THE PLANS. | | | | 18) PROVIDE (2) CURRENT AND COMPLETE | | COPIES OF SBCCI OR METRO-DADE PRODUCT | | APPROVALS FOR: | | - EXTERIOR WOOD DOOR | | - EXTERIOR ALUMINUM DOOR | | THE PRODUCT APPROVAL THAT WAS SUBMITTED | | WAS FOR EXTERIOR STEEL DOOR, WHICH IS | | NOT LISTED IN THE DOOR SCHEDULE ON A2. | | | | 19) THE DOOR SCHEDULE INDICATES THE | | EXTERIOR WOOD DOOR WITH A HOLLOW CORE. | | THIS IS NOT ALLOWED BY THE FLORIDA | | ENERGY CODE (FBC CHAPTER 13). | | | | IF YOU HAVE ANY QUESTIONS PLEASE CALL: | | ROBERT MCDOUGAL | | BLDG. PLAN REVIEW | | (561)659-8096 EXT.8202 |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
2 |
Status |
P |
Date |
2002-12-03 |
|
|
Cont ID |
|
Sent By |
kstevens |
Date |
2003-10-14 |
Time |
07:44 |
Rev Time |
0.00 |
Received By |
btrobaug |
Date |
2002-12-03 |
Time |
13:45 |
Sent To |
|
|
Notes |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
P |
Date |
2002-04-08 |
|
|
Cont ID |
|
Sent By |
btrobaug |
Date |
2002-12-03 |
Time |
13:45 |
Rev Time |
0.00 |
Received By |
btrobaug |
Date |
2002-04-08 |
Time |
13:00 |
Sent To |
Z |
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
8 |
Status |
N |
Date |
2004-06-17 |
|
|
Cont ID |
|
Sent By |
mjacobs |
Date |
2004-06-17 |
Time |
08:52 |
Rev Time |
0.00 |
Received By |
mjacobs |
Date |
2004-06-17 |
Time |
08:51 |
Sent To |
B |
|
Notes |
2004-06-17 00:00:00 | SENT TO RM DESK/REVISION /PRODUCT APPROV |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
7 |
Status |
N |
Date |
2004-01-13 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2004-01-13 |
Time |
15:18 |
Rev Time |
0.00 |
Received By |
csiegber |
Date |
2004-01-13 |
Time |
15:18 |
Sent To |
P |
|
Notes |
2004-01-13 00:00:00 | TO KS BOX/RESUB |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
6 |
Status |
N |
Date |
2003-11-26 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2003-11-26 |
Time |
16:00 |
Rev Time |
0.00 |
Received By |
csiegber |
Date |
2003-11-26 |
Time |
16:00 |
Sent To |
P |
|
Notes |
2003-11-26 00:00:00 | TO KS BOX/RESUB |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
5 |
Status |
N |
Date |
2003-10-06 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2003-10-06 |
Time |
10:17 |
Rev Time |
0.00 |
Received By |
csiegber |
Date |
2003-10-06 |
Time |
10:17 |
Sent To |
E |
|
Notes |
2003-10-06 00:00:00 | TO PK DESK |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
4 |
Status |
N |
Date |
2003-08-13 |
|
|
Cont ID |
|
Sent By |
alange |
Date |
2003-08-13 |
Time |
09:18 |
Rev Time |
0.00 |
Received By |
alange |
Date |
2003-08-13 |
Time |
09:18 |
Sent To |
E |
|
Notes |
2003-08-13 00:00:00 | | | TO BT DESK |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2003-04-02 |
|
|
Cont ID |
|
Sent By |
shernand |
Date |
2003-04-02 |
Time |
15:36 |
Rev Time |
0.00 |
Received By |
shernand |
Date |
2003-04-02 |
Time |
15:31 |
Sent To |
B |
|
Notes |
2003-04-02 00:00:00 | RM DESK |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2003-02-04 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2003-02-04 |
Time |
13:36 |
Rev Time |
0.00 |
Received By |
dpalmer |
Date |
2003-02-04 |
Time |
13:36 |
Sent To |
|
|
Notes |
2003-02-04 00:00:00 | PLANS SENT OUT FRONT UNDER"K" SEE NOTES | | ON FRONT SRCEEN. |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2002-12-03 |
|
|
Cont ID |
|
Sent By |
btrobaug |
Date |
2002-12-03 |
Time |
13:44 |
Rev Time |
0.00 |
Received By |
btrobaug |
Date |
2002-12-03 |
Time |
13:44 |
Sent To |
E |
|
Notes |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
4 |
Status |
N |
Date |
2003-10-09 |
|
|
Cont ID |
|
Sent By |
pkrauss |
Date |
2003-10-09 |
Time |
13:17 |
Rev Time |
0.00 |
Received By |
pkrauss |
Date |
2003-10-09 |
Time |
13:02 |
Sent To |
|
|
Notes |
2003-10-09 00:00:00 | NO MECHANICAL PLANS SUBMITTED FOR REVIEW | | ENERGY CALCS INDICATE DUCTLESS PTAC | | UNITS. |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
3 |
Status |
F |
Date |
2003-08-14 |
|
|
Cont ID |
|
Sent By |
pkrauss |
Date |
2003-08-14 |
Time |
10:24 |
Rev Time |
0.30 |
Received By |
pkrauss |
Date |
2003-08-14 |
Time |
10:24 |
Sent To |
P |
|
Notes |
2003-08-14 00:00:00 | DENIED: | | COMMENTS NOT ADDRESSED FROM PREVIOUS | | REVIEW: | | | | NO MECHANICAL PLANS SUBMITTED FOR REVIEW | | PROVIDE ENERGY AND MANUAL J CALCULATIONS | | AS PER 2001 FBC CHAPTER 13 SUB-CHAPTER | | 600 | | | | PROVIDED INFORMATION ON THE HVAC. | | INDICATE IF SYSTEM IS NEW, EXISTING OR | | IF DUCTWORK IS BEING REPLACED. | | | | IF YOU HAVE ANY QUESTIONS, PLEASE | | CONTACT PATTY KRAUSS AT (561) 805-6719. |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
2 |
Status |
F |
Date |
2003-04-09 |
|
|
Cont ID |
|
Sent By |
pkrauss |
Date |
2003-04-09 |
Time |
14:08 |
Rev Time |
0.35 |
Received By |
pkrauss |
Date |
2003-04-09 |
Time |
14:08 |
Sent To |
E |
|
Notes |
2003-04-09 00:00:00 | DENIED: | | | | 1.PROVIDE ENERGY & MANUAL J CALCS. | | | | 2.PLANS INDICATE FIRE DAMAGE, PLEASE | | INDICATE WHAT IF ANY MECHANICAL WORK IS | | INVOLVED.NEW OR EXISTING SYSTEM? | | | | IF YOU HAVE ANY QUESTIONS, PLEASE | | CONTACT PATTY KRAUSS AT (561) 805-6719 |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
1 |
Status |
N |
Date |
2002-04-30 |
|
|
Cont ID |
|
Sent By |
kstevens |
Date |
2003-04-04 |
Time |
08:13 |
Rev Time |
0.50 |
Received By |
hmoser |
Date |
2002-04-30 |
Time |
16:50 |
Sent To |
|
|
Notes |
2002-04-30 00:00:00 | NO PLANS,NO ENERGY CALCS NO MANUAL J. | | MECHANICAL CONTRACTOR MUST BRING IN | | INFORMATION WITH PERMIT APPLICATION | | PLAN REVIEW BY HAROLD MOSER 4/30/02 |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
9 |
Status |
P |
Date |
2004-01-22 |
|
|
Cont ID |
|
Sent By |
kstevens |
Date |
2004-01-22 |
Time |
09:03 |
Rev Time |
0.33 |
Received By |
kstevens |
Date |
2004-01-22 |
Time |
09:03 |
Sent To |
B |
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
8 |
Status |
F |
Date |
2003-12-13 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2004-01-13 |
Time |
15:18 |
Rev Time |
1.25 |
Received By |
jleech |
Date |
2003-12-13 |
Time |
10:30 |
Sent To |
B |
|
Notes |
2003-12-13 00:00:00 | DENIED; | | 1.PLANS ARE NOT SIGNED SEE FL. ADMINIS- | | TRATIVE CODE SEC. 61G15-23.002 ( COPY | | ENCLOSED ). | | 2.PLANS SHOW WASHER DRYER ON FIRST AND | | SECOND FLOOR.RISER DIAGRAM SHOWS W/M ON | | FIRST FLOOR. PLEASE CORRECT. | | 3.RISER DIAGRAM; | | A.FIRST FLOOR BATHROOM CANNOT DIS- | | CHARGE INTO THE SECOND FLOOR | | BATHROOM SANITARY RISER. | | B.WASHING MACHINE VENT MUST RE-VENT | | 6" ABOVE THE HIGHEST FIXTURE ON | | THE SECOND FLOOR. | | C.TOTAL FIXTURE UNITS IS 14 NOT 18. | | PLUMBING PLAN REVIEW BY; | | JOHN LEECH | | 805-6695 |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
7 |
Status |
F |
Date |
2003-10-14 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2003-11-26 |
Time |
16:00 |
Rev Time |
0.75 |
Received By |
kstevens |
Date |
2003-10-14 |
Time |
07:29 |
Sent To |
E |
|
Notes |
2003-10-14 00:00:00 | DENIED | | REFERENCE: FBC-2001 PLUMBING | | FBC-2001 CHAPTER 1 | | FLORIDA STATUTES | | | | 1) COMMENTS FROM LAST REVIEW HAVE NOT | | BEEN ADDRESSED. PLEASE SEE ATTACHED | | COMMENTS FROM 8-14-3. | | 2) SEE ATTACHED SHEET CONCERNING FLORIDA | | STATUTE 553.80(2)(B) DESIGN PROFESSIONAL | | IF THE COMMENTS ARE NOT ADDRESSED THEN | | 4 TIMES THE FEE ($1,800) SHALL BE IM- | | POSED. | | | | REVIEW BY KEN STEVENS | | (561) 805-6721 | | FAX (561) 653-2692 | | E-MAIL [email protected] |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
6 |
Status |
F |
Date |
2003-08-14 |
|
|
Cont ID |
|
Sent By |
kstevens |
Date |
2003-08-14 |
Time |
12:46 |
Rev Time |
1.00 |
Received By |
kstevens |
Date |
2003-08-14 |
Time |
12:46 |
Sent To |
|
|
Notes |
2003-08-14 00:00:00 | DENIED | | REFERENCE: FBC-2001 PLUMBING | | | | 1) SANITARY RISER DIAGRAM DOES NOT MEET | | CODE REQUIREMENTS. | | A) 909.1 ONLY THE FIXTURES WITHIN THE | | BATHROOM GROUPS SHALL CONNECT TO THE WET | | VENTED HORIZONTAL BRANCH DRAIN. ANY | | ADDITIONAL FIXTURES SHALL DISCHARGE | | DOWNSTREAM OF THE WET VENT. WASHMACHINES | | B) BATHTUB P-TRAPS CANNOT BE TAKEN OFF | | ABOVE THE WASHMACHINE AND THE WATER | | CLOSET AND THE CLEANOUT.????? WATER | | CLOSET AND TUB SHOULD BE CONNECTED ON | | THE HORIZONTAL BELOW THE FLOOR WITH THE | | CLEANOUT AND LAV ABOVE THE FLOOR | | C) SANITARY RISER DIAGRAM SHOWS A KIT. | | SINK ON THE SECOND FLOOR, BUT THE FLOOR | | PLAN DOES NOT SHOW A KITCHEN SINK. | | 3) SEE ATTACHED SHEET FOR EXAMPLE OF | | APPROVED BATHROOM/WASH MACHINE RISER | | DIAGRAM. - SUBMIT A RISER DIAGRAM THAT | | MEETS CODE AND REFLECTS FLOOR PLAN. | | | | REVIEW BY KEN STEVENS | | (561) 805-6721 | | FAX (561) 653-2692 | | E-MAIL [email protected] |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
5 |
Status |
F |
Date |
2003-04-04 |
|
|
Cont ID |
|
Sent By |
pkrauss |
Date |
2003-08-14 |
Time |
10:32 |
Rev Time |
0.75 |
Received By |
kstevens |
Date |
2003-04-04 |
Time |
08:02 |
Sent To |
M |
|
Notes |
2003-04-04 00:00:00 | DENIED | | REFERENCE: FBC-2001 PLUMBING | | | | PLAN REVIEW COMMENTS FROM 5-8-2, 10-5-2 | | 12/5/2 & 2-28-3 HAVE NOT BEEN ADDRESSED. | | | | 1) SHT A2, 1 AAUTOMATIC CLOTHES WASHER | | CONNECTION REQUIRED FOR EACH UNIT OR A | | CENTRAL FACILITY WITH 1 CONNECTION PER | | 20 UNITS REQUIRED PER TABLE 403.1. | | 2) SHT P1 PLUMBING NOTES #'2 2, 5, 6, 7, | | 8, 9, 10, & 11. CURRENT CODE IS FBC-2001 | | PLUMBING, NOT SFBC AS STATED IN NOTES. | | PLEASE CHANGE NOTES TO REFLECT PRESENT | | PLUMBING CODE. | | 3) SHT P2 1ST & 2ND FLOOR WATER RISER | | DIAGRAMS, AIR CHAMBERS ARE NOT APPROVED. | | WATER HAMMER ARRESTORS SHALL BE PROVIDED | | PER SECTION 604.9 AND LOCATED PER PDI-WH | | 201 AND MANUF. INSTALLATION INSTRUCTIONS | | 4) SHT P2 SANITARY RISER DIAGRAM, 2ND | | FLOOR BATHROOM GROUP SHALL NOT DRAIN IN- | | TO VENT OF 1ST FLOOR BATHROOM GROUP. 2ND | | FLOOR STACK SHALL BE TAKEN OFF BLDG | | DRAIN DOWNSTREAM OF 1ST FLOOR BATHROOM | | GROUP. | | 5) SHT P2 SANITARY RISER DIAGRAM, 3" | | VENT REQUIRED FOR MAIN STACK PER SEC. | | 903.1 | | 6) SEE ATTACHED SHEET CONCERNING FLORIDA | | STATUTE 553.80(2) (B). ADDITIONAL FEES | | SHALL BE IMPOSED AS THIS IS THE FIFTH | | TIME THESE COMMENTS HAVE BEEN ADDRESSED. | | | | | | REVIEW BY KEN STEVENS | | (561) 659-8096 EXT 8377 |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
4 |
Status |
F |
Date |
2003-02-28 |
|
|
Cont ID |
|
Sent By |
kstevens |
Date |
2003-02-28 |
Time |
09:32 |
Rev Time |
0.75 |
Received By |
kstevens |
Date |
2003-02-28 |
Time |
09:31 |
Sent To |
|
|
Notes |
2003-02-28 00:00:00 | DENIED | | REFERENCE: FBC-2001 PLUMBING | | | | PLAN REVIEW COMMENTS FROM 5-8-02/10-5-02 | | AND 12-5-02 HAVE NOT BEEN ADDRESSED. | | | | 1) SHT A2, 1 AUTOMATIC CLOTHES WASHER | | CONNECTION REQUIRED FOR EACH UNIT OR A | | CENTRAL FACILITY WITH 1 CONNECTION PER | | 20 UNITS REQUIRED PER TABLE 403.1. | | 2) SHT P1, WATER HEATER DETAIL, SHUT OFF | | VALVE REQUIRED FOR WATER HEATER. EMERGEN | | CY DRAIN PAN REQUIRED FOR ALL HEATERS | | ABOVE THE FIRST FLOOR. 3/4" PAN DRAIN | | LINE REQUIRED FOR PAN TERMINATING 6" | | ABOVE GRADE. | | 3) SHT P1 PLUMBING NOTES, #'S 2, 5, 6, | | 7, 8, 9, 10, & 11. CURRENT CODE IS FBC- | | 2001 PLUMBING NOT SFBC AS STATED IN | | NOTES. PLEASE CHANGE NOTES TO REFLECT | | PRESENT PLUMBING CODE. | | 4) SHT P1 PLUMBING NOTES: NOTE #2 SHEET | | Z1 REFERENCED IN NOTE NOT SUBMITTED. | | PLEASE SUBMIT ALL SHEETS FOR REVIEW. | | 5) SHT P2 1ST & 2ND FLOOR WATER RISER | | DIAGRAMS, AIR CHAMBERS ARE NOT APPROVED. | | WATER HAMMER ARRESTORS SHALL BE PROVIDED | | PER SECTION 604.9 AND LOCATED NEXT TO | | THE FIXTURES NOT IN CEILING. | | 6) SHT P2 SANITARY RISER DIAGRAM, 2ND | | FLOOR BATHROOM GROUP SHALL NOT DRAIN IN- | | TO VENT OF 1ST FLOOR BATHROOM GROUP. 2ND | | FLOR STACK SHALL BE TAKEN OFF BLDG DRAIN | | DOWNSTREAM OF 1ST FLOOR BATHROOM GROUP. | | 7) SHT P2 SANITARY RISER DIAGRAM, 3" | | VENT REQUIRED FOR MAIN STACK PER SEC. | | 903.1 | | 8) SEE ATTACHED SHEET - CONCERNING FLA | | STATUTE 553.80(2)(B) - ADDITIONAL FEES | | SHALL BE IMPOSED AS THIS IS THE FOURTH | | TIME THESE COMMENTS HAVE BEEN ADDRESSED. | | | | REVIEW BY KEN STEVENS | | (561) 659-8096 EXT 8377 |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
3 |
Status |
F |
Date |
2002-12-05 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2003-02-21 |
Time |
10:46 |
Rev Time |
0.75 |
Received By |
lmartine |
Date |
2002-12-03 |
Time |
17:05 |
Sent To |
Z |
|
Notes |
2002-12-03 00:00:00 | DENIED | | REFERENCE: FBC-2001 PLUMBING | | | | 1) FROM PREVIOUS REVIEWS 5-8-2 & 10-5-2 | | SHT A2, 1 AUTOMATIC CLOTHES WASHER CON- | | NECTION REQUIRED FOR EACH UNIT OR A CEN- | | TRAL FACILITY WITH 1 CONNECTION PER 20 | | UNITS REQUIRED PER TABLE 403.1 | | 2) FROM PREVIOUS REVIEWS 5-8-2 & 10-5-2 | | SHT P1 PLUMBING NOTES, #'S 2, 5, 6, 7, 8 | | 9, 10, & 11. CURRENT CODE IS FBC-2001 | | PLUMBING, NOT SFBC AS STATED IN NOTES. | | PLEASE CHANGE NOTES TO REFLECT PRESENT | | PLUMBING CODE. | | 3) FROM PREVIOUS REVIEWS 5-8-2 & 10-5-2 | | SHT P1 PLUMBING NOTES #2 SHEET Z1 REFER- | | ENCED IN NOTE NOT SUBMITTED. PLEASE SUB- | | MIT ALL SHEETS FOR REVIEW. | | 4) FROM PREVIOUS REVIEWS 5-8-2 & 10-5-2 | | SHT P2 1ST & 2ND FLOOR WATER WATER RISER | | DIAGRAMS, AIR CHAMBERS ARE NOT APPROVED. | | WATER HAMMER ARRESTORS SHALL BE PROVIDED | | FOR WASH MACHINE, ICE MAKER, AND DISH | | WASHER IF PROVIDED. SEC 604.9 | | 5) FROM PREVIOUS REVIEWS 5-8-2 & 10-5-2 | | SHT P2 SANITARY RISER DIAGRAM, 2ND FLOOR | | BATHROOM GROUP SHALL NOT DRAIN INTO VENT | | OF 1ST FLOOR BATHROOM GROUP VENT. 2ND | | FLOOR STACK SHALL BE TAKEN OFF BLDG | | DRAIN DOWNSTREAM OF 1ST FLOOR BATHROOM | | GROUP. FLOOR PLAN DOES NOT SHOW KITCHEN | | ON SECOND FLOOR | | 6) FROM PREVIOUS REVIEWS 5-8-2 & 10-5-2 | | SHT P2 SANITARY RISER DIAGRAM, 3" VENT | | REQUIRED FOR MAIN STACK VENT PER SECTION | | 903.1 | | | | REVIEW BY KEN STEVENS | | (561) 659-8096 EXT 8377 |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
2 |
Status |
F |
Date |
2002-10-05 |
|
|
Cont ID |
|
Sent By |
jleech |
Date |
2002-10-05 |
Time |
10:04 |
Rev Time |
2.00 |
Received By |
jleech |
Date |
2002-10-05 |
Time |
10:04 |
Sent To |
|
|
Notes |
2002-10-05 00:00:00 | DENIED; | | PLAN REVIEW COMMENTS FROM 5/8/02 HAVE | | NOT BEEN ADDRESSED.NOTES FROM 5/8/02 ARE | | LISTED BELOW. | | | | 1.SHT AE. 1 AUTOMATIC CLOTHES WASHER | | CONNECTION REQUIRED FOR EACH UNIT OR A | | CENTRAL FACILITY WITH 1 CONNECTION PER | | 20 UNITS REQUIRED PER TABLE 403.1. | | 2.3/4 " PAN DRAIN LINE REQUIRED FOR ALL | | PANS INSTALLED. PAN DRAIN TO TERMINATE | | OUTSIDE 6" ABOVE GRADE. | | 3.NOTES ON SHEET P-1 CURRENT CODE IS | | FBC-2001 NOT SFBC. PLEASE CHANGE NOTES | | TO REFLECT PRESENT PLUMBING CODE. | | 4.SHT P-1 PLUMBING NOTE 1 SHT Z-1 | | REFERENCED IN NOTE WAS NOT SUBMITED | | WITH PLANS. | | 5.AIR CHAMBERS ARE NOT APPROVED. WATER | | HAMER ARRESTORS SHALL BE INSTALLED PER | | FBC 2001. | | 6.SHT P-2 SANITARY RISER DIAGRAM. SECOND | | FLOOR BATHROOM GROUP SHALL NOT DRAIN | | INTO THE VENT FOR THE FIRST FLOOR. | | RISER DIAGRAM SHOWS A KITCHENSINK ON | | SECOND FLOOR, FLOOR PLAN DOESNOT SHOW | | KITCHEN. | | 7.SHT P-2 SANITARY RISER DIAGRAM 3" VENT | | REQUIRED FOR MAIN STACK VENT PER SEC. | | 903.1 | | PLUMBING PLAN REVIEW BY; | | JOHN LEECH | | 659-8096 EXT 8369 |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
F |
Date |
2002-05-08 |
|
|
Cont ID |
|
Sent By |
kstevens |
Date |
2002-05-08 |
Time |
09:55 |
Rev Time |
0.00 |
Received By |
kstevens |
Date |
2002-05-08 |
Time |
09:55 |
Sent To |
B |
|
Notes |
2002-05-08 00:00:00 | DENIED | | REFERENCE: FBC-2001 PLUMBING. | | | | 1) SHT A2, 1 AUTOMATIC CLOTHES WASHER | | CONNECTION REQUIRED FOR EACH UNIT OR A | | CENTRAL FACILITY WITH I CONNECTION PER | | 20 UNITS REQUIRED PER TABLE 403.1 | | 2) SHT P1, WATER HEATER DETAIL, SHUT OFF | | VALVE REQUIRED FOR WATER HEATER. EMERGEN | | CY DRAIN PAN REQUIRED FOR ALL HEATERS | | ABOVE FIRST FLOOR. 3/4" PAN DRAIN LINE | | REQUIRED FOR PAN TERMINATING 6" ABOVE | | GRADE. | | 3) SHT P1 PLUMBING NOTES, #'S 2,5,6,7,8, | | 9,10, & 11. CURRENT CODE IS FBC-2001 | | PLUMBING, NOT SFBC AS STATED IN NOTES. | | PLEASE CHANGE NOTES TO REFLECT PRESENT | | PLUMBING CODE. | | 4) SHT P1 PLUMBING NOTES, NOTE #2 SHEET | | Z1 REFERENCED IN NOTE NOT SUBMITTED. | | PLEASE SUBMIT ALL SHEETS FOR REVIEW. | | 5) SHT P2 1ST & 2ND FLOOR WATER RISER | | DIAGRAMS, AIR CHAMBERS ARE NOT APPROVED. | | WATER HAMMER ARRESTORS SHALL BE PROVIDED | | FOR WASH MACHINE, ICE MAKER, & DISHWASH- | | ER IF PROVIDED. LOCATE W.H.A. NEAR FIX- | | TURE IN AN "EFFECTIVE RANGE" NOT AT TOP | | OF DROP. | | 6) SHT P2 SANITARY RISER DIAGRAM, 2ND | | FLOOR BATHROOM GROUP SHALL NOT DRAIN IN- | | TO VENT OF 1ST FLOOR BATHROOM GROUP VENT | | 2ND FLOOR STACK SHALL BE TAKEN OFF BLDG | | DRAIN DOWNSTREAM OF 1ST FLOOR BATHROOM | | GROUP. | | 7) SHT P2 SANITARY RISER DIAGRAM, 3" | | VENT REQUIRED FOR MAIN STACK VENT PER | | SEC 903.1 | | | | REVIEW BY KEN STEVENS | | (561) 659-8096 EXT 8377 |
|
|
Review Stop |
R |
ROOF PLAN REVIEW |
Rev No |
3 |
Status |
P |
Date |
2004-01-23 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2004-01-23 |
Time |
13:11 |
Rev Time |
0.00 |
Received By |
rmcdouga |
Date |
|
Time |
|
Sent To |
|
|
Notes |
|
|
Review Stop |
R |
ROOF PLAN REVIEW |
Rev No |
2 |
Status |
F |
Date |
2002-12-09 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2002-12-09 |
Time |
14:18 |
Rev Time |
2.00 |
Received By |
rmcdouga |
Date |
|
Time |
|
Sent To |
|
|
Notes |
2002-12-09 00:00:00 | BUILDING DENIED | | | | 1) THE COST OF REPAIRS HAS BEEN | | ESTABLISHED BASED ON A CONSTRUCTION COST | | STANDARD AND DETERMINED TO EXCEED FIFTY | | PERCENT OF THE STRUCTURES VALUE. THIS IS | | THE REASON THE STRUCTURE HAS BEEN | | SCHEDULED TO BE DEMOLISHED. THE | | CONSTRUCTION BOARD OF ADJUSTMENT AND | | APPEALS HAS CONCURED WITH THIS | | ASSESSMENT AND RULED THAT THE STRUCTURE | | IS MORE THAN FIFTY PERCENT DETERIORATED. | | THEREFORE, BASED ON THE FLORIDA BUILDING | | CODE SECTION 3401.7.2.6 THE ENTIRE | | STRUCTURE SHALL BE MADE TO CONFORM TO | | THE REQUIREMENTS FOR A NEW STRUCTURE OR | | BE ENTIRELY DEMOLISHED. | | | | 2) PLEASE ADDRESS ALL OF THE COMMENTS | | FROM THE LAST REVIEW. COPY ATTACHED. | | | | ROBERT MCDOUGAL | | BLDG. PLAN REVIEW | | (561)659-8096 EXT.8202 |
|
|
Review Stop |
R |
ROOF PLAN REVIEW |
Rev No |
1 |
Status |
F |
Date |
2002-09-30 |
|
|
Cont ID |
|
Sent By |
rmcdouga |
Date |
2002-09-30 |
Time |
11:59 |
Rev Time |
4.00 |
Received By |
rmcdouga |
Date |
|
Time |
|
Sent To |
|
|
Notes |
2002-09-30 00:00:00 | DENIED BY BUILDING | | | | 1) STRUCTURE MUST REMAIN A SINGLE FAMILY | | RESIDENCE PER CITY OF WPB ZONING | | DEPARTMENT. THEREFORE, ITEMS 1 AND 13 ON | | FIRST REVIEW ARE NOT REQUIRED. PLEASE | | REVISE SHEET 1 FROM MULTIFAMILY TO | | SINGLE FAMILY. | | | | 2) THE ENTIRE STRUCTURE IS REQUIRED TO | | BE MADE TO CONFORM TO THE REQUIREMENTS | | FOR A NEW STRUCTURE DUE TO THE REPAIRS | | AMOUNTING TO MORE THAN 50% OF THE VALUE | | OF THE EXISTING BUILDING. SEE 2001 FBC | | SECTION 3401.7.2.6. | | | | 3) PROVIDE ENERGY CALCULATIONS AND | | MANUAL J CALCULATIONS AS REQUIRED BY THE | | FBC CHAPTER 13. | | | | 4) INDICATE DESIGN INFORMATION ON PLANS. | | 2001 FL. BLD CODE 1606.1.7 THE FOLLOWING | | INFORMATION RELATED TO WIND SHALL BE | | SHOWN ON THE CONSTRUCTION DRAWINGS, | | 1)- BASIC WIND SPEED, MPH | | 2)- WIND IMPORTANCE FACTOR, & BUILDING | | CATEGORY | | 3)- WIND EXPOSURE | | 4)- INTERNAL PRESSURE COEFFICIENT, | | 5)- COMPONENTS & CLADDING, THE DESIGN | | WIND PRESSURES IN TERMS OF PSF. | | | | 5) SHEETS A2 AND A4 REFERENCE THE WRONG | | CODE AND DESIGN CRITERIA. PLEASE REVISE. | | THE 2001 FLORIDA BUILDING CODE AND | | ASCE 7-98 ARE THE PROPER REFERENCES. | | | | 6) PLEASE REVISE THE CODE REFERENCES ON | | A4 TO FLORIDA BUILDING CODE IN THE | | FASTENER SCHEDULE. REVISE #12 UNDER | | TYPICAL SECTION NOTES TO REFERENCE | | ASCE 7-98. | | | | 7) REVISE ITEM #9 UNDER TYPICAL SECTION | | NOTES ON A4 TO ALL WINDOWS. | | | | 8) INDICATE ON THE PLANS THAT ADEQUATE | | SUBSTRATE IS TO BE PROVIDE FOR THE | | ATTACHMENT OF THE STORM PANELS. | | | | 9) PROVIDE (2) COPIES OF AN INSTALLATION | | SCHEDULE AND KEY PLAN FOR THE HURRICANE | | PANELS. | | | | 10) PLEASE REVISE SHEET A3 WHICH SHOWS A | | KITCHEN ON THE SECOND FLOOR. | | | | 11) INDICATE THE UNDER FLOOR INSULATION | | AT THE FIRST FLOOR AS REQUIRED BY FBC | | CHAPTER 13. | | | | 12) STUCCO ON LATHE AS INDICATED ON WALL | | SECTIONS ON A5 IS REQUIRED TO BE 7/8" | | THICK PER FBC 2504.2.1 AND ASTM C 926. | | | | 13) A CONTINOUS LOAD PATH FROM THE ROOF | | TO THE FOUNDATION IS REQUIRED TO | | TRANSFER THE LOADS. NO CONNECTORS ARE | | SHOWN ON A5 TO CONNECT THE BOTTOM PLATE | | AND FLOOR JOISTS TO SILL PLATE AT THE | | FIRST FLOOR. NO CONNECTORS ARE INDICATED | | FROM TOP PLATES ON FIRST FLOOR TO BOTTOM | | PLATE OF SECOND FLOOR. INDICATE THESE | | CONNECTORS ON THE PLANS. | | | | 14) FIREBLOCKING IS REQUIRED BETWEEN THE | | FLOOR AND WALL ASSEMBLIES ON THE FIRST | | AND SECOND FLOORS PER FBC 2305.1. PLEASE | | SHOW THIS ON THE PLANS. INDICATE THE | | LOCATION AND MATERIALS USED TO DRAFTSTOP | | THE FLOOR/CEILING ASSEMBLY INTO 500 SQFT | | AREAS PER FBC 2305.2.2. | | | | 5) INDICATE THE ATTIC ACCESS ON THE | | PLANS THAT COMPLIES WITH 2309.6. | | | | 16) EMERGENCY ESCAPE AND RESCUE OPENINGS | | ARE REQUIRED AT SLEEPING ROOMS PER 2001 | | FBC 1005.4. THE 1/2 34SH WINDOWS DO NOT | | PROVIDE REQUIRED NET CLEAR OPENING AREA | | FOR THE SECOND FLOOR OR THE CLEAR | | OPENING HEIGHT. THE ROOMS WHICH HAVE | | CLOSETS MUST ALSO COMPLY. | | | | 17) INTERIOR AND EXTERIOR STAIRS MUST BE | | MADE TO COMPLY WITH 2001 FBC. PROVIDE | | DETAILS OF STAIRS, HANDRAILS AND GUARD- | | RAILS. THE INTERMEDIATE RAILS ON THE | | STAIRS MUST REJECT THE PASSAGE OF A 4" | | DIAMETER SPHERE THROUGH ANY OPENING. THE | | PICKETS INDICATED ON SHEET A2 DO NOT | | COMPLY. | | | | 18) PROVIDE COPIES OF SURVEY INDICATING | | DISTANCES TO THE PROPERTY LINES IN ORDER | | TO DETERMINE COMPLIANCE WITH TABLE 600 | | FOR PERCENT OF WALL AREA ALLOWED AS WALL | | OPENINGS. | | | | 19) PROVIDE ELEVATIONS. INDICATE FLOOR, | | CEILING, CRAWL SPACE, ETC. ELEVATIONS. | | INDICATE THE MEAN ROOF HEIGHT AND ROOF | | PITCH ON THE PLANS. | | | | 20) INDICATE THE POSITIVE AND NEGATIVE | | WINDLOAD PRESSURES FOR ALL EXTERIOR DOOR | | AND WINDOW OPENINGS ON THE PLANS. | | | | 21) PROVIDE (2) CURRENT AND COMPLETE | | COPIES OF SBCCI OR METRO-DADE PRODUCT | | APPROVALS FOR: | | - EXTERIOR WOOD DOOR | | - EXTERIOR ALUMINUM DOOR | | THE PRODUCT APPROVAL THAT WAS SUBMITTED | | IS FOR AN EXTERIOR STEEL DOOR WHICH IS | | NOT INDICATED ON THE PLANS. | | | | 22) THE DOOR SCHEDULE ON A2 INDICATES | | HOLLOW CORE WOOD EXTERIOR DOORS. CHAPTER | | 13 OF THE FBC DOES NOT ALLOW THIS TYPE | | OF DOOR TO BE USED AT THE EXTERIOR. | | PLEASE REVISE. | | | | ROBERT MCDOUGAL | | BLDG. PLAN REVIEW | | (561)659-8096 EXT.8202 |
|
|
Review Stop |
Z |
ZONING |
Rev No |
4 |
Status |
P |
Date |
2003-02-19 |
|
|
Cont ID |
|
Sent By |
lmartine |
Date |
2003-02-19 |
Time |
08:38 |
Rev Time |
0.00 |
Received By |
lmartine |
Date |
|
Time |
|
Sent To |
|
|
Notes |
2003-02-19 00:00:00 | APP BY SGRAHAM |
|
|
Review Stop |
Z |
ZONING |
Rev No |
3 |
Status |
F |
Date |
2002-12-05 |
|
|
Cont ID |
|
Sent By |
sgraham |
Date |
2002-12-05 |
Time |
10:18 |
Rev Time |
0.25 |
Received By |
sgraham |
Date |
|
Time |
|
Sent To |
B |
|
Notes |
2002-12-05 00:00:00 | DENIED, 3RD CK LIST, SHEET A-3 IS | | STILL SHOWING A KITCHEN ON THE 2ND | | FLOOR, ANY SHEETS SHOWING A KITCHEN ON | | 2ND FLOOR MUST BE REMOVED BEFORE ZONING | | CAN APPROVE THESE PLANS |
|
|
Review Stop |
Z |
ZONING |
Rev No |
2 |
Status |
F |
Date |
2002-09-17 |
|
|
Cont ID |
|
Sent By |
lmartine |
Date |
2002-12-05 |
Time |
09:32 |
Rev Time |
0.25 |
Received By |
sgraham |
Date |
|
Time |
|
Sent To |
|
|
Notes |
2002-09-17 00:00:00 | DENIED AGAIN,SHEET A-3 IS SHOWING A | | KITCHEN ON 2ND FLOOR, THIS IS A SINGLE | | FAMILY HOUSE, ONLY ONE KITCHEN ALLOWED | | THIS BLDG CAN NOT BE USED AS 2-UNITS |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
F |
Date |
2002-05-14 |
|
|
Cont ID |
|
Sent By |
btrobaug |
Date |
2002-04-08 |
Time |
14:56 |
Rev Time |
0.25 |
Received By |
sgraham |
Date |
|
Time |
|
Sent To |
|
|
Notes |
2002-05-14 00:00:00 | DENIED, BLDG MUST BE REPAIRED AS A | | SINGLE FAMILY RESIDENT ONLY.HOUSE | | WAS BUILT AS A SFR NOT 2-UNITS |
|
|