2002-03-21 00:00:00 | *********PROVISO********* |
| ****TRUSS ENGINEERING**** |
| |
| REVIEWED UNDER:1997 STANDARD BUILDING |
| CODE |
| |
| 1) ARCH SPECIFIES SEMCO, NO LONGER IN |
| BUSINESS, ENGINEER SPECIFIES BUCKETS |
| MANUFACTURED BY HUGHES WHICH ALSO IS |
| OUT OF BUSINESS.BOTH CORPS. WERE BOUGHT |
| BY USP AND SHOULD USE THE CURRENT PRO- |
| DUCT INFORMATION. |
| |
| 2) ARCH. ANCHOR SCHEDULE INDICATES THE |
| USE OF (2) STRAPS ON THE SAME TRUSS OR |
| GIRDER WITHIN 8" OF EACH OTHER (CMU OR |
| CONCRETE EMBEDDMENT OF 4"). IN COMMUNICA |
| TING WITH USP ENGINEERS YOU CAN NOT JUST |
| DOUBLE THE LOAD WHEN MULTIPLE STRAPS |
| ARE LOCATED WITH 8" OF EACH OTHER A DE- |
| RATING FACTOR SHALL OCCUR ON AN INDIVID- |
| UAL CASE BASES. |
| |
| LOT #11 |
| #3 H-7 H-7 1546 LSB UPLIFT, (2) TAPR |
| STRAPS REQUIRED, DERAING |
| #4 F-3 POINT 1 1675 LBS NOT 1350, |
| POINT 8 2030 LBS NOT 1800. |
| #5 HG-4 POINT 13ARCH PLANS INDICATE 3250 |
| AT POINT # 4, 2 SEMCO TAPR22 WHILE A |
| 3 MEMBER GIRDER REQUIRING A BUCKET WITH |
| THE CAPABILITY TO RESIST 2739 UPLIFT |
| AND 4678 REACTION. |
| |
| LOT #12 |
| #6 H-1 ARCH SHEET 7 INDICATES 2 POINT |
| BEARING, TRUSS ENG INDICATES 3 POINT |
| BEARING. POINT 11 WILL BE AT 2 HR TOWN- |
| HOUSE WALL REQUIRING A BUCKET. NEW 3RD |
| POINT BEARING (18) 3579 LBS UPLIFT & |
| 6145 LBS REACTION. |
| #7 HG-2 ANCHOR VALUE AT POINT 1 TO LOW, |
| SEE ARCH #4, 2 TAPR222 1485X 2=2970 |
| DERATING REQUIRED ACTUAL UPLIFT 2898 |
| #8 H-12 ARCH INDICATES FOR POINT #1 2800 |
| UPLIFT WHILE TRUSSENG INDICATES 3037 |
| 2 STRAPS 2800 DERATING REQUIRED CLOSER |
| THAN 8". |
| |
| BUILDING PLAN REVIEW |
| JIM WITMER |
| (561) 659-8096 X8412 |
| BUILDING PROVISO |