Plan Review Details - Permit 02021097
Plan Review Stops For Permit 02021097 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
P |
Date |
2002-03-18 |
|
|
Cont ID |
|
Sent By |
btrobaug |
Date |
2002-03-05 |
Time |
07:21 |
Rev Time |
0.75 |
Received By |
lsmith |
Date |
|
Time |
|
Sent To |
|
|
Notes |
2002-03-18 00:00:00 | **********PROVISO********* | | | | THE FOLLOWING ITEMS NEED TO BE ADDED TO | | THE DRAWINGS TO COMPLY WITH THE NEW | | FBC 2001 CHAPTER 4 SEC 424.2 FOR | | PRIVATESWIMMING POOLS: | | | | 1. ALL REFERENCES TO THE BUILDING CODES | | MUST BE "FBC 2001" | | | | 2. INCLUDED ON THE DETAIL DRAWINGS MUST | | BE A DETAIL OF THE CONCRETE SLAB FOR | | THEPOOL EQUIPMENT INCLUDING ALL | | ANCHORING DETAIL. | | | | 3. PLOT PLAN MUST CLEARLY SHOW DISTANCES | | FROM POOL TO RESIDENCE & WATERS EDGE TO | | PROPERTY LINE. |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
P |
Date |
2002-03-05 |
|
|
Cont ID |
|
Sent By |
btrobaug |
Date |
2002-03-05 |
Time |
07:21 |
Rev Time |
0.00 |
Received By |
btrobaug |
Date |
2002-03-05 |
Time |
07:02 |
Sent To |
B |
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
3 |
Status |
P |
Date |
2002-05-15 |
|
|
Cont ID |
|
Sent By |
kstevens |
Date |
2002-05-15 |
Time |
13:54 |
Rev Time |
0.00 |
Received By |
kstevens |
Date |
2002-05-15 |
Time |
13:54 |
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
2 |
Status |
F |
Date |
2002-05-04 |
|
|
Cont ID |
|
Sent By |
kstevens |
Date |
2002-05-04 |
Time |
07:10 |
Rev Time |
0.00 |
Received By |
kstevens |
Date |
2002-05-04 |
Time |
07:10 |
Sent To |
|
|
Notes |
2002-05-04 00:00:00 | DENIED | | REFERENCE: FBC-2001 424.2 SWIMMING POOLS | | | | 1) PLEASE ADJUST YOUR NOTES, DETAILS, OR | | SUBMITTALS TO REFLECT THE FOLLOWING IN- | | FORMATION REQUIRED FOR PLAN REVIEW | | 2) | | FBC-2001 SEC 424.2.6.6.2 SHOW COMPLIANCE | | WITH ANSI/ASME A112.19.8M. PROVIDE MODEL | | NUMBER AND MANUF INFO FOR VAC LOCK. | | (GIVE DETAIL OR ADD NOTE)(SUBMITTAL) | | 3) | | FBC-2001 SEC 424.2.7.1 POOL CIRCULATING | | PUMPS SHALL BE EQUIPPED ON THE INLET | | SIDE WITH AN APPROVED TYPE HAIR AND LINT | | STRAINER WHEN USED WITH A PRESSURE FIL- | | TER. (DETAIL) | | 4) | | FBC-2001 SEC 424.2.9 WATER SUPPLY, LOCAL | | ORD. #2853-95, BACKFLOW REQUIRED ON | | WATER SERVICE. (ADD TO NOTES) | | 5) | | FBC-2001 SEC 424.2.12.1 PRESSURE TESTS. | | PER MANUFACTURE RECOMMENDATIONS, NO AIR | | TEST SHALL BE APPROVED FOR PVC PIPE AND | | FITTINGS. (ADD TO NOTES) | | 6) | | FBC-2001 SEC 424.2.13.2JOINTS AND CON- | | NECTIONS, FBC PLMG SEC 605.21, PURPLE | | PRIMER REQUIRED ON PVC PIPING. (ADD TO | | NOTES) | | | | REVIEW BY KEN STEVENS | | (561) 659-8096 EXT 8377 |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
F |
Date |
2002-03-03 |
|
|
Cont ID |
|
Sent By |
pschmitz |
Date |
2002-03-03 |
Time |
10:40 |
Rev Time |
1.50 |
Received By |
pschmitz |
Date |
|
Time |
|
Sent To |
|
|
Notes |
2002-03-03 00:00:00 | PLUMBING PLAN REVIEW,FBC 2001, DENIED. | | (1) GENERAL NOTES #8 PALM BCH CNTY 1994 | | SWIMMING POOL CODE,CURRENT CODE,FBC 2001 | | SEC 424.2.6 ENGINEERING DESIGN. | | (2) SEC 424.2.6.6.2 SUCTION FITTINGS. | | CLEANING LINE.PROVIDE DETAIL | | (3) SEC 424.2.7.2 PROVIDE A DETAIL OF | | MOUNTING & ANCHORING POOL EQUIPMENT. | | (4) SEC 424.WATER SUPPLY.AND LOCAL | | ORDINANCE #2853-95. BACK FLOW PREVENTER | | REQUIRED ON WATER SERVICE. | | (5) SEC 424.2.21.4 PROVIDE A DETAIL OF | | HYDROSTATIC RELIEF VALVE, AS REQUIRED. | | FOR AREAS OF HIGH WATER TABEL. | | END OF COMMENTS PAUL SCHMITZ | | QUESTIONS561-659-8096X8233 |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
P |
Date |
2002-02-21 |
|
|
Cont ID |
|
Sent By |
sgraham |
Date |
2002-02-21 |
Time |
15:41 |
Rev Time |
0.25 |
Received By |
sgraham |
Date |
|
Time |
|
Sent To |
|
|
Notes |
|
|
|