Plan Review Details - Permit 01101919
Plan Review Stops For Permit 01101919
Review Stop E ELECTRICAL
Rev No 1 Status P Date 2001-11-20 Cont ID  
Sent By dpalmer Date 2001-11-20 Time 20:44 Rev Time 0.00
Received By dpalmer Date 2001-11-20 Time 20:44 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2002-03-01 Cont ID  
Sent By pkrauss Date 2002-03-01 Time 15:55 Rev Time 0.30
Received By pkrauss Date 2002-03-01 Time 15:55 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2001-11-12 Cont ID  
Sent By hmoser Date 2001-11-12 Time 10:37 Rev Time 0.33
Received By hmoser Date 2001-11-12 Time 10:37 Sent To  
Notes
2001-11-12 00:00:00NO MECHANICAL PERMIT MUMBER ON THIS
 APPLICITION 11/12/01H.M.

Review Stop P PLUMBING
Rev No 1 Status P Date 2001-11-20 Cont ID  
Sent By kstevens Date 2001-11-20 Time 19:15 Rev Time 0.33
Received By kstevens Date 2001-11-20 Time 19:15 Sent To  
Notes
***NONE***

Review Stop R ROOF PLAN REVIEW
Rev No 4 Status P Date 2002-03-02 Cont ID  
Sent By jgomez Date 2002-03-02 Time 16:18 Rev Time 0.25
Received By jgomez Date 2002-03-02 Time 16:18 Sent To  
Notes
2002-03-02 00:00:00PRODUCT APPROVALS REVIEW.

Review Stop R ROOF PLAN REVIEW
Rev No 3 Status P Date 2002-02-25 Cont ID  
Sent By jgomez Date 2002-02-25 Time 10:40 Rev Time 0.50
Received By jgomez Date 2002-02-25 Time 10:40 Sent To  
Notes
2002-02-25 00:00:00TRUSS DRAWINGS AND REVISIONS.

Review Stop R ROOF PLAN REVIEW
Rev No 2 Status P Date 2002-01-18 Cont ID  
Sent By jgomez Date 2002-01-18 Time 11:56 Rev Time 3.50
Received By jgomez Date 2002-01-18 Time 11:56 Sent To  
Notes
2002-01-18 00:00:00APPROVED WITH PROVISO:
 1-PROVIDE PRODUCT APPROVAL FOR ENTRY
 DOORS. PRODUCT APPROVAL SUBMITTED IS
 FOR INSTALLATION IN A WOOD FRAME. SEE
 PRODUCT APPROVAL FRONT PAGE.
 -PROVIDE LEGIBLE DRAWINGS ALSO.
 2-TRUSS DRAWINGS:
 NOTE: CONTRACTOR CHANGED TRUSS CO.
 NOW, THERE ARE NEW COMMENTS FOR NEW
 ENGINEERED TRUSS PACKAGE.
 A)ENGINEER TO UPDATE ALL GENERAL TRUSS
 DRAWINGS TO REFLECT ACTUAL CODES:
 SBC 1997 FOR 110 MPH OR ASCE 7-95 FOR
 140 MPH WIND LOAD. REVISE AS REQUIRED.
 B)THERE ARE TWO DIFFERENT ENGINEERS
 SIGNING AND SEALING THESE DRAWINGS.
 FOLLOW THE REQUIREMENTS OF CHAPTER
 471 FOR A CHANGE OF ENGINEER.
 C)GENERAL TRUSS DRAWINGS ARE NOT LEGIBLE
 D)ENGINEERED TRUSSES ARE DESIGNED USING
 ASCE 7-98 FOR 110MPH. IF USING ASCE-98
 THEN, USE THE RIGHT WIND LOAD ZONE,
 WHICH IS 140MPH ZONE. REVISE AS REQ'D.
 E)CLARIFY WHAT IT MEANS ON ENGINEERED
 TRUSS DRAWINGS WHEN REFERING TO 15'
 ABOVE GROUND LEVEL. IS THIS THE MEAN
 ROOF HEIGHT? OR WALL HEIGHT?. SPECIFY
 AS REQUIRED AND REMEMBER THAT THIS
 BUILDING HAS AN SLOPED ROOF, NOT FLAT
 ROOF. REVISE AS REQUIRED.
 3-SEE PLANS FOR ADDITIONAL COMMENTS AND
 REVISE ORIGINAL PLANS TO AVOID DELAYS
 OR UNNECESSARY RETURNS FOR FUTURE
 SUBMITTALS.
  
  
  
 NOTE: THERE WILL BE A RESUBMITTAL FEE
 FOR TRUSS DRAWINGS. THEY HAVE BEEN
 REVIEWED/DENIED TWICE ALREADY.

Review Stop R ROOF PLAN REVIEW
Rev No 1 Status   Date 2001-12-01 Cont ID  
Sent By jgomez Date 2001-11-30 Time 18:09 Rev Time 2.00
Received By jgomez Date 2001-11-30 Time 18:09 Sent To  
Notes
2001-11-30 00:00:00APPROVED WITH PROVISO:
 1-REVISE THE ENERGY CALCULATIONS:
 -UNDER ATTIC AREA IS INCORRECT. SEE
 SECTION 604.1.A.1 OF FLORIDA ENERGY
 CODE FOR BUILDING CONSTRUCTION, 1997.
 2-PROVIDE CURRENT UL ASSEMBLY # FOR ONE
 HR FIRE RATED GLASS BLOCK ASSEMBLY.
 3-PROVIDE UPDATED PRODUCT APPROVAL FOR
 ENTRY DOORS.
 4-PROVIDE STRUCTURAL HANGING DETAIL FOR
 AHU. SPECIFY ALL CONNECTORS. SECTION
 104.2.2 OF CITY AMENDMENTS TO SBC 1997
 5-REVISE WINDOW SIZE FOR BEDROOM #3.
 24SH WINDOW DOESN'T MEET THE MINIMUM
 CLEAR HEIGHT OPENING OF 24".
 SECTION 1005.4 SBC 1997.
 6-SPECIFY SAFETY GLASS WHERE REQUIRED.
 SEE PLANS AND SEC. 2405.2 SBC 1997.
 7-TRUSS DRAWINGS:
 -UPDATE GENERAL TRUSS DETAILS. USE ASCE
 7-95 FOR 140MPH, NOT ASCE 7-93 FOR 110
 -REVIEW STAMP BY ENGINEER OF RECORD
 DOESN'T IDENTIFY FIRM WHO REVIEWED IT.
 8-SOIL TEST REPORT ENGINEER TO PROVIDE
 ORIGINAL SIGNATURE AS REQUIRED BY
 CHAPTER 471 OF FLORIDA STATUTES.
 9-SEE PLANS FOR ADDITIONAL COMMENTS.
 PLEASE BRING BACK REVIEWED SETS AFTER
 CORRECTIONS ARE DONE TO ORIGINAL DWGS
 IN ORDER TO EXPEDITE THE REVIEW.

Review Stop Z ZONING
Rev No 1 Status P Date 2001-11-02 Cont ID  
Sent By sgraham Date 2001-11-02 Time 11:17 Rev Time 0.25
Received By sgraham Date   Time   Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy