2002-01-14 00:00:00 | ******************* UNSAT ************** |
| |
| 1)NOTE: PLEASE NOTE THAT A TYPICAL |
| ELECTRICAL RISER DIAGRAM IS SHOWN ON A3 |
| AND A DIFFERENT RISER IS SHOWN ON A5 |
| PLEASE NOTE THAT A COMPLETE RISER |
| DIAGRAM IS NEEDED FOR REVIEW. PLEASE |
| NOTE GROUPING OF MAIN DISCONNECTS PER |
| 230-72. |
| |
| 2)NOTE: PLEASE SUBMIT AIC RATINGS FOR |
| ALL NEW EQUIPMENT BEING INSTALLED. |
| MAINS/PANELS/BREAKERS MUST BE RATED FOR |
| THE AVAILABLE FAULT CURRENT PER 110-9. |
| |
| 3)NOTE: PLEASE NOTE THAT NO PANEL |
| SCHEDULES WERE SUBMITTED FOR UNITS, |
| CAN BE |
| TYPICAL. |
| |
| 4) NOTE: PLEASE LIST THE REQ`D BATH(S) |
| CIRCUIT(S) PER 210-11-C-3. |
| MUST BE 20A AND #12AWG. |
| |
| 5) NOTE: SMOKE DETECTORS ARE REQUIRED |
| INSIDE AND OUTSIDE ALL SLEEPING ROOMS. |
| ALSO ON EACH LEVEL OF A MULTI-LEVEL |
| DWELLING UNIT. ROOMS WITH BATHS AND OR |
| CLOSETS ARE CONSIDERED SLEEPING ROOMS. |
| PER NFPA-72 2-2.1.1.1. |
| |
| 6)NOTE: PLEASE NOTE THAT NO HANDWRITTEN |
| CHANGES MAY BE ON PLANS UNLESS DONE BY |
| THE ARCH/ENGINEER OF RECORD AND THEN |
| EACH INDIVIDUAL CHANGE MUST BE SIGNED |
| AND DATED.471.025/481.221 |
| |
| 7)NOTE: PLEASE NOTE/CLARIFY IF THERE |
| IS A 2HR SEPARATION OF UNITS IN ORDER |
| TO HAVE THE SEPARATE SERVICES THAT ARE |
| SHOWN? 230-2 |
| |
| 8)NOTE: PLEASE CLARIFY "DOOR" SHOWN IN- |
| -FRONT OF STAIRS? |
| |
| 9)NOTE: PLEASE NOTE LOAD CALCULATIONS |
| SHOW UNITS 1,2,4,5 AND THEN UNITS 4&6, |
| PLEASE CLARIFY 2-#4 UNITS? IS THE UPPER |
| #4 SUPPOSE TO BE #3 |
| |
| 10)NOTE: PLEASE ELECTRICAL PLANS DUE TO |
| NOTES ON SIDE OF PLANS. |
| |
| |
| PLEASE MAKE THE ABOVE CORRECTIONS, AND |
| SUBMIT FOR REVIEW. IF THERE ARE ANY |
| QUESTIONS, PLEASE CALL. |
| |
| DEWEY PALMER |
| ELECTRICAL PLAN REVIEW |
| 561-659-8096 EXT 8372 |