Plan Review Stops For Permit 01101288 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
29 |
Status |
P |
Date |
2004-03-30 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2004-03-30 |
Time |
10:30 |
Rev Time |
0.50 |
Received By |
shill |
Date |
2004-03-30 |
Time |
10:30 |
Sent To |
|
|
Notes |
2004-03-30 00:00:00 | IMPACT BARRIER DETAIL FOR P3 GLASS | | PREPARED BY HERBERT GOPMAN, PE |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
28 |
Status |
P |
Date |
2004-03-18 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2004-03-25 |
Time |
15:20 |
Rev Time |
0.50 |
Received By |
shill |
Date |
2004-03-18 |
Time |
10:11 |
Sent To |
P |
|
Notes |
2004-03-18 00:00:00 | REV 2.06, 3.03 DATED 3/15/04 |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
27 |
Status |
P |
Date |
2004-03-18 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2004-03-17 |
Time |
14:10 |
Rev Time |
5.00 |
Received By |
shill |
Date |
2004-03-16 |
Time |
16:36 |
Sent To |
|
|
Notes |
2004-03-18 00:00:00 | REVISIONS DATED 9/3/3 AND 3/9/4, #10 & | | #11 |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
26 |
Status |
P |
Date |
2004-03-16 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2004-03-16 |
Time |
15:40 |
Rev Time |
0.50 |
Received By |
shill |
Date |
2004-03-16 |
Time |
09:50 |
Sent To |
|
|
Notes |
2004-03-16 00:00:00 | INTERIOR DESIGN DRAWINGS | | PROVISO - IN ACCORDANCE WITH APPROVED | | PLAN AND SBC |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
25 |
Status |
P |
Date |
2004-03-04 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2004-03-16 |
Time |
09:19 |
Rev Time |
0.50 |
Received By |
shill |
Date |
2004-03-04 |
Time |
13:14 |
Sent To |
|
|
Notes |
2004-03-04 00:00:00 | LETTER DATED 3/2/04 PREPARED BY ALBERT | | SHUB, PE IN REGARDS TO ENERGY CALCS | | (INTERSTITIAL SPACE EXCEEDS | | REQUIREMENTS ON EN CALC SO REVISED | | CALCS ARE UNNECESSARY) |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
24 |
Status |
P |
Date |
2004-03-03 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2004-03-03 |
Time |
10:41 |
Rev Time |
2.00 |
Received By |
shill |
Date |
2004-03-03 |
Time |
10:41 |
Sent To |
|
|
Notes |
2004-03-03 00:00:00 | REVISED A2.11 AND 7.04 DATED 2/2/04 | | PROVISO - PROVIDE REVISED ENERGY CALCS |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
23 |
Status |
P |
Date |
2004-03-01 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2004-03-01 |
Time |
13:42 |
Rev Time |
1.00 |
Received By |
shill |
Date |
2004-03-01 |
Time |
13:42 |
Sent To |
|
|
Notes |
2004-03-01 00:00:00 | L2.02.,L4.01-4.04 | | SPRINKLER REVISION |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
22 |
Status |
P |
Date |
2004-02-18 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2004-02-20 |
Time |
16:05 |
Rev Time |
0.50 |
Received By |
shill |
Date |
2004-02-18 |
Time |
08:26 |
Sent To |
|
|
Notes |
2004-02-18 00:00:00 | FLOOR ELEVATIONS PREPARED BY CRAVEN- | | THOMPSON DATED 1/27/04 |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
21 |
Status |
F |
Date |
2004-02-11 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2004-02-11 |
Time |
17:41 |
Rev Time |
0.50 |
Received By |
shill |
Date |
2004-02-11 |
Time |
17:41 |
Sent To |
|
|
Notes |
2004-02-11 00:00:00 | ****CORRECTIONS**** | | | | TYPICAL WALL RAIL | | | | SAMANTHA HILL, BUILDING PLANS EXAMINER | | [email protected] | | | | 1.)PROVIDE THE CONNECTION DETAIL. | | | | 2.)PROVIDE CALCULATIONS TO COMPLY | | WITH FBC1608.2.1. | | | | 3.)SPECIFY THE MATERIAL; PROVIDE A | | DETAIL TO COMPLY WITH FBC1007.5.3. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
20 |
Status |
F |
Date |
2004-02-09 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2004-02-11 |
Time |
14:06 |
Rev Time |
1.00 |
Received By |
shill |
Date |
2004-02-09 |
Time |
14:29 |
Sent To |
|
|
Notes |
2004-02-09 00:00:00 | *****CORRECTIONS**** | | | | INTERIOR DESIGN DETAILS PREPARED BY | | INTERIORS BY STEVEN G. INC. | | | | SAMANTHA HILL, BUILDING PLANS EXAMINER | | 561-805-6724 | | | | SEE ATTACHED FAC61G1-16 IN REGARDS | | TO TITLE BLOCK, SEAL AND SIGNATURE. | | CORRECT AS NOTED AND RESUBMIT. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
19 |
Status |
P |
Date |
2004-02-04 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2004-02-04 |
Time |
13:20 |
Rev Time |
0.50 |
Received By |
shill |
Date |
2004-02-04 |
Time |
13:20 |
Sent To |
|
|
Notes |
2004-02-04 00:00:00 | ROOF WIND PRESSURE AND ATTACHMENT | | DESIGN SUBMITTAL PREPARED BY HERBERT | | GOPMAN, PE AND ATLANTIC & CARIBBEAN | | ROOF CONSULTING LLC 1/19/04 |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
18 |
Status |
F |
Date |
2004-01-27 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2004-01-28 |
Time |
16:09 |
Rev Time |
0.00 |
Received By |
hpiskura |
Date |
|
Time |
|
Sent To |
|
|
Notes |
2004-01-27 00:00:00 | REVISIONS SHOWN AS #10 HAVING VARYING | | DATES. | | | | SHEET A 7.06 SPEAKS TO "NON-COMBUSTIBLE | | FOAM" WHICH HAS NOT BEEN ESTABLISHED TO | | DATE.THIS STATEMENT SHOULD BE REMOVED | | FROM THE PLANS SINCE THE PRODUCTS | | INSTALLED ON THE BUILDING TO DATE ARE | | NOT NON-COMBUSTIBLE AS DEFINED IN THE | | 1997 STANDARD BUILDING CODE OR THE 2001 | | FLORIDA BUILDING CODE. | | | | THE REQUESTED DOCUMENTS FOR THE | | ATTACHMENT METHODS USED FOR THE FOAM | | TRIM DEMONSTRATING WIND LOAD COMPLIANCE | | HAVE NOT BEEN PROVIDED.A COPY OF THE | | 11/06/03 REVIEW NOTES ARE ATTACHED. | | | | THE FIRE SPRINKLER PLANS DONOT CLEARLY | | REFLECT THE APPLICATION OF THE | | SPECIALTY FIRE SPRINKLER HEADS THAT | | WILL PROVIDE THE TWO HOUR FIRE RATING | | REQUIRED IN THE VARIANCE GRANTED BY THE | | BOARD OF ADJUSTMENTS. | | | | NO HEADS ARE SHOWN AT THE FIXED WINDOWS | | IN THE GUEST ROOMS. | | | | HEADS ARE SHOWN ON THE EXTERIOR SIDE OF | | THE BALCONY DOORS, BUT NOT AT THE | | INTERIOR SIDE. | | | | PLEASE REVISE AS NECESSARY. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
17 |
Status |
P |
Date |
2004-01-14 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2004-01-14 |
Time |
09:30 |
Rev Time |
0.50 |
Received By |
shill |
Date |
2004-01-14 |
Time |
09:30 |
Sent To |
|
|
Notes |
2004-01-14 00:00:00 | STOREFRONT CALCS PREPARED BY ERIC | | VANHORN PE DATED 11/6/03 |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
16 |
Status |
P |
Date |
2004-01-14 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2004-01-14 |
Time |
09:20 |
Rev Time |
0.50 |
Received By |
shill |
Date |
2004-01-14 |
Time |
09:20 |
Sent To |
|
|
Notes |
2004-01-14 00:00:00 | ROOF SCUTTLE SHOP DRAWINGS PREPARED BY | | BILCO |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
15 |
Status |
P |
Date |
2004-01-12 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2004-01-12 |
Time |
15:24 |
Rev Time |
0.50 |
Received By |
shill |
Date |
2004-01-12 |
Time |
15:24 |
Sent To |
|
|
Notes |
2004-01-12 00:00:00 | FRAMING FOR PRE-CAST HEADER, EAST | | ENTRANCE PREPARED BY KELAHER PE |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
14 |
Status |
P |
Date |
2004-01-12 |
|
|
Cont ID |
|
Sent By |
shill |
Date |
2004-01-12 |
Time |
14:56 |
Rev Time |
0.50 |
Received By |
shill |
Date |
2004-01-12 |
Time |
14:56 |
Sent To |
|
|
Notes |
2004-01-12 00:00:00 | ELEVATOR HOIST BEAM SUBMITTAL PREPARED | | BY DIXIE METAL PRODUCTS DATED 11/12/03. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
13 |
Status |
F |
Date |
2003-11-06 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2004-01-05 |
Time |
08:57 |
Rev Time |
0.00 |
Received By |
hpiskura |
Date |
|
Time |
|
Sent To |
|
|
Notes |
2003-11-06 00:00:00 | UNIVERSAL FOAM INC. LETTER DATED | | 10/10/03. | | | | PLEASE PROVIDE AN ENGINEERING | | INVESTIGATION THAT THE ATTACHMENT | | METHODS RECOMMENDED IN THE LETTER WILL | | RESIST WIND AND ANY OTHER FORCES | | IMPOSED UPON THE TRIM THAT MAY OCCUR IN | | THE END APPLICATION OF THE PRODUCT. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
12 |
Status |
P |
Date |
2003-11-04 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2003-11-05 |
Time |
15:27 |
Rev Time |
0.00 |
Received By |
hpiskura |
Date |
|
Time |
|
Sent To |
|
|
Notes |
2003-11-04 00:00:00 | REVISION #10 |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
11 |
Status |
P |
Date |
2003-08-08 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2003-10-28 |
Time |
08:37 |
Rev Time |
0.00 |
Received By |
hpiskura |
Date |
2003-08-08 |
Time |
13:56 |
Sent To |
Z |
|
Notes |
2003-08-08 00:00:00 | REVISONS 6,7,8,9 A SHEETS AND FP SHEETS. | | REVISONS 6,7,8&9 A SHEETS AND FP SHEETS |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
10 |
Status |
F |
Date |
2003-07-21 |
|
|
Cont ID |
|
Sent By |
hpiskura |
Date |
2003-07-21 |
Time |
08:23 |
Rev Time |
0.00 |
Received By |
hpiskura |
Date |
2003-07-21 |
Time |
08:23 |
Sent To |
|
|
Notes |
2003-07-21 00:00:00 | SUFFOLK TRANSMITTAL #01360 RE: ADVANCED | | ROOFING, INC. | | | | A SEPARATE PERMIT FOR ROOFING IS | | REQUIRED WHEN THE COMPLETE INFORMATION | | IS NOT PROVIDED WITH THE ORIGINAL PRIME | | BUILDING PERMIT. | | | | THE BILCO TYPE S ROOF SCUTTLE INCLUDED | | IN THAT PACKAGE HAS A SPECIFICATION OF | | 20 PSF UPLIFT WHICH IS INADEQUATE FOR | | THIS BUILDING HEIGHT.PLEASE REVISE | | AS NECESSARY AND INCLUDE TEST AND/OR | | PRODUCT ACCEPTANCE REPORTS FOR THE ROOF | | SCUTTLE. | | | | CC: DON NEELY |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
9 |
Status |
N |
Date |
2003-06-04 |
|
|
Cont ID |
|
Sent By |
shernand |
Date |
2003-07-11 |
Time |
11:18 |
Rev Time |
0.00 |
Received By |
shernand |
Date |
2003-06-04 |
Time |
15:48 |
Sent To |
|
|
Notes |
2003-06-04 00:00:00 | SUBMITTAL OF 5/7/03 OK PER HP FOR | | WATERPROOFING SUBMITTAL AND ALUMINUM | | RAILS. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
8 |
Status |
F |
Date |
2003-05-06 |
|
|
Cont ID |
|
Sent By |
hpiskura |
Date |
2003-05-06 |
Time |
08:53 |
Rev Time |
0.00 |
Received By |
hpiskura |
Date |
2003-05-06 |
Time |
08:53 |
Sent To |
|
|
Notes |
2003-05-06 00:00:00 | DIXIE METAL PRODUCTS DRAWINGS DATED | | 10/23/02. | | | | THE PROPOSED TREAD WIDTH FOR THE | | ALUMINUM STAIR SHOWN ON SHEET 13 DOES | | NOT COMPLY WITH FBC 1007.3, #3. | | | | SHEET 16 | | THE SPACING OF THE HANDRAILS DOES NOT | | APPEAR TO COMPLY WITH FBC 1007.5.7 |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
7 |
Status |
C |
Date |
2003-04-04 |
|
|
Cont ID |
|
Sent By |
shernand |
Date |
2003-05-05 |
Time |
11:35 |
Rev Time |
0.00 |
Received By |
hpiskura |
Date |
2003-04-04 |
Time |
11:27 |
Sent To |
|
|
Notes |
2003-04-04 00:00:00 | ARCHITECTURAL REVISIONS 6,7 & 8. | | SHEET A2.05 WHAT WILL THE NEWLY DEMISED | | AREA ADJACENT TO THE EXPANDED PUMP ROOM | | BE USED FOR? | | | | THE CITY PERMIT SET DOES NOT HAVE | | REVISON #5 ON MANY OF THE SHEETS.WHAT | | TOOK PLACE? | | | | STRUCTURAL PAGES IN THE CITY PERMIT SET | | GO TO REVISION #2 DATED 1/15/02, THIS | | SUBMITTAL HAS SEVEN.PLEASE PROVIDE A | | BRIEF NARRATIVE OF THE CHANGES THAT | | OCCURED SUBSEQUENT TO PERMIT ISSUED | | IN 8/02. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
6 |
Status |
F |
Date |
2003-02-21 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2003-03-25 |
Time |
09:49 |
Rev Time |
0.00 |
Received By |
hpiskura |
Date |
2003-02-21 |
Time |
10:48 |
Sent To |
|
|
Notes |
2003-02-21 00:00:00 | REVISONS SUBMITTED AS SHOP DRAWINGS WITH | | JOSE SUAREZ, ARCHITECT COVER LETTER | | DATED 2/14/03 | | | | THE ARCHITECT REQUESTS THAT POLYSTYRENE | | FOAM PRODUCTS BE SUBSTITUTED FOR THE | | PRECAST CONCRETE TRIM THAT WAS APPROVED | | ON THE PERMIT PLANS.THIS TRIM IS TO | | BE APPLIED TO THE EXTERIOR WALLS OF THE | | BUILDING. | | | | THE ARCHITECT CITES SBC 803.2 AS A BASIS | | FOR COMPLIANCE.THIS IS WITHOUT | | STANDING SINCE 803.2 IS FOR INTERIOR | | FINISHES. THE FIRE TEST METHOD OF E-84 | | CITED IN 803.2 IS NOT USED TO DEFINE | | NON-COMBUSTIBLE, ASTM E 136 IS. | | | | SBC 202, AS WELL AS THE CURRENT FBC | | CLEARLY DEFINE NON-COMBUSTIBLE.ONE IS | | CAUTIONED THAT THE SECOND PART OF THAT | | DEFINITION CITES E 84 FOR SURFICIAL | | COATINGS NOT MORE THAN 1/8" THICK, WHEN | | APPLIED TO A STRUCTURAL BASE MEETING E | | 136. | | | | IN THE CASE OF THE UNIVERSAL FOAM | | PRODUCT PROVIDED, THE POLYSTYRENE FOAM | | MUST MEET E 136 AND THE POLYURETHANE | | COATING ON THAT FOAM OF 1/8" THICKNESS | | OR LESS, NEED MEET ONLY E 84 | | REQUIREMENTS. | | | | THE APPLICABLE CODE SECTION IS SBC 1404 | | AND THE CITY'S AMENDMENT TO THE SBC | | INVOKING APPENDIX F, FIRE DISTRICT | | REQUIREMENTS.BRIEFLY, THESE CODE | | SECTIONS REQUIRE EXTERIOR TRIM TO BE | | NON-COMBUSTIBLE OR OF FIRE RETARDANT | | TREATED LUMBER.THE FAVORED NATURE AND | | CHARACTERISTICS OF FIRE RETARDANT | | TREATED LUMBER UNDER FIRE CONDITIONS, | | DEMONSTRATED BY TESTING, FAR EXCEED | | THOSE EXHIBITED BY THE FOAM PRODUCT | | THAT IS REQUESTED AS A SUBSTITUTION. | | | | SEVERAL OF THE TEST REPORTS PROVIDED | | SAY THE MATERIAL MELTED AND FELL TO | | THE FLOOR OF THE TEST CHAMBER AND | | BURNED BEFORE THE CONCLUSION OF THE | | REQUIRED TEST PERIOD.THE EVALUATION | | REPORTS REFERENCED, SOME OF WHICH ARE | | OBSOLETE, ARE FOR TESTS USING SPECIFIC | | THICKNESSES, SYSTEMS AND UNIQUE | | ASSEMBLAGES. | | | | USING PRUDENCE AND CODE EXPERIENCE, | | TOGETHER WITH THE INFORMATION PROVIDED | | THUS FAR,IT CANNOT BE REASONED THAT | | THIS IS AN EQUAL AND ALTERNATE MATERIAL | | FOR THE PURPOSE INTENDED, AND BE | | SUBSTITUTED FOR NON-COMBUSTIBLE | | MATERIAL AS SUCH. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
5 |
Status |
F |
Date |
2002-10-07 |
|
|
Cont ID |
|
Sent By |
btrobaug |
Date |
2002-12-05 |
Time |
16:22 |
Rev Time |
0.00 |
Received By |
hpiskura |
Date |
|
Time |
|
Sent To |
|
|
Notes |
2002-10-07 00:00:00 | SUFFOLK SUBMITTAL #00459 RE: MASONRY | | PRODUCTS. | | | | THE CSR RINKER LETTERS CITE COMPLIANCE | | WITH THE S. FLORIDA BUILDING CODE.THE | | DESIGN MUST COMPLY WITH SBCCI 1997, THE | | CODE UNDER WHICH THE BUILDING WAS | | PERMITTED.PLEASE PROVIDE WRITTEN | | ASSURANCE OF COMPLIANCE WITH THE DESIGN | | STANDARDS CONTAINED IN SBCCI 1997 OR | | FBC 2001. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
4 |
Status |
P |
Date |
2002-08-02 |
|
|
Cont ID |
|
Sent By |
hpiskura |
Date |
2002-08-02 |
Time |
15:18 |
Rev Time |
0.00 |
Received By |
hpiskura |
Date |
|
Time |
|
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
3 |
Status |
F |
Date |
2002-07-25 |
|
|
Cont ID |
|
Sent By |
hpiskura |
Date |
2002-07-25 |
Time |
10:49 |
Rev Time |
0.00 |
Received By |
hpiskura |
Date |
|
Time |
|
Sent To |
|
|
Notes |
2002-07-25 00:00:00 | THIS IS THE THIRD REQUEST FOR ATTACHMENT | | DETAILS FOR THE CAST STONE TO BE | | APPLIED TO THE BUILDING.THE ARCHITECT | | HAS REPRODUCED CODE TEXT ON SHEET A4.02 | | (SBC 1403.2.6)THIS IS NOT SPECIFIC | | DESIGN INFORMATION.SEE SBC 104.2.1 | | REGARDING THE PROHIBITION OF CITING THE | | CODE IN LIEU OF SPECIFIC DESIGN | | INFORMATION.THIS CAVEAT WAS NOTED ON | | PREVIOUS APPLICATION REJECTIONS ALSO. | | | | THIS IS THE THIRD REQUEST FOR | | INFORMATION ON THE SPRINKLER HEADS THAT | | WILL PROVIDE EQUIVALENT PROTECTION FOR | | FIRE RATED OPENING PROTECTIVES. | | | | SHEET SP8, PREPARED BY ALBERT SHUB, PE | | SHOWS A "WS VERTICAL CENTRAL" HEAD AT | | "EXTERIOR WALL & INTERIOR OF FIXED | | GLASS" AND "AT EXTERIOR WALL & INTERIOR | | OF SLIDING GLASS DOORS". | | | | THERE IS NOTHING MORE ON THE FIRE | | PROTECTION SYSTEM ENGINEERING DOCUMENTS | | THAT ADDRESSES THIS SPECIAL APPLICATION | | WINDOW SPRINKLER. | | | | THE CENTRAL, WS, 3-01, MODEL WS SPECIFIC | | APPLICATION WINDOW SPRINKLERS TYCO FIRE | | PRODUCTS, TECHNICAL DATA SHEET #6-2.0 | | PRINTED 3/01 CONTAINS THE FOLLOWING | | INFORMATION. | | | | UNDER GENERAL DESCRIPTION IT STATES THAT | | THE WS HEAD CAN BE USED AS INTERIOR | | PROTECTION OF GLAZING.IT GOES ON TO | | ALLOW THE USE OF THE HEAD AS AN "OPEN" | | SPRINKLER FOR EXTERIOR APPLICATIONS, | | AND USING THE DESIGN REQUIREMENTS OF | | NFPA.THE ENGINEERED DESIGN DOCUMENTS | | DO NOT ADDRESS THIS. | | | | UNDER "WARNING" IN THE SAME CENTRAL TECH | | DATA IT SAYS THE HEAD MUST BE INSTALLED | | & MAINTAINED ISN COMPLIANCE WITH THE | | DATA SHEET, NFPA, AND ANY OTHER | | APPLICABLE STANDARDS.CHAPTER 4-7, | | NFPA13-99 OUTSIDE SPRINKLERS, SOME OF | | THE CRITERIA IS FOR AN INDEPENDENT | | CONTROL VALVE, CORROSION RESISTANCE AND | | A PRESSURE GAUGE.THESE ARE NOT | | INDICATED ON THE ENGINEERED DESIGN | | DOCUMENTS. | | | | THE CENTRAL WS TECH DATA UNDER "DESIGN | | CRITERIA" DECLARES THE HEADS TO BE OPEN | | SPRINKLERS FOR OUTSIDE USE. | | | | SAME CENTRAL WS TECH DATA SHEET UNDER | | "AREA OF USE" IT STATES THAT THE WS MAY | | BE USED TO PROTECT NON-OPERABLE WINDOWS. | | THE ENGINEERED DESIGN DOCUMENTS PROPOSE | | THE USE OF THE HEADS ON SLIDING GLASS | | DOORS, (OPERABLE), FOR INTERIOR AND | | EXTERIOR. | | | | SAME CENTRAL DATA SHEET UNDER "MINIMUM | | CLEARANCE FROM FACE OF GLASS TO | | COMBUSTIBLE MATERIALS" FOR THE USE OF A | | 36" PONY WALL OR SIMILAR METHOD. | | NOTHING SHOWN ON THE ENGINEERED DESIGN | | DOCUMENTS. | | | | SAME CENTRAL DATA SHEET UNDER | | RECOMMENDED HYDRAULIC REQUIREMENTS IS A | | SPECIFIC FORMULA THAT PROVIDES FOR AN | | INCREASED HYDRAULIC DEMAND TO BE | | ADDITIVE TO THE MOST DEMANDING | | HYDRAULIC DESIGN AREA.FURTHER THE | | OPEN EXTERIOR HEADS ARE CALCULATED AS A | | A DELUGE SYSTEM IN ACCORDANCE WITH NFPA. | | | | NER-516, NATIONAL EVALUATION REPORT FOR | | THIS PARTICULAR SPRINKLER HEAD, (A | | RECOGNIZED LISTING AGENCY) WAS SHARED | | WITH THE BUILDING DESIGNERS IN A | | MEETING PRIOR TO THE PREPARATION OF | | THESE DRAWINGS.THAT REPORT INVOKES | | THE CENTRAL DATA SHEET REFERENCED ABOVE. | | | | | | RULE 61G15-32.003 (4) COMMON | | REQUIREMENTS TO ALL FIRE PROTECTION | | ENGINEERING | | DOCUMENTS. OF THE FLORIDA ADOMINSTRATIVE | | CODE READS IN PART:WHEN CODES AND | | STANDARDS ARE NOT AVAILABLE OR | | APPLICABLE, AND SAID LAYOUT DOCUMENTS | | ARE TO BE BASED ON ENGINEERING | | JUDGMENT, ANY REASONS AND ASSUMPTIONS | | MADE TO DEVELOP THE FIRE PROTECTION | | CONCEPT SHALL BE IDENTIFIED ON THE FIRE | | PROTECTION SYSTEM ENGINEERING | | DOCUMENTS. | | | | THE REASONS AND ASSUMPTIONS FOR THE | | DIVERSION FROM THE LISTING OF THE | | SPRINKLER ARE NOT READILY APPARENT ON | | THE FIRE PROTECTION SYSTEM ENGINEERING | | DOCUMENTS. | | | | THIS IS THE THIRD REQUEST FOR | | CALCULATIONS TO SUPPORT THE DESIGN OF | | THE PRESSURIZED STAIRS.A PARTIAL | | STATEMENT APPEARS ON SHEET AC 10 | | CONTAINS THE STATEMENT "STAIR SHALL BE | | PRESSURIZED TO 0.05" W.G. RELATIVE TO | | ATMOSPHERE, INCLUDING ANY STACK EFFECT | | FOR THE REST OF THE BUILDING." | | | | THIS STATEMENT IS SUGGESTIVE OF SBC 412. | | 11 (5) BUT DOES NOT ACCOMPLISH A | | DEMONSTRATION OF HOW THE DESIGN WAS | | ARRIVED AT. PLEASE PROVIDE CALCULATIONS | | DEMOSTRATING COMPLIANCE WITH SBC 412.11 | | (5) | | | | THE AC PLANS INDICATE FIRE DAMPERS FOR | | THE MISCELLANEOUS EQUIPMENT PENETRATING | | THE FIRE RATED WALL ON THE SOUTH SIDE | | OF THE BUILDING.SBC 705.1.3.1 | | REQUIRESLISTED DEVICES TO BE TESTED IN | | ACCORDANCE WITH NFPA 80 AND FIRE | | DAMPERS ARE TESTED TO UL 555, PLEASE | | ENSURE WITH NOTES, SPECIFICATIONS OR | | DETAILS THAT SBC 705.1.3.1 WILL BE | | COMPLIED WITH FOR ALL PENETRATIONS | | WHERE APPLICABLE. | | | | FL STATUTE 553.8(2)(B) MANDATES THE | | IMPOSITION OF A FEE FOR PLANS THAT ARE | | REJECTED THREE OR MORE TIMES FOR THE | | SAME CODE VIOLATION.A PRINTED COPY IS | | ATTACHED FOR USE. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
F |
Date |
2002-04-15 |
|
|
Cont ID |
|
Sent By |
hpiskura |
Date |
2002-04-15 |
Time |
07:29 |
Rev Time |
0.00 |
Received By |
hpiskura |
Date |
|
Time |
|
Sent To |
|
|
Notes |
2002-04-15 00:00:00 | AS NOTED ON THE 11/16/02 LIST OF CODE | | COMMENTS, THE FLORIDA ACCESSIBILITY | | CODE FOR BUILDING CONSTRUCTION, SECTION | | 4.1.2 (5) REQUIRES SIX ACCESSIBLE | | SPACES, SECTION 4.6.3 OF THE FACBC | | REQUIRES | | THEM TO BE TWELVE FEET WIDE WITH AN | | ADJACENT FIVE FEET WIDE AISLE. PLEASE | | REVISE AS NECESSARY. | | | | THE DOOR SCHEDULES DO NOT SHOW THE RATED | | DOORS FOR THE ELEVATOR LOBBIES AS | | REQUIRED BY SBC 412.6.1.(20 MINUTES) | | | | THE 4TH LEVEL FLOOR PLAN ON SHEET A2.06, | | SHADED HATCHED AREA INDICATES A STEP AT | | THE DOOR FROM ELEVATOR LOBBY #1 TO THE | | SPA AREA.THIS IS PROHIBITED BY SBC | | 1012.1.3. | | | | SHEET A4.02 IS STILL MISSING | | INFORMATION FOR THE ATTACHMENT OF THE | | PRECAST CONCRETE.SEE SBC 1403.2. | | | | THE PLANS DEPICT THE USE OF"EIFS" TRIM | | IN VARIOUS PLACES.SBC F102.2.7 | | REQUIRES ARCHITECTURAL TRIM TO BE OF | | NON-COMBUSTIBLE OR FIRE RETARDANT | | TREATED WOOD. | | EIFS MEETS NEITHER OF THESE DESCRIPTIONS | | | | SHEET S19 INDICATES A COMBINATION OF | | WIND TUNNEL TESTING AND THE ANALYTICAL | | PROCEDURE.ASCE 7-95 SECTION 6.4.1.1 | | REQUIRES THATONLY ONE OF THE | | PROCEDURES BE USED. | | | | SHEET A6.01 SHOWS ROOF MOUNTED STAIR | | PRESSURIZATION FAN.AC-1 SHOWS A SUPPLY | | FAN AT THE LOBBY LEVEL.AC-6 SHOWS A | | 4650 CFM SUPPLYDUCT AND A 2500 CFM | | EXHAUST DUCT.PROVIDE CALCULATIONS AND | | A NARRATIVE DESCRIBING THE SEQUENCE OF | | OPERATION TO DEMONSTRATE COMPLIANCE WITH | | SBC 412.11 (5) AS PREVIOUSLY REQUESTED. | | | | PLEASE PROVIDE THE DATA FOR THE | | SPRINKLER HEADS THAT WILL PROVIDE AN | | "EQUIVALENT ALTERNATE" FOR FIRE RATED | | OPENING PROTECTIVES.SECTION 553.79 OF | | THE FLORIDA STATUTES REQUIRES THE FIRE | | PROTECTION INFORMATION TO BE ON THE | | PERMIT PLANS AS WELL AS SBC 104.2 AND | | NFPA 13 CHAPTER 6, (OR 8 IN THE 1999 | | EDITION) |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2001-11-16 |
|
|
Cont ID |
|
Sent By |
hpiskura |
Date |
2001-11-16 |
Time |
09:07 |
Rev Time |
0.00 |
Received By |
hpiskura |
Date |
2001-11-13 |
Time |
16:00 |
Sent To |
|
|
Notes |
2001-11-16 00:00:00 | THE SHEET TITLED TABULAR DATA NOTES 3 | | HANDICAP PARKING SPACES USING THE | | FORMULA OF 2% OF THE TOTAL.THAT IS | | INCORRECT.THE FACBC 4.1.2 (5) | | REQUIRES A MINIMUM OF 5 SPACES FOR | | PARKING LOTS HAVING 101 TO 150 TOTAL | | SPACES. | | | | SHOW THE VAN ACCESSIBLE SPACE REQUIRED | | BY FACBC 4.1.2 (5) (B). | | | | SHEET A2.01 SHOWS THE HC SPACES PROPOSED | | TO BE 8'-8" WIDE.THE FACBC 4.6.3 | | MANDATES 12' WIDE PARKING SPACES. | | PLEASE REVISE AS NECESSARY.SEE ALSO 4. | | 6.5 FOR VERTICAL CLEARANCES. | | | | SHEET A2.01EGRESS FROM THE PARKING | | SPACES ON THE WEST SIDE RAMP DOES NOT | | COMPLY WITH SBC 1004.1.3, COMMON PATH | | OFTRAVEL TO AND EXIT MUST BE 75' OR | | LESS.THE ROLL DOWN DOOR DOES NOT | | COMPLY WITHSBC 1012.1 AND THEREFORE IS | | NOT AN EXIT. REVISE AS NECESSARY. | | | | SHEET A2.02. HANDRAILS ARE REQUIRED ON | | THE RAMP IN STAIR #1.SEE SBC 1013.6. | | | | SHEET A2.01.SBC 412.6.1 REQUIRES | | ELEVATOR LOBBIES FOR ALL ELEVATORS ON | | ALL FLOORS W/ CERTAIN EXCEPTIONS.THE | | GARAGE LEVELS, THE 4TH LEVEL SPA DECK | | ELEVATOR #1 AND THE SERVICE ELEVATOR | | WEST SIDE ON FLOORS 5 THROUGH 15 DO NOT | | QUALIFY FOR THE EXCEPTION.REVISE AS | | NECESSARY. | | | | THE INDIVIDUAL APARTMENTS MUST COMPLY | | WITH SBC 412.6.2, ACCESS TO AN EXIT | | WITHOUT TRAVEL THROUGH AN ELEVATOR | | LOBBY. | | | | STAIRS #1 AND #2 DO NOT MEET THE 1/2 | | DIAGONAL DISTANCE SEPARATION | | REQUIREMENT OF SBC 1004.1.4. ON ALL | | FLOORS WITH THE EXCEPTION OF THE | | SUBTERRANEAN LEVEL.PLEASE REVISE AS | | NECESSARY. | | | | SHEET A6.02 NOTES, CALLS FOR THE STAIRS | | TO COMPLY WITH THE SFBC.PLEASE REVISE | | TO INCLUDE AND ENSURE COMPLIANCE WITH | | THE 1997 SBC. | | | | SHEET A3.07 DOOR NOTES #3. UNDERCUTTING | | OF FIRE RATED DOORS MUST BE IN | | ACCORDANCE WITH NFPA 80. | | | | SHOW A SPECIFIC CONNECTION DETAIL FOR | | THE PRECAST STONE DEPICTED ON SHEET | | 4.02 AND ELSEWHERE.IF THE DESIGN IS | | DELEGATED TO A SPECIALTY ENGINEER | | INDICATE THE LOCATION, NATURE, | | MAGNITUDE AND DIRECTION OF THE FORCES | | TO BE RESISTED.SEE SBC 104.2. | | | | THE EIFS SHOWN IN DETAIL #50, SHEET | | A7.05 MUST COMPLY WITH SBC 1404.3 | | AND SBC APPENDIX F102.7.REVISE AS | | NECESSARY. | | | | SHEET A705 DETAIL 53.WHAT IS THE | | PARAPET HEIGHT THAT SERVES AS A | | GUARDRAIL?THE REFERENCE TO THE | | LANDSCAPE PAGES IS NOT CLEAR.SEE SBC | | 1015. | | | | SHEET A6.05.PROVIDE CALCULATIONS FOR | | THE GUARDRAIL AT THE WINDOW | | DEMONSTRATING COMPLIANCE WITH SBC | | 1608.2.3. | | | | GIVEN THE CITY'S REQUIREMENT FOR | | HURRICANE MISSILE IMPACT GLAZING, HOW | | WILL COMPLIANCE WITH SBC 1405 BE | | ACCOMPLISHED?PARTICULARLY, BUT NOT | | LIMITED TO, GARAGE | | LEVELS 2 AND 3. | | | | SHEET S18 CITES THE SFBC FOR DESIGN OF | | RAILS.DESIGN MUST BE TO SBC 1997 WITH | | SPECIFIC DESIGN CRITERIA AND NOT A CODE | | SECTION.SEE SBC 104.2.1. | | | | SHEET S19 STRUCTURAL LOADS, DECLARES | | THAT THAT STRUCTURAL ANALYSIS IS PER | | ASCE 7-95 AND THAT COMPONENTS AND | | CLADDING IS BY WIND TUNNEL TESTING. | | ASCE 7-95 6.4.1.1 PROHIBITS THE MIXING | | OF THE METHODS ANALYSIS.IT APPEARS | | THAT THIS SITE IS SUBJECT TO UPWIND | | OBSTRUCTIONS, CHANNELING, BUFFETING, | | ETC. AS DESCRIBED IN SECTION 6.4.2.1 | | LIMITATIONS OF ANALYTICAL PROCEDURE, | | THAT A COMPLETE WIND TUNNEL | | INVESTIGATION IS IN ORDER. | | | | SHOW THE DESIGN LOADS FOR THE WALKS | | ALONG THE ARC FORMED ON GRID LINE 4, | | SUBTENDED BY GRID LINE B, IN ACCORDANCE | | WITH SBC 1604.9. | | | | PROVIDE A NARRATIVE FOR THE METHODS OF | | TESTING REQUIRED BY SBC 412.1.2 FOR | | SMOKE REMOVAL AND STAIR PRESSURIZATION | | ON THE STANDBY POWER SYSTEM. | | | | SHEET E10 FIRE ALARM, DOES NOT SHOW THE | | APARTMENT UNIT SMOKE DETECTORS LINKED | | INTO THE SYSTEM AS PROVIDED FOR IN SBC | | 412.2.2 AND SBC 412.2.1 (5). | | | | PLEASE PROVIDE CALCULATIONS | | DEMONSTRATING COMPLIANCE WITH SBC | | 412.11 (5) IF THAT IS THE INTENDED | | OPTION OR COMPLY WITH SBC 1005.6. | | | | THE CONSTRUCTION BOARD OF ADJUSTMENTS | | AND APPEALS GRANTED TWO VARIANCES AT | | THEIR MAY 10, 2001 MEETING.ONE OF THE | | STIPULATIONS OF THE BOARD WAS THAT "THE | | SPRINKLER HEADS MEET THE RATING | | REQUIREMENTS"AND BE OF AN "EQUIVALENT | | ALTERNATE" PLEASE PROVIDE | | TESTING | | FROM A RECOGNIZED SOURCE THAT | | DEMONSTRATES COMPLIANCE WITH SBC | | 705.1.3 (NFPA 80) FOR THE SPRINKLERS. | | | | PROVIDE CALCULATIONS DEMONSTRATING | | COMPLIANCE WITH 411.4.2 FOR THE SIX AIR | | CHANGES PER HOUR IN THE GARAGE. | | | | THE SP DRAWINGS SHOW A RISER/STANDPIPE | | IN A STAIR #3.WHAT IS THE INTENT OF | | THIS? |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
16 |
Status |
P |
Date |
2004-03-05 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2004-03-05 |
Time |
16:55 |
Rev Time |
1.00 |
Received By |
dpalmer |
Date |
2004-03-05 |
Time |
16:55 |
Sent To |
|
|
Notes |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
15 |
Status |
P |
Date |
2004-01-08 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2004-01-08 |
Time |
16:44 |
Rev Time |
1.50 |
Received By |
dpalmer |
Date |
2004-01-08 |
Time |
07:31 |
Sent To |
|
|
Notes |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
14 |
Status |
P |
Date |
2003-11-03 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2003-11-03 |
Time |
08:05 |
Rev Time |
0.50 |
Received By |
dpalmer |
Date |
2003-11-03 |
Time |
08:05 |
Sent To |
|
|
Notes |
2003-11-03 00:00:00 | REV FOR 7C7 AND 7E8 |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
13 |
Status |
P |
Date |
2003-10-21 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2003-10-21 |
Time |
06:41 |
Rev Time |
1.75 |
Received By |
dpalmer |
Date |
2003-10-21 |
Time |
06:14 |
Sent To |
|
|
Notes |
2003-10-21 00:00:00 | *** NOTEREDLINED **** | | | | *** TYPICAL** | | | | WATER HEATER MAY REQUIRE DISC. | | "LOCK OFF" DEVICE TO BE APPROVED BY AHJ. |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
12 |
Status |
F |
Date |
2003-08-21 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2003-08-21 |
Time |
07:22 |
Rev Time |
0.50 |
Received By |
dpalmer |
Date |
2003-08-21 |
Time |
07:22 |
Sent To |
|
|
Notes |
2003-08-21 00:00:00 | **************** UNSAT ************ | | | | 1)NOTE: PLEASE SUBMIT ALL REVISIONS FOR | | LIGHTNING PROTECTION SYSTEM UNDER THAT | | PERMIT. (#02121457) | | | | 2)NOTE: PLEASE PROVIDE A COPY OF THE | | CONTRACT FOR COMPLETE LIGHTNING PROTECT- | | -ION SYSTEM. ORIG VALUE WAS ISSUED AT | | $8800.??? | | PLEASE NOTE, THIS IS TO INCLUDE ALL | | LABOR AND MATERIALS.104.6.5 FBC/FAC/CITY | | ADMIN CODE. ETC. | | | | PLEASE NOTE, PATRICK POWER IS CONT WHO | | PULLED ORIG PERMIT. | | | | PLEASE ALSO NOTE, PERMIT FOR LIGHTNING | | PROTECTION HAS BEEN PUT ON HOLD UNTIL | | COMMENTS ARE ADDRESSED. | | | | PLEASE PROVIDE SUBMITTALS/ SPECS FOR | | EQUIPMENT SHOWN AND BEING INSTALLED. | | ALL EQUIPMENT MUST BE LISTED. | | | | PLEASE SUBMIT THE ABOVE INFORMATION FOR | | REVIEW. IF THERE ARE ANY QUESTIONS, | | PLEASE CALL. | | | | DEWEY PALMER | | ELECTRICAL PLAN REVIEW | | 561-805-6717 | | [email protected] |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
11 |
Status |
P |
Date |
2003-07-31 |
|
|
Cont ID |
|
Sent By |
alange |
Date |
2003-08-08 |
Time |
16:12 |
Rev Time |
1.50 |
Received By |
dpalmer |
Date |
2003-07-31 |
Time |
08:42 |
Sent To |
|
|
Notes |
2003-07-31 00:00:00 | ELEC REVISIONS |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
10 |
Status |
P |
Date |
2003-07-18 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2003-07-18 |
Time |
15:02 |
Rev Time |
2.00 |
Received By |
dpalmer |
Date |
2003-07-18 |
Time |
15:02 |
Sent To |
|
|
Notes |
2003-07-18 00:00:00 | LIGHTING SUBMITTALS ONLY. |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
9 |
Status |
F |
Date |
2003-04-08 |
|
|
Cont ID |
|
Sent By |
shernand |
Date |
2003-06-20 |
Time |
11:57 |
Rev Time |
6.00 |
Received By |
dpalmer |
Date |
2003-04-08 |
Time |
07:20 |
Sent To |
|
|
Notes |
2003-04-08 00:00:00 | ******** ******* UNSAT ************* | | | | 1)NOTE: PLEASE SEE A-SHEETS NOT ORIG | | SIGNATURE ON PLANS UNDER FS/ FAC | | 481.221. | | PLEASE ALSO SEE SHEET E-1A IN ONE SET, | | BOTH SEAL AND SIGNATURE IS A COPY. | | | | PLEASE SUBMIT THE ABOVE FOR REVIEW. | | PLEASE NOTE, OTHER SHEETS AHVE BEEN | | STAMPED BUT SHOULD NOT COME OUT UNTIL | | ALL SHEETS IN ALL SETS . | | | | IF THERE ARE ANY QUESTIONS, PLEASE CALL. | | | | DEWEY PALMER | | ELECTRICAL PLAN REVIEW | | 561-659-8096 EXT 8372 |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
8 |
Status |
F |
Date |
2002-12-26 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2002-12-26 |
Time |
16:50 |
Rev Time |
1.00 |
Received By |
dpalmer |
Date |
2002-12-26 |
Time |
16:50 |
Sent To |
|
|
Notes |
2002-12-26 00:00:00 | ************** UNSAT **************** | | | | 1)NOTE: PLEASE NOTE ALL SPECS SHEETS | | MUST SHOW A LISTING FROM A RECOGNIZED | | TESTING LAB. 110-3 | | | | PLEASE SUBMIT THE ABOVE INFORMATION FOR | | REVIEW. IF THERE ARE ANY QUESTIONS, | | PLEASE CALL. | | | | DEWEY PALMER | | ELECTRICAL PLAN REVIEW | | 561-659-8096 EXT 8372 |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
7 |
Status |
P |
Date |
2002-12-26 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2002-12-26 |
Time |
16:05 |
Rev Time |
0.75 |
Received By |
dpalmer |
Date |
2002-12-26 |
Time |
16:05 |
Sent To |
|
|
Notes |
2002-12-26 00:00:00 | SUBMITTALS FOR TRANSFER SWITH ONLY. |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
6 |
Status |
F |
Date |
2002-12-26 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2002-12-26 |
Time |
13:56 |
Rev Time |
0.25 |
Received By |
dpalmer |
Date |
2002-12-26 |
Time |
13:56 |
Sent To |
|
|
Notes |
2002-12-26 00:00:00 | ************* UNSAT ************** | | SUBMITTAL FOR LIGHTING PROTECTION | | SYSTEM REQ`D TO BE SUBMITTED SEPARATELY | | UNDER SEPARATE PERMIT. | | NOT A PART OF ORIG PLANS/BLDG. | | | | PLEASE SUBMIT PLANS/SPECS AND PERMIT | | APPLICATION FOR REVIEW. IF THERE ARE | | ANY QUESTIONS, PLEASE CALL. | | | | DEWEY PALMER | | ELECTRICAL PLAN REVIEW | | 561-659-8096 EXT 8372 |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
5 |
Status |
P |
Date |
2002-10-15 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2002-10-15 |
Time |
16:06 |
Rev Time |
0.50 |
Received By |
dpalmer |
Date |
2002-10-15 |
Time |
16:06 |
Sent To |
|
|
Notes |
2002-10-15 00:00:00 | SUBMITTALS FOR GENERATOR |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
4 |
Status |
P |
Date |
2002-09-04 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2002-09-04 |
Time |
14:39 |
Rev Time |
0.50 |
Received By |
dpalmer |
Date |
2002-09-04 |
Time |
14:39 |
Sent To |
|
|
Notes |
2002-09-04 00:00:00 | ELECTRICAL SPEC BOOKS. |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
3 |
Status |
P |
Date |
2002-07-19 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2002-07-19 |
Time |
12:55 |
Rev Time |
0.00 |
Received By |
dpalmer |
Date |
2002-07-19 |
Time |
06:02 |
Sent To |
|
|
Notes |
2002-07-19 00:00:00 | ************** NOTES **************** | | | | NOTES REDLINED ON PLANS FOR WATER | | HEATER DISCONNECTING MEANS. DISC MAY BE | | REQ`D. "LOCK OFF" DEVICE TO BE USED | | MUST BE REVIEWED BY THE CHEIF ELECTRICAL | | INSPECTOR AND MYSELF BEFORE INSTALLING. | | PLEASE CALL IF THERE ARE ANY QUESTIONS, | | OR A MEETING TO VERIFY DEVICE. | | DISC MAY BE SOMETHING AS SIMPLE AS A | | TWO POLE SWITCH. | | | | PLEASE ALSO NOTE THAT DOORS ON MAIN | | ELECTRICAL ROOM AND GENERATOR ROOM | | MUST OPEN OUTWARDS. | | | | | | IF THERE ARE ANY QUESTIONS,PLEASE CALL. | | | | DEWEY PALMER | | ELECTRICAL PLAN REVIEW | | 561-659-8096 EXT 8372 |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
2 |
Status |
F |
Date |
2002-04-17 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2002-04-17 |
Time |
06:15 |
Rev Time |
0.00 |
Received By |
dpalmer |
Date |
2002-04-17 |
Time |
06:15 |
Sent To |
|
|
Notes |
2002-04-17 00:00:00 | ***************** NOTE*************** | | | | 1)NOTE: PLEASE CALRIFY NO CONCRETE | | ENCASEMENT SHOWN FOR SERVICE ENTRANCE | | INTO MAIN FEEDING "XDP". BACK TO BACK?? | | PER LOCAL AMENDMENT 230-70 | | | | 2)NOTE: PLEASE CLARIFY THAT MAIN FIRE | | PUMP SERVICE RATED ATS HAS AN EXTERNAL | | MANUAL MEANS OF DISCONNECT. PLEASE NOTE, | | THAT NOTE FOR THIS EQUIPMENT MENTIONS | | AN EXTERNAL "SURGE SUPPRESSION", BUT | | NOTHING ABOUT MAIN. 230-76/230-79 | | PLEASE NOTE THAT MAIN FEEDING "XDP" | | MENTIONS A MAIN CIRCUIT BREAKER, IS THIS | | THE SAME SET UP? | | PLEASE CLARIFY OCP FOR FIRE PUMP MAIN? | | PLEASE SUBMIT THE ABOVE INFORMATION FOR | | REVIEW. PLEASE NOTE THAT PLANS ARE IN | | GOOD SHAPE, BUT ARE COMING BACK FOR | | OTHER COMMENTS FROM OTHER REVIEWERS. | | IF THERE ARE ANY QUESTIONS/CLARIFICATION | | -S, PLEASE CALL. | | | | DEWEY PALMER | | ELECTRICAL PLAN REVIEW | | 561-659-8096 EXT 8372 |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
F |
Date |
2001-11-06 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2001-11-06 |
Time |
18:49 |
Rev Time |
0.00 |
Received By |
dpalmer |
Date |
2001-11-05 |
Time |
22:27 |
Sent To |
|
|
Notes |
2001-11-06 00:00:00 | *************** UNSAT **************** | | | | 1)NOTE: PLEASE CLARIFY HOW FEEDS ARE | | COMING INTO "HDP" AND TO "TDP" PLEASE | | NOTE THEY DON'T BACK UP TO TRANSFORMER | | VAULT AND OTHER SERVICE ENTRANCE CONDUCT | | -ORS ARE ENCASED IN CONCRETE. | | PLEASE NOTE THAT NO MORE THAN 8' OF | | UN PROTECTED CONDUCTORS ARE ALLOWED | | "INSIDE" THE BLDG. PER LOCAL AMENDMENT; | | 230-70. | | | | 2)NOTE: PLEASE SUBMIT SCHEDULE FOR "HDP" | | ? | | | | | | | | | | 4)NOTE: PLEASE CLARIFY MANUAL MEANS OF | | DISCONNECT AT ATS FROM FPL SERVICE, | | 230-76,230-79 | | PLEASE ALSO SHOW OCP FROM FPL LINE SIDE | | | | | | 5)NOTE: PLEASE CLARIFYKW RATING FOR | | GENERATOR AND LOAD ? SEEMS LOAD SHOWN | | EXCEEDS GENERATOR RATING OF 833AMPS. | | | | 6)NOTE: OCP FOR WATER HEATERS ON PANELS | | "HB" AND "HR". PLEASE NOTE 3KW WITH 30A | | OCP. 422-11 MIN 125% MAX 150%. | | PLEASE ADJUST. | | | | PLEASE SUBMIT THE ABOVEINFORMATION | | FOR REVIEW. IF THERE ARE ANY QUESTIONS, | | PLEASE CALL. | | | | DEWEY PALMER | | ELECTRICAL PLAN REVIEW | | 561-659-8096 EXT 8372 |
|
|
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
5 |
Status |
P |
Date |
2003-12-31 |
|
|
Cont ID |
|
Sent By |
mamini |
Date |
2003-12-31 |
Time |
08:52 |
Rev Time |
0.50 |
Received By |
mamini |
Date |
2003-12-31 |
Time |
08:52 |
Sent To |
|
|
Notes |
|
|
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
4 |
Status |
P |
Date |
2003-11-05 |
|
|
Cont ID |
|
Sent By |
mamini |
Date |
2003-11-05 |
Time |
14:05 |
Rev Time |
0.50 |
Received By |
mamini |
Date |
2003-11-05 |
Time |
14:05 |
Sent To |
|
|
Notes |
|
|
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
3 |
Status |
N |
Date |
2002-05-16 |
|
|
Cont ID |
|
Sent By |
btrobaug |
Date |
2002-11-12 |
Time |
16:56 |
Rev Time |
1.00 |
Received By |
mamini |
Date |
2002-05-16 |
Time |
09:03 |
Sent To |
|
|
Notes |
2002-05-16 00:00:00 | N/A: | | 1. SEE PERMIT # 02050855 FOR CIVIL/SITE | | WORKS PERMIT. | | IF ANY QUESTIONS PLEASE CONTACT 659-8096 | | EXT. 8492 MOHAMMAD R. AMINI |
|
|
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
2 |
Status |
F |
Date |
2002-05-02 |
|
|
Cont ID |
|
Sent By |
mamini |
Date |
2002-05-02 |
Time |
10:25 |
Rev Time |
1.00 |
Received By |
mamini |
Date |
2002-05-02 |
Time |
10:25 |
Sent To |
|
|
Notes |
2002-05-02 00:00:00 | FAILED : | | 1. A SEPARATE PERMIT APPLICATION AND | | FEES FOR CIVIL /SITE WORKS BY THE | | BUILDING DEPARTMENT IS REQUIRED. | | PLEASE SUBMIT THE LATEST CIVIL / SITE | | PLANS APPROVED BY PUBLIC UTILITIES | | ENGINEERING SERVICES DEPARTMENT FOR OUR | | REVIEW AND PERMITTING. | | IF ANY QUESTIONS PLEASE CONTACT 659-8096 | | EXT. 8492 MOHAMMAD R. AMINI |
|
|
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
1 |
Status |
F |
Date |
2001-11-09 |
|
|
Cont ID |
|
Sent By |
mamini |
Date |
2001-11-09 |
Time |
09:39 |
Rev Time |
3.00 |
Received By |
mamini |
Date |
2001-11-09 |
Time |
09:39 |
Sent To |
|
|
Notes |
2001-11-09 00:00:00 | FAILED: | | 1. PER MY PHONE CONVERSATION WITH MR. | | ANDRE DUVAL OF CRAVEN * THOMPSON & ASSO. | | THE CIVIL PLANS THAT SUBMITTED ARE NOT | | FINAL. THE REVISED PLANS, APPROVED BY | | UTILITIES DEPT. WILL BE SUBMITTED FOR | | OUR REVIEW. | | IF ANY QUESTIONS PLEASE CONTACT 659-8096 | | EXT. 8492 MOHAMMAD R. AMINI |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
17 |
Status |
P |
Date |
2004-03-23 |
|
|
Cont ID |
|
Sent By |
nmccray |
Date |
2004-03-23 |
Time |
11:53 |
Rev Time |
0.00 |
Received By |
nmccray |
Date |
2004-03-23 |
Time |
11:53 |
Sent To |
|
|
Notes |
2004-03-23 00:00:00 | REVISION SP-1 DATED 3-18-04 |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
16 |
Status |
P |
Date |
2004-03-18 |
|
|
Cont ID |
|
Sent By |
nmccray |
Date |
2004-03-18 |
Time |
13:40 |
Rev Time |
0.00 |
Received By |
nmccray |
Date |
2004-03-18 |
Time |
13:40 |
Sent To |
|
|
Notes |
2004-03-18 00:00:00 | REVISION DATED 3-09-04 |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
15 |
Status |
P |
Date |
2004-03-16 |
|
|
Cont ID |
|
Sent By |
nmccray |
Date |
2004-03-16 |
Time |
13:15 |
Rev Time |
0.00 |
Received By |
nmccray |
Date |
2004-03-16 |
Time |
13:15 |
Sent To |
|
|
Notes |
2004-03-16 00:00:00 | REVISION DATED 02-25-04 |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
14 |
Status |
P |
Date |
2004-02-24 |
|
|
Cont ID |
|
Sent By |
nmccray |
Date |
2004-02-24 |
Time |
09:48 |
Rev Time |
0.00 |
Received By |
nmccray |
Date |
2004-02-24 |
Time |
09:48 |
Sent To |
|
|
Notes |
2004-02-24 00:00:00 | REVISION FOR FLOORING DATED 2-17-04 |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
13 |
Status |
P |
Date |
2004-02-20 |
|
|
Cont ID |
|
Sent By |
mcarsill |
Date |
2004-02-20 |
Time |
16:02 |
Rev Time |
0.00 |
Received By |
mcarsill |
Date |
2004-02-20 |
Time |
16:02 |
Sent To |
|
|
Notes |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
12 |
Status |
P |
Date |
2004-01-29 |
|
|
Cont ID |
|
Sent By |
mcarsill |
Date |
2004-01-29 |
Time |
15:10 |
Rev Time |
0.00 |
Received By |
mcarsill |
Date |
2004-01-29 |
Time |
15:10 |
Sent To |
|
|
Notes |
2004-01-29 00:00:00 | 1) INTERIOR FINISH MATERIALS ON WALLS | | AND CEILINGS SHALL COMPLY WITH | | BUILDING AND FIRE CODE REQUIREMENTS. | | | | MIKE CARSILLO, ASSISTANT FIRE MARSHAL | | 835-2910 |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
11 |
Status |
P |
Date |
2004-01-07 |
|
|
Cont ID |
|
Sent By |
mcarsill |
Date |
2004-01-07 |
Time |
09:29 |
Rev Time |
0.00 |
Received By |
mcarsill |
Date |
2004-01-07 |
Time |
09:29 |
Sent To |
|
|
Notes |
2004-01-07 00:00:00 | 1) ALL ARCHITECTURAL FOAM AND PANELS | | INSTALLED ON THE BUILDING SHALL BE | | MEET THE REQUIREMENTS FOR FIRE LIMIT | | LOCATIONS. | | | | MIKE CARSILLO, ASSISTANT FIRE MARSHAL | | 835-2910 |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
10 |
Status |
P |
Date |
2003-11-26 |
|
|
Cont ID |
|
Sent By |
mcarsill |
Date |
2003-11-26 |
Time |
17:17 |
Rev Time |
0.00 |
Received By |
mcarsill |
Date |
2003-11-26 |
Time |
17:17 |
Sent To |
|
|
Notes |
2003-11-26 00:00:00 | 1) PLEASE BE ADVISED THAT SOME | | LOCATIONS REQUIRE A WATER CURTAIN. | | PLEASE REVIEW INFORMATION FROM THE | | CONSTRUCTION BOARD OF ADJUSTMENT | | AND APPEALS AND PERFORM ACCORDINGLY. | | | | MIKE CARSILLO, ASSISTANT FIRE MARSHAL | | 835-2910 |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
9 |
Status |
P |
Date |
2003-10-30 |
|
|
Cont ID |
|
Sent By |
mcarsill |
Date |
2003-10-30 |
Time |
16:35 |
Rev Time |
0.00 |
Received By |
mcarsill |
Date |
2003-10-30 |
Time |
16:35 |
Sent To |
|
|
Notes |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
8 |
Status |
P |
Date |
2003-10-09 |
|
|
Cont ID |
|
Sent By |
mcarsill |
Date |
2003-10-09 |
Time |
17:33 |
Rev Time |
0.00 |
Received By |
mcarsill |
Date |
2003-10-09 |
Time |
17:33 |
Sent To |
|
|
Notes |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
7 |
Status |
P |
Date |
2003-07-29 |
|
|
Cont ID |
|
Sent By |
mcarsill |
Date |
2003-07-29 |
Time |
17:23 |
Rev Time |
0.00 |
Received By |
mcarsill |
Date |
2003-07-29 |
Time |
17:23 |
Sent To |
|
|
Notes |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
6 |
Status |
F |
Date |
2003-05-01 |
|
|
Cont ID |
|
Sent By |
nmccray |
Date |
2003-05-01 |
Time |
10:19 |
Rev Time |
0.00 |
Received By |
nmccray |
Date |
2003-04-30 |
Time |
10:48 |
Sent To |
|
|
Notes |
2003-05-01 00:00:00 | *************DENIED********************* | | 1) SEPARATION WITHIN PARKING STRUCTURE | | SHALL BE FIRE RATED NOT LESS THAN TWO | | HOURS. | | | | 2) SMOKE EVACUATION SYSTEM WAS APPROVED | | NOT SMOKE CONTROL. | | | | NATE MCCRAY, CAPTAIN | | 659-8096, EXT 8497 | | 835-2910 |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
5 |
Status |
P |
Date |
2002-11-08 |
|
|
Cont ID |
|
Sent By |
mcarsill |
Date |
2002-11-08 |
Time |
18:53 |
Rev Time |
0.00 |
Received By |
mcarsill |
Date |
2002-11-08 |
Time |
18:53 |
Sent To |
|
|
Notes |
2002-11-08 00:00:00 | SUBMITTALS. |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
4 |
Status |
P |
Date |
2002-08-02 |
|
|
Cont ID |
|
Sent By |
mcarsill |
Date |
2002-08-02 |
Time |
16:13 |
Rev Time |
0.00 |
Received By |
mcarsill |
Date |
2002-08-02 |
Time |
16:13 |
Sent To |
|
|
Notes |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
3 |
Status |
F |
Date |
2002-07-25 |
|
|
Cont ID |
|
Sent By |
mcarsill |
Date |
2002-07-25 |
Time |
15:45 |
Rev Time |
0.00 |
Received By |
mcarsill |
Date |
2002-07-25 |
Time |
15:45 |
Sent To |
|
|
Notes |
2002-07-25 00:00:00 | THE "WS VERTICAL" CENTRAL FIRE | | SPRINKLER HEAD TECHNICAL DATA SHEET | | INDICATES THAT THE USE AND THEIR | | INSTALLATION DOES NOT FOLLOW THE | | LISTED MANUFACTURER'S CRITERIA. SUFFOLK | | CONSTRUCTION WAS CONTACTED BY TELEPHONE | | ON 7.25.02 AND ADVISED OF THIS. | | THE DESIGNER'S ARE TO REVIEW THE | | TECHNICAL DATA SHEET PROVIDED FOR THESE | | FIRE SPRINKLER HEADS AND ENSURE THAT | | THE FIRE SPRINKLER HEADS ARE INSTALLED | | PROPERLY WITH REGARDS TO THEIR | | INTENDED USE AND LISTINGS. | | | | 2) ALL FIRE ALARM DEVICES ARE TO | | ACTIVATE THE STAIRWELL PRESSURIZATION | | FANS. | | | | MIKE CARSILLO, ASSISTANT FIRE MARSHAL | | 659-8096,EXT.8497 | | 835-2910 |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
2 |
Status |
F |
Date |
2002-05-03 |
|
|
Cont ID |
|
Sent By |
mcarsill |
Date |
2002-05-03 |
Time |
12:12 |
Rev Time |
0.00 |
Received By |
mcarsill |
Date |
2002-05-03 |
Time |
12:12 |
Sent To |
|
|
Notes |
2002-05-03 00:00:00 | 1) ELECTRONIC SWITCHES WILL BE REQUIRED | | ON FIRE PROTECTION BACKFLOW DEVICES. | | | | 2) OCCUPANCY SEPARATIONS AND FIRE | | RESISTANCE OF WALLS INDICATES A ONE HOUR | | FIRE SEPARATION BETWEEN THE GARAGE AND | | THE BUILDING. A TWO HOUR FIRE SEPARATION | | IS REQUIRED. | | | | 3) SEVERAL DOORS INCLUDING EXIT DOORS | | SWING OVER THE PROPERTY LINES FOR THE | | BUILDING. | | | | 4) HOW DO THE EXIT DOORS THAT TERMINATE | | ON THE SOUTH SIDE OF THE BUILDING INTO | | THE ALLEY NOT BECOME OBSTRUCTED OR | | BLOCKED. | | | | 5) BUILDING ADDRESS NOT SHOWN ON | | ELEVATION DRAWING PAGE A4.02. | | | | 6) THE PLAN REVIEW COMMENTS OMITTED THAT | | STAIRS ARE TO BE KEPT UP WITH | | CONSTRUCTION. | | | | 7) ANY FIRE ALARM INITIATING DEVICE OR | | FIRE SPRINKLER HEAD ACTIVATIONS ARE TO | | INITIATE THE STAIRWELL PRESSURIZATION | | FANS. | | | | 8) STAIR PRESSURIZATION IS 0.05 WATER | | COLUMN TO INCLUDE MAXIMUM ANTICIPATED | | STACK EFFECT FOR THE REST OF THE | | BUILDING. | | | | 9) EIFS NOTED FOR BUILDING. PLEASE | | REVIEW APPENDIX F OF THE STANDARD | | BUILDING CODE. | | | | MIKE CARSILLO, ASSISTANT FIRE MARSHAL | | 659-8096,EXT.8497 | | 835-2910 |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
1 |
Status |
F |
Date |
2001-10-24 |
|
|
Cont ID |
|
Sent By |
mcarsill |
Date |
2001-10-24 |
Time |
13:09 |
Rev Time |
0.00 |
Received By |
mcarsill |
Date |
2001-10-24 |
Time |
13:09 |
Sent To |
|
|
Notes |
2001-10-24 00:00:00 | 1) PLEASE BE ADVISED THAT THIS | | BUILDING WILL BE LOCATED IN THE CITY | | FIRE LIMITS. PLEASE BE ADVISED THAT | | CERTAIN RESTRICTIONS APPLY TO | | BUILDINGS LOCATED IN THESE LIMTS. | | PLEASE SEE APPENDIX F OF THE STANDARD | | BUILDING CODE AND CHAPTER 11 OF THE | | CITY CODE. | | 2) SEPARATION BETWEEN THE PARKING | | GARAGE AND OTHER PORTIONS OF THE | | BUILDING SHALL BE AT LEAST TWO HOURS | | AND NOT ONE HOUR AS DEPICTED. | | 3) WRONG LIFE SAFETY CODE REFERENCED | | ON THE PLANS. SHOULD READ 1985 EDITION | | INSTEAD OF 1997. | | 4) FIRE HYDRANTS NOT SHOWN ON DRAWINGS. | | 5) TEMPORARY STANDPIPES ARE REQUIRED | | DURING CONSTRUCTION WHEN THE BUILDING | | REACHES THREE STORIES AND FIFTY FEET | | IN HEIGHT. ALSO EXIT STAIRS ARE TO BE | | KEPT UP WITH CONSTRUCTION. | | 6) PLEASE INDICATE LOCATION ON KNOX-BOX. | | 7) PLEASE INDICATE COMPLIANCE WITH | | STRETCHER REQUIREMENTS OF THE STANDARD | | BUILDING CODE. | | 8) FIRE COMMAND ROOM SHALL CONTAIN | | ALL OF THE PRESCRIPTIVE REQUIREMENTS | | OF THE STANDARD BUILDING CODE. | | 9) PLEASE EXPLAIN PURPOSE OF GATES AT | | STAIRS ON THE ROOF. | | 10) PLEASE INDICATE ON THE PLANS THE | | NUMBER OF AIR CHANGES REQUIRED FOR THE | | CLOSED PARKING GARAGE. ALSO INDICATE | | AIR EXHAUST VOLUMES. | | 11) BUILDING ADDRESS REQUIRED PER CITY | | CODE 3343-00. | | 12) CANVAS CANOPIES TO BE FIRE | | RETARDANT. | | 13) PLEASE VERIFY THAT THE FIRE | | SPRINKLER HEADS PLANNED FOR USE ARE NOT | | ON THE VOLUNTARY RECALL LIST PROVIDED. | | 14) PLEASE INDICATE WHAT THE VOICE | | EVACUATION MESSAGE WILL SAY FOR THE | | FIRE ALARM SYSTEM. | | 15) PLEASE FURTHER EXPLAIN # 15 ON DOOR | | SCHEDULE NOTES. | | 16) HOW IS EXITING DIMINISHED WHEN THE | | GARAGE DOORS ARE CLOSED. | | 17) PLEASE INDICATE WHAT THE HANDRAILS | | AND GUARDRAILS RATED FOR. | | 18) PLEASE PROVIDE MORE INFORMATION ON | | THE INSULATION PLANNED FOR USE ON THE | | TRASH-CHUTE. | | 19) PLEASE EXPLAIN WHY NO FIRE SPRINKLER | | HEADS ARE SHOWN IN THE WALKWAY AREA. | | 20) NO PENETRATIONS ALLOWED IN THE | | STAIRWELLS EXCEPT FOR EMERGENCY LIGHTING | | AND FIRE PROTECTION SYSTEMS. | | 21) PLEASE DEMONSTRATE COMPLAINCE FOR | | SEPARATION OF EXITS. | | 22) PLEASE PROVIDE TESTING CRITERIA FOR | | THE STAIRWELL PRESSURIZATION EQUIPMENT | | CONTAINED WITHIN THE BUILDING. | | 23) FIRE SPRINKLER DRAWINGS HAVE FIRE | | COMMAND ROOM AND VALET ROOM SWITCHED. | | 24) CONDUIT SHAFTS ARE TO BE PROPERLY | | FIRE RATED. PLEASE INDICATE THIS ON | | THE PLANS. | | 25) SEPARATE PLANS AND PERMITS REQUIRED | | FOR FIRE SPRINKLER SYSTEMS AND FIRE | | ALARM SYSTEMS. | | 26) ELEVATORS TO COMPLY WITH ANSI A17.1. | | 27) HOW IS COMBUSTIBLE LINT REMOVED FROM | | DRYER EXHAUST VENTS. | | 28) ARE POOL CHEMICALS PLANNED TO BE | | STORED IN POOL EQUIPMENT ROOMS. | | 29) ANY CHANGES IN ELEVATIONS LESS THAN | | 21 INCHES SHALL BE BY RAMPS. | | 30) FIRST FLOOR RETAIL SPACES ARE TO | | MEET MINIMUM FIRE SAFETY REQUIREMENTS | | PRIOR TO BUILDING RECEIVING APPROVALS. | | 31) PLEASE DEMONSTRATE COMPLIANCE WITH | | SMOKE CONTROL REQUIREMENTS FROM THE | | STANDARD BUILDING CODE. | | 32) WHAT WILL THE ACCESS PANEL DOOR | | BELOW THE MECHANICAL ROOM METAL | | ACCESS STAIR BE USED FOR. | | | | MIKE CARSILLO, CAPTAIN | | 659-8096,EXT.8497 | | 835-2910 |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
67 |
Status |
N |
Date |
2004-03-25 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2004-03-25 |
Time |
15:20 |
Rev Time |
0.00 |
Received By |
csiegber |
Date |
2004-03-25 |
Time |
15:20 |
Sent To |
B |
|
Notes |
2004-03-25 00:00:00 | TO SH DESK/SUBMITTAL/ |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
66 |
Status |
N |
Date |
2004-03-22 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2004-03-22 |
Time |
11:54 |
Rev Time |
0.00 |
Received By |
csiegber |
Date |
2004-03-22 |
Time |
11:52 |
Sent To |
|
|
Notes |
2004-03-22 00:00:00 | TO NEIL MELICK/LM BOX |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
65 |
Status |
N |
Date |
2004-03-19 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2004-03-19 |
Time |
16:19 |
Rev Time |
0.00 |
Received By |
csiegber |
Date |
2004-03-19 |
Time |
16:19 |
Sent To |
|
|
Notes |
2004-03-19 00:00:00 | TO KS DESK/PER LM |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
64 |
Status |
N |
Date |
2004-03-19 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2004-03-19 |
Time |
16:18 |
Rev Time |
0.00 |
Received By |
csiegber |
Date |
2004-03-19 |
Time |
16:18 |
Sent To |
B |
|
Notes |
2004-03-19 00:00:00 | TO HP DESK/PER REQUEST |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
63 |
Status |
N |
Date |
2004-03-16 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2004-03-16 |
Time |
15:40 |
Rev Time |
0.00 |
Received By |
csiegber |
Date |
2004-03-16 |
Time |
15:40 |
Sent To |
B |
|
Notes |
2004-03-16 00:00:00 | TO SH DESK/REV/A2-06/A3-03 |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
62 |
Status |
N |
Date |
2004-03-16 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2004-03-16 |
Time |
15:29 |
Rev Time |
0.00 |
Received By |
csiegber |
Date |
2004-03-16 |
Time |
15:29 |
Sent To |
B |
|
Notes |
2004-03-16 00:00:00 | TO SH DESK/SUBMITTAL/PRECAST POT |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
61 |
Status |
N |
Date |
2004-03-17 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2004-03-16 |
Time |
09:19 |
Rev Time |
0.00 |
Received By |
csiegber |
Date |
2004-03-16 |
Time |
09:19 |
Sent To |
B |
|
Notes |
2004-03-16 00:00:00 | TO COMM BD#50 |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
60 |
Status |
N |
Date |
2004-03-04 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2004-03-04 |
Time |
13:45 |
Rev Time |
0.00 |
Received By |
csiegber |
Date |
2004-03-04 |
Time |
13:44 |
Sent To |
|
|
Notes |
2004-03-04 00:00:00 | TO COMM BD#13 |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
59 |
Status |
N |
Date |
2004-03-01 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2004-03-01 |
Time |
12:25 |
Rev Time |
0.00 |
Received By |
csiegber |
Date |
2004-03-01 |
Time |
12:25 |
Sent To |
P |
|
Notes |
2004-03-01 00:00:00 | TO KS BOX/SUBMITTAL |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
58 |
Status |
N |
Date |
2004-03-01 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2004-03-01 |
Time |
12:10 |
Rev Time |
0.00 |
Received By |
csiegber |
Date |
2004-03-01 |
Time |
12:10 |
Sent To |
P |
|
Notes |
2004-03-01 00:00:00 | TO KS BOX/SUBMITTAL |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
57 |
Status |
N |
Date |
2004-03-01 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2004-03-01 |
Time |
11:30 |
Rev Time |
0.00 |
Received By |
csiegber |
Date |
2004-03-01 |
Time |
11:30 |
Sent To |
|
|
Notes |
2004-03-01 00:00:00 | TO COMM BD#28 |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
56 |
Status |
N |
Date |
2004-02-20 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2004-02-20 |
Time |
16:46 |
Rev Time |
0.00 |
Received By |
csiegber |
Date |
2004-02-20 |
Time |
16:21 |
Sent To |
|
|
Notes |
2004-02-20 00:00:00 | TO COMM BD# 33 |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
55 |
Status |
N |
Date |
2004-02-20 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2004-02-20 |
Time |
16:05 |
Rev Time |
0.00 |
Received By |
csiegber |
Date |
2004-02-20 |
Time |
16:05 |
Sent To |
B |
|
Notes |
2004-02-20 00:00:00 | TO SH DESK/SUBMITTAL |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
54 |
Status |
N |
Date |
2004-02-18 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2004-02-18 |
Time |
12:26 |
Rev Time |
0.00 |
Received By |
csiegber |
Date |
2004-02-18 |
Time |
12:26 |
Sent To |
|
|
Notes |
2004-02-18 00:00:00 | TO COMM BD#60 |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
53 |
Status |
N |
Date |
2004-02-12 |
|
|
Cont ID |
|
Sent By |
ptjomsto |
Date |
2004-02-12 |
Time |
08:05 |
Rev Time |
0.00 |
Received By |
ptjomsto |
Date |
|
Time |
|
Sent To |
|
|
Notes |
2004-02-12 00:00:00 | GIVEN TO KEN STEVENS |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
52 |
Status |
N |
Date |
2004-02-11 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2004-02-11 |
Time |
14:05 |
Rev Time |
0.00 |
Received By |
csiegber |
Date |
2004-02-11 |
Time |
14:05 |
Sent To |
B |
|
Notes |
2004-02-11 00:00:00 | TO SH DESK/SUBMITTAL |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
51 |
Status |
N |
Date |
2004-01-28 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2004-01-28 |
Time |
16:09 |
Rev Time |
0.00 |
Received By |
csiegber |
Date |
2004-01-28 |
Time |
16:09 |
Sent To |
B |
|
Notes |
2004-01-28 00:00:00 | TO SH DESK/SUBMITTAL |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
50 |
Status |
N |
Date |
2004-01-23 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2004-01-22 |
Time |
16:29 |
Rev Time |
0.00 |
Received By |
csiegber |
Date |
2004-01-23 |
Time |
09:12 |
Sent To |
|
|
Notes |
2004-01-22 00:00:00 | TO COMM BD#53 |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
49 |
Status |
N |
Date |
2004-01-05 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2004-01-05 |
Time |
08:57 |
Rev Time |
0.00 |
Received By |
csiegber |
Date |
2004-01-05 |
Time |
08:57 |
Sent To |
B |
|
Notes |
2004-01-05 00:00:00 | TO SH DESK/SUBMITTAL FRAMING ARCH WALL |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
48 |
Status |
N |
Date |
2003-12-30 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2003-12-30 |
Time |
15:51 |
Rev Time |
0.00 |
Received By |
csiegber |
Date |
2003-12-30 |
Time |
15:51 |
Sent To |
|
|
Notes |
2003-12-30 00:00:00 | TO COMM BD#55/3 ROLLS ON BACK SHELF |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
47 |
Status |
N |
Date |
2003-12-29 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2003-12-29 |
Time |
10:05 |
Rev Time |
0.00 |
Received By |
csiegber |
Date |
2003-12-29 |
Time |
10:05 |
Sent To |
B |
|
Notes |
2003-12-29 00:00:00 | TO HP DESK/3 SUBMITTALS |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
46 |
Status |
N |
Date |
2003-11-24 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2003-11-24 |
Time |
13:41 |
Rev Time |
0.00 |
Received By |
csiegber |
Date |
2003-11-24 |
Time |
13:41 |
Sent To |
B |
|
Notes |
2003-11-24 00:00:00 | TO HP DESK/SUBMITTAL |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
45 |
Status |
N |
Date |
2003-11-05 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2003-11-05 |
Time |
15:27 |
Rev Time |
0.00 |
Received By |
csiegber |
Date |
2003-11-05 |
Time |
15:27 |
Sent To |
B |
|
Notes |
2003-11-05 00:00:00 | TO HP DESK/SUBMITTAL |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
44 |
Status |
N |
Date |
2003-10-28 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2003-10-28 |
Time |
08:37 |
Rev Time |
0.00 |
Received By |
csiegber |
Date |
2003-10-28 |
Time |
08:37 |
Sent To |
B |
|
Notes |
2003-10-28 00:00:00 | HP DESK/SUBMITTAL/BALCONY RAILS | | SUBMITTAL/VEHICULAR CABLE RAIL | | SUBMITTAL/METAL DECKING & FASTENING |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
43 |
Status |
N |
Date |
2003-10-28 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2003-10-28 |
Time |
08:32 |
Rev Time |
0.00 |
Received By |
csiegber |
Date |
2003-10-28 |
Time |
08:32 |
Sent To |
B |
|
Notes |
2003-10-28 00:00:00 | 4 SUMBMITTALS | | SUBMITTAL/ROOF TILE | | SUBMITTAL/STAIR & HAND RAIL | | SUBMITTAL/GYPSUM CEILING PANELS | | SUBMITTAL/ROOF SHUTTLE CALCS |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
42 |
Status |
N |
Date |
2003-10-27 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2003-10-27 |
Time |
15:10 |
Rev Time |
0.00 |
Received By |
csiegber |
Date |
2003-10-27 |
Time |
15:10 |
Sent To |
|
|
Notes |
2003-10-27 00:00:00 | TO DON NEELEY DESK |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
41 |
Status |
N |
Date |
2003-10-14 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2003-10-14 |
Time |
08:55 |
Rev Time |
0.00 |
Received By |
csiegber |
Date |
2003-10-14 |
Time |
08:55 |
Sent To |
M |
|
Notes |
2003-10-14 00:00:00 | TO PK BOX |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
40 |
Status |
N |
Date |
2003-10-10 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2003-10-10 |
Time |
16:47 |
Rev Time |
0.00 |
Received By |
csiegber |
Date |
2003-10-10 |
Time |
16:47 |
Sent To |
B |
|
Notes |
2003-10-10 00:00:00 | TO HP DESK |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
39 |
Status |
N |
Date |
2003-10-03 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2003-10-03 |
Time |
12:46 |
Rev Time |
0.00 |
Received By |
csiegber |
Date |
2003-10-03 |
Time |
12:46 |
Sent To |
|
|
Notes |
2003-10-03 00:00:00 | TO COMM BD#40/REV |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
38 |
Status |
N |
Date |
2003-09-29 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2003-09-29 |
Time |
11:30 |
Rev Time |
0.00 |
Received By |
csiegber |
Date |
2003-09-29 |
Time |
11:30 |
Sent To |
B |
|
Notes |
2003-09-29 00:00:00 | TO HP DESK |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
37 |
Status |
N |
Date |
2003-09-19 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2003-09-19 |
Time |
10:08 |
Rev Time |
0.00 |
Received By |
csiegber |
Date |
2003-09-19 |
Time |
10:08 |
Sent To |
M |
|
Notes |
2003-09-19 00:00:00 | TO PK DESK/SMOKE EVAC DUCT |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
36 |
Status |
N |
Date |
2003-09-15 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2003-09-15 |
Time |
14:27 |
Rev Time |
0.00 |
Received By |
csiegber |
Date |
2003-09-15 |
Time |
14:27 |
Sent To |
B |
|
Notes |
2003-09-15 00:00:00 | TO HP DESK/FPL DOOR HDWR SCHD |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
35 |
Status |
N |
Date |
2003-09-15 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2003-09-15 |
Time |
14:25 |
Rev Time |
0.00 |
Received By |
csiegber |
Date |
2003-09-15 |
Time |
14:25 |
Sent To |
B |
|
Notes |
2003-09-15 00:00:00 | TO HP DESK |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
34 |
Status |
N |
Date |
2003-09-15 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2003-09-15 |
Time |
14:24 |
Rev Time |
0.00 |
Received By |
csiegber |
Date |
2003-09-15 |
Time |
14:24 |
Sent To |
M |
|
Notes |
2003-09-15 00:00:00 | TO PK DESK |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
33 |
Status |
N |
Date |
2003-09-05 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2003-09-05 |
Time |
15:57 |
Rev Time |
0.00 |
Received By |
csiegber |
Date |
2003-09-05 |
Time |
15:57 |
Sent To |
B |
|
Notes |
2003-09-05 00:00:00 | TO HP DESK |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
32 |
Status |
N |
Date |
2003-08-14 |
|
|
Cont ID |
|
Sent By |
dbaxter |
Date |
2003-08-14 |
Time |
08:29 |
Rev Time |
0.00 |
Received By |
dbaxter |
Date |
2003-08-14 |
Time |
08:29 |
Sent To |
P |
|
Notes |
2003-08-14 00:00:00 | TO KSTEVENS DESK. |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
31 |
Status |
N |
Date |
2003-08-14 |
|
|
Cont ID |
|
Sent By |
dbaxter |
Date |
2003-08-14 |
Time |
08:27 |
Rev Time |
0.00 |
Received By |
dbaxter |
Date |
2003-08-14 |
Time |
08:27 |
Sent To |
M |
|
Notes |
2003-08-14 00:00:00 | TO PKRAUSS DESK. |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
30 |
Status |
N |
Date |
2003-08-08 |
|
|
Cont ID |
|
Sent By |
alange |
Date |
2003-08-08 |
Time |
16:12 |
Rev Time |
0.00 |
Received By |
alange |
Date |
2003-08-08 |
Time |
16:12 |
Sent To |
E |
|
Notes |
2003-08-08 00:00:00 | TO DP DESK |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
29 |
Status |
N |
Date |
2003-08-08 |
|
|
Cont ID |
|
Sent By |
alange |
Date |
2003-08-08 |
Time |
16:10 |
Rev Time |
0.00 |
Received By |
alange |
Date |
2003-08-08 |
Time |
16:10 |
Sent To |
B |
|
Notes |
2003-08-08 00:00:00 | TO HP DESK |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
28 |
Status |
N |
Date |
2003-08-08 |
|
|
Cont ID |
|
Sent By |
alange |
Date |
2003-08-08 |
Time |
16:07 |
Rev Time |
0.00 |
Received By |
alange |
Date |
2003-08-08 |
Time |
16:07 |
Sent To |
B |
|
Notes |
2003-08-08 00:00:00 | TO HP DESK |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
27 |
Status |
N |
Date |
2003-08-08 |
|
|
Cont ID |
|
Sent By |
alange |
Date |
2003-08-08 |
Time |
16:06 |
Rev Time |
0.00 |
Received By |
alange |
Date |
2003-08-08 |
Time |
16:06 |
Sent To |
B |
|
Notes |
2003-08-08 00:00:00 | TO HP DESK |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
26 |
Status |
N |
Date |
2003-07-11 |
|
|
Cont ID |
|
Sent By |
shernand |
Date |
2003-07-11 |
Time |
11:17 |
Rev Time |
0.00 |
Received By |
shernand |
Date |
2003-07-11 |
Time |
11:17 |
Sent To |
M |
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
25 |
Status |
N |
Date |
2003-07-11 |
|
|
Cont ID |
|
Sent By |
shernand |
Date |
2003-07-11 |
Time |
11:14 |
Rev Time |
0.00 |
Received By |
shernand |
Date |
2003-07-11 |
Time |
11:14 |
Sent To |
B |
|
Notes |
2003-07-11 00:00:00 | 4 REVISIONS FOR HP DESK. |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
24 |
Status |
N |
Date |
2003-07-11 |
|
|
Cont ID |
|
Sent By |
shernand |
Date |
2003-07-11 |
Time |
11:12 |
Rev Time |
0.00 |
Received By |
shernand |
Date |
2003-07-11 |
Time |
11:12 |
Sent To |
P |
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
23 |
Status |
N |
Date |
2003-07-09 |
|
|
Cont ID |
|
Sent By |
shernand |
Date |
2003-07-09 |
Time |
14:20 |
Rev Time |
0.00 |
Received By |
shernand |
Date |
2003-07-09 |
Time |
14:20 |
Sent To |
|
|
Notes |
2003-07-09 00:00:00 | COMM BOARD #37. 2 MORE PLANS ON RACK | | NEXT TO CONF. ROOM. |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
22 |
Status |
N |
Date |
2003-06-20 |
|
|
Cont ID |
|
Sent By |
shernand |
Date |
2003-06-20 |
Time |
11:57 |
Rev Time |
0.00 |
Received By |
shernand |
Date |
2003-06-20 |
Time |
11:57 |
Sent To |
E |
|
Notes |
2003-06-20 00:00:00 | DP DESK |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
21 |
Status |
N |
Date |
2003-06-06 |
|
|
Cont ID |
|
Sent By |
shernand |
Date |
2003-06-06 |
Time |
16:16 |
Rev Time |
0.00 |
Received By |
shernand |
Date |
2003-06-06 |
Time |
16:16 |
Sent To |
B |
|
Notes |
2003-06-06 00:00:00 | HP DESK |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
20 |
Status |
N |
Date |
2003-05-08 |
|
|
Cont ID |
|
Sent By |
shernand |
Date |
2003-05-08 |
Time |
11:53 |
Rev Time |
0.00 |
Received By |
shernand |
Date |
2003-05-08 |
Time |
11:53 |
Sent To |
|
|
Notes |
2003-05-08 00:00:00 | COMM BOARD #42 |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
19 |
Status |
N |
Date |
2003-05-05 |
|
|
Cont ID |
|
Sent By |
shernand |
Date |
2003-05-05 |
Time |
11:35 |
Rev Time |
0.00 |
Received By |
shernand |
Date |
2003-05-05 |
Time |
11:35 |
Sent To |
B |
|
Notes |
2003-05-05 00:00:00 | GAVE TO BILL STAPLES PER CUSTOMER REQUES |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
18 |
Status |
N |
Date |
2003-05-02 |
|
|
Cont ID |
|
Sent By |
shernand |
Date |
2003-05-02 |
Time |
17:53 |
Rev Time |
0.00 |
Received By |
shernand |
Date |
2003-05-02 |
Time |
17:53 |
Sent To |
P |
|
Notes |
2003-05-02 00:00:00 | KSTEVENS DESK. SUBMITTAL |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
17 |
Status |
N |
Date |
2003-05-02 |
|
|
Cont ID |
|
Sent By |
shernand |
Date |
2003-05-02 |
Time |
17:51 |
Rev Time |
0.00 |
Received By |
shernand |
Date |
2003-05-02 |
Time |
17:51 |
Sent To |
M |
|
Notes |
2003-05-02 00:00:00 | PK DESK |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
16 |
Status |
N |
Date |
2003-05-02 |
|
|
Cont ID |
|
Sent By |
shernand |
Date |
2003-05-02 |
Time |
08:46 |
Rev Time |
0.00 |
Received By |
shernand |
Date |
2003-05-02 |
Time |
08:46 |
Sent To |
B |
|
Notes |
2003-05-02 00:00:00 | HP DESK |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
15 |
Status |
N |
Date |
2003-04-17 |
|
|
Cont ID |
|
Sent By |
shernand |
Date |
2003-04-17 |
Time |
14:05 |
Rev Time |
0.00 |
Received By |
shernand |
Date |
2003-04-17 |
Time |
14:05 |
Sent To |
B |
|
Notes |
2003-04-17 00:00:00 | DON NEELY DESK |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
14 |
Status |
N |
Date |
2003-04-11 |
|
|
Cont ID |
|
Sent By |
shernand |
Date |
2003-04-11 |
Time |
08:56 |
Rev Time |
0.00 |
Received By |
shernand |
Date |
2003-04-11 |
Time |
08:56 |
Sent To |
B |
|
Notes |
2003-04-11 00:00:00 | HP DESK |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
13 |
Status |
N |
Date |
2003-03-26 |
|
|
Cont ID |
|
Sent By |
sthyng |
Date |
2003-03-26 |
Time |
14:47 |
Rev Time |
0.00 |
Received By |
sthyng |
Date |
2003-03-26 |
Time |
14:47 |
Sent To |
|
|
Notes |
2003-03-26 00:00:00 | TO COMM BOARD #19 | | PLANS ON RACK, 5 ROLLS |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
12 |
Status |
N |
Date |
2003-03-25 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2003-03-25 |
Time |
09:49 |
Rev Time |
0.00 |
Received By |
dpalmer |
Date |
2003-03-25 |
Time |
09:49 |
Sent To |
B |
|
Notes |
2003-03-25 00:00:00 | SUBMITTALS TO HP`S DESK. |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
11 |
Status |
N |
Date |
2003-03-10 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2003-03-10 |
Time |
12:53 |
Rev Time |
0.00 |
Received By |
dpalmer |
Date |
2003-03-10 |
Time |
12:52 |
Sent To |
Z |
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
10 |
Status |
N |
Date |
2003-03-10 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2003-03-10 |
Time |
12:24 |
Rev Time |
0.00 |
Received By |
dpalmer |
Date |
2003-03-10 |
Time |
12:24 |
Sent To |
B |
|
Notes |
2003-03-10 00:00:00 | TO HHP`S DESK. |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
9 |
Status |
N |
Date |
2003-02-18 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2003-02-18 |
Time |
17:34 |
Rev Time |
0.00 |
Received By |
dpalmer |
Date |
2003-02-18 |
Time |
17:34 |
Sent To |
B |
|
Notes |
2003-02-18 00:00:00 | TO HHP'S DESK. |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
8 |
Status |
N |
Date |
2003-02-11 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2003-02-11 |
Time |
11:36 |
Rev Time |
0.00 |
Received By |
dpalmer |
Date |
2003-02-11 |
Time |
11:36 |
Sent To |
B |
|
Notes |
2003-02-11 00:00:00 | TO HHP'S DESK. |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
7 |
Status |
N |
Date |
2003-02-06 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2003-02-06 |
Time |
16:07 |
Rev Time |
0.00 |
Received By |
dpalmer |
Date |
2003-02-06 |
Time |
16:07 |
Sent To |
B |
|
Notes |
2003-02-06 00:00:00 | TO HHP'S DESK. |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
6 |
Status |
N |
Date |
2003-02-04 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2003-02-04 |
Time |
10:02 |
Rev Time |
0.00 |
Received By |
dpalmer |
Date |
2003-02-04 |
Time |
10:01 |
Sent To |
B |
|
Notes |
2003-02-04 00:00:00 | SUBMITTALS TO HHP'S DESK, |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
5 |
Status |
N |
Date |
2003-02-04 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2003-02-04 |
Time |
09:33 |
Rev Time |
0.00 |
Received By |
dpalmer |
Date |
2003-02-04 |
Time |
09:33 |
Sent To |
B |
|
Notes |
2003-02-04 00:00:00 | TO HHP'S DESK.ELEV |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
4 |
Status |
N |
Date |
2003-02-04 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2003-02-04 |
Time |
09:03 |
Rev Time |
0.00 |
Received By |
dpalmer |
Date |
2003-02-04 |
Time |
09:03 |
Sent To |
B |
|
Notes |
2003-02-04 00:00:00 | SUBMITTAL TO HHP`S DESK. |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2002-12-05 |
|
|
Cont ID |
|
Sent By |
btrobaug |
Date |
2002-12-05 |
Time |
16:21 |
Rev Time |
0.00 |
Received By |
btrobaug |
Date |
2002-12-05 |
Time |
16:21 |
Sent To |
B |
|
Notes |
2002-12-05 00:00:00 | TO HAROLD P./WRT |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2002-11-12 |
|
|
Cont ID |
|
Sent By |
btrobaug |
Date |
2002-11-12 |
Time |
16:56 |
Rev Time |
0.00 |
Received By |
btrobaug |
Date |
2002-11-12 |
Time |
16:56 |
Sent To |
ENG |
|
Notes |
2002-11-12 00:00:00 | TO MO./WRT. |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2002-11-08 |
|
|
Cont ID |
|
Sent By |
btrobaug |
Date |
2002-11-08 |
Time |
16:28 |
Rev Time |
0.00 |
Received By |
btrobaug |
Date |
2002-11-08 |
Time |
16:28 |
Sent To |
B |
|
Notes |
2002-11-08 00:00:00 | TO HAROLD P./WRT. |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
15 |
Status |
P |
Date |
2004-03-17 |
|
|
Cont ID |
|
Sent By |
pkrauss |
Date |
2004-03-17 |
Time |
06:51 |
Rev Time |
0.00 |
Received By |
pkrauss |
Date |
2004-03-08 |
Time |
08:17 |
Sent To |
|
|
Notes |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
14 |
Status |
P |
Date |
2004-01-20 |
|
|
Cont ID |
|
Sent By |
pkrauss |
Date |
2004-01-20 |
Time |
09:32 |
Rev Time |
1.20 |
Received By |
pkrauss |
Date |
2004-01-20 |
Time |
09:11 |
Sent To |
|
|
Notes |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
13 |
Status |
P |
Date |
2003-11-24 |
|
|
Cont ID |
|
Sent By |
pkrauss |
Date |
2003-11-24 |
Time |
10:14 |
Rev Time |
0.45 |
Received By |
pkrauss |
Date |
2003-11-24 |
Time |
09:57 |
Sent To |
|
|
Notes |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
12 |
Status |
P |
Date |
2003-11-04 |
|
|
Cont ID |
|
Sent By |
pkrauss |
Date |
2003-11-04 |
Time |
12:24 |
Rev Time |
1.15 |
Received By |
pkrauss |
Date |
2003-11-04 |
Time |
12:23 |
Sent To |
|
|
Notes |
2003-11-04 00:00:00 | UNIT REVISIONS |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
11 |
Status |
P |
Date |
2003-10-15 |
|
|
Cont ID |
|
Sent By |
pkrauss |
Date |
2003-10-15 |
Time |
12:05 |
Rev Time |
0.45 |
Received By |
pkrauss |
Date |
2003-10-15 |
Time |
12:05 |
Sent To |
|
|
Notes |
2003-10-15 00:00:00 | SUBMITTAL - THE FLAMEBAR DUCT ON FOR | | THE SMOKE EXHAUST FOR THE LOBBY AREA. |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
10 |
Status |
P |
Date |
2003-10-07 |
|
|
Cont ID |
|
Sent By |
pkrauss |
Date |
2003-10-07 |
Time |
12:24 |
Rev Time |
0.40 |
Received By |
pkrauss |
Date |
2003-10-07 |
Time |
12:24 |
Sent To |
|
|
Notes |
2003-10-07 00:00:00 | SHOP DRAWING OF THE FLAMEBAR DUCT FOR | | THE SMOKE EVAC IN THE LOBBY AREA. |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
9 |
Status |
P |
Date |
2003-09-18 |
|
|
Cont ID |
|
Sent By |
pkrauss |
Date |
2003-09-18 |
Time |
07:25 |
Rev Time |
2.50 |
Received By |
pkrauss |
Date |
2003-09-18 |
Time |
07:25 |
Sent To |
|
|
Notes |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
8 |
Status |
P |
Date |
2003-09-04 |
|
|
Cont ID |
|
Sent By |
pkrauss |
Date |
2003-09-04 |
Time |
11:47 |
Rev Time |
0.35 |
Received By |
pkrauss |
Date |
2003-09-04 |
Time |
11:47 |
Sent To |
|
|
Notes |
2003-09-04 00:00:00 | SUBMITTALS FOR SF-3 (ADDED TO LOBBY) | | AND BRAIDED HOSES FOR HEAT PUMPS |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
7 |
Status |
P |
Date |
2003-07-14 |
|
|
Cont ID |
|
Sent By |
pkrauss |
Date |
2003-07-14 |
Time |
10:16 |
Rev Time |
0.35 |
Received By |
pkrauss |
Date |
2003-07-14 |
Time |
10:16 |
Sent To |
|
|
Notes |
2003-07-14 00:00:00 | PROVISO: | | | | ADDITIONAL PERMIT REQUIRED FOR THE FUEL | | OIL. PLEASE PROVIDE PLANS & MANUFACTURER | | SUBMITTAL DATA FOR TANKS, PIPING AND | | EQUIPMENT PERTAINING TO THE FUEL OIL. | | | | IF YOU HAVE ANY QUESTIONS, PLEASE | | CONTACT PATTY KRAUSS AT (561) 805-6719. |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
6 |
Status |
P |
Date |
2003-04-14 |
|
|
Cont ID |
|
Sent By |
shernand |
Date |
2003-05-02 |
Time |
17:52 |
Rev Time |
4.14 |
Received By |
pkrauss |
Date |
2003-04-14 |
Time |
10:10 |
Sent To |
|
|
Notes |
2003-04-14 00:00:00 | MECHANICAL REVISION PERMIT 01101289 | | | | PLAN SHEETS AC-2 THROUGH AC-4A & AC-7 | | THROUGH AC-9, ARE ALL APPROVED. | | | | AC-1 & AC-10 PENDING APPROVAL, NOT | | STAMPED DUE TO SUBMITTAL OF ALTERNATE | | METHODS.COMMENT "ALL CEILINGS ARE A | | SMOKE EVAC PLENUM NO COMB. MAT. ARE | | ALLOWED", PLEASE CLARIFY. | | | | PLAN SHEET AC-1A IS NOT SIGNED & SEALED | | BY ENGINEER, COPY SUBMITTED. | | | | PLAN SHEET AC-5, PLEASE CLARIFY THE | | BOTTOM ELEVATION OF EF-6 & THE TOP | | ELEVATION OF THE FLD IN THE ELECTRICAL | | ROOMS.(DISTANCE BETWEEN EXHAUST & | | LOUVERED DOOR IS LESS THAN 10 FT, WILL | | THE EXHAUST TERMINATION BE 2 FT ABOVE | | LOUVERED DOOR?). INDICATE WHAT WILL BE | | STORED IN POOL EQUIP & FOUNTAIN ROOMS. | | | | IF YOU HAVE ANY QUESTIONS, PLEASE | | CONTACT PATTY KRAUSS AT (561) 805-6719. |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
5 |
Status |
|
Date |
2003-03-31 |
|
|
Cont ID |
|
Sent By |
pkrauss |
Date |
2003-03-31 |
Time |
15:51 |
Rev Time |
0.35 |
Received By |
pkrauss |
Date |
2003-03-31 |
Time |
15:51 |
Sent To |
|
|
Notes |
2003-03-31 00:00:00 | SUBMITTAL FOR LOBBY - CHANGE FROM SMOKE | | EVAC TO A SMOKE CONTROL. |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
4 |
Status |
P |
Date |
2002-08-07 |
|
|
Cont ID |
|
Sent By |
pkrauss |
Date |
2002-08-07 |
Time |
07:16 |
Rev Time |
0.40 |
Received By |
pkrauss |
Date |
2002-08-07 |
Time |
07:15 |
Sent To |
|
|
Notes |
2002-08-07 00:00:00 | APPROVED 8/2/02 |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
3 |
Status |
F |
Date |
2002-06-26 |
|
|
Cont ID |
|
Sent By |
pkrauss |
Date |
2002-06-26 |
Time |
14:44 |
Rev Time |
0.50 |
Received By |
pkrauss |
Date |
2002-06-26 |
Time |
14:44 |
Sent To |
|
|
Notes |
2002-06-26 00:00:00 | REFERENCE RESPONSE LETTER DATED JUNE | | 12, 2002. | | | | RESPONSE TO COMMENT #1: A 2 HR ENCLOSURE | | WILL BE PROVIDED.SEE ARCHITECTURAL | | PLANS SHEET A-6.02 FOR 2 HR ENCLOSURE. | | | | PLAN SHEET A-6.02-INDICATE STAIR RISER | | & STAIR DETAIL, NO 2 HR ENCLOSURE | | SHOWN.PLEASE REVISE MECHANICAL PLANS | | WITH ANOTE INDICATING DUCT TO BE IN A | | RATED SHAFT PLEASE PROVIDE HR RATING. | | PLEASE REMOVE FIRE DAMPERS ON DUCT | | THAT IS TO BE IN THE SHAFT. | | | | RESPONSE TO COMMENT 2B: A DRYER BOOSTER | | FAN HAS BEEN ADDED TO ALL DRYERS. | | | | PLEASE NOTE SHOULD THE BOOSTER FAN BE | | USED ON THE DRYER EXHAUST A MEANS OF | | NOTIFICATION TO THE OWNER/TENANT WILL | | BE REQUIRED SHOULD THE BOOSTER FAN | | FAIL. | | | | RESPONSE TO COMMENT #4: AXUILIARY DRAIN | | PANS WILL BE PROVIDED FOR ALL HORIZONTAL | | HEAT PUMPS. SEE INSTALLATION DETAILS ON | | SHEET AC-6. | | | | INDICATE ON THE PLAN WHAT WILL SERVE | | AS PROTECTION FOR THE VERTICAL UNITS | | SHOULD THE PRIMARY DRAIN BE RESTRICTED | | | | IF YOU HAVE ANY QUESTIONS, PLEASE | | CONTACT PATTY KRAUSS AT 659-8096 | | EXT. 8388. |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
2 |
Status |
F |
Date |
2002-04-05 |
|
|
Cont ID |
|
Sent By |
pkrauss |
Date |
2002-04-05 |
Time |
10:15 |
Rev Time |
0.00 |
Received By |
pkrauss |
Date |
2002-04-04 |
Time |
14:46 |
Sent To |
|
|
Notes |
2002-04-05 00:00:00 | | | | | 1.PLEASE CLARIFY REVISED PLAN SHEET | | AC-1,EXHAUST DUCT PENETRATES LOBBY | | FLOOR & FIRST FLOOR.PLANS INDICATE | | FIRE DAMPERS AT EACH PENETRATION. | | PLAN SHEET AC-1 LOBBY LEVEL SHOWS | | TOILET EXHAUST TERMINATING ON THIRD | | FLOOR WITH FIRE DAMPERS AT FLOOR | | PENETRATIONS.AS PER 1997 SMC 610.4 | | DUCTS EXTENDING THROUGH MORE THAN | | ONE FLOOR SHALL BE PROTECTED BY A | | SHAFT ENCLOSURE. ALSO PLAN SHEET | | AC-3 6" EXHAUST DUCT DOWN, NO FIRE | | DAMPER OR SHAFT INDICATED. | | | | 2.DRYER & TOILET EXHAUST TERMINATING | | AT THE BALCONY.THIS CAN ONLY BE | | APPROVED IF THIS AREA IS OPEN TO THE | | OUTDOORS.NO SCREEN ENCLOSURE OR | | SLIDING GLASS DOORS PERMITTED. | | AS PER 1997 SMC 501.3, THE AIR | | REMOVED BY EVERY MECHANICAL EXHAUST | | SYSTEM SHALL BE DISCHARGED OUTDOORS | | AT A POINT WHERE IT WILL NOT CAUSE | | A NUISANCE. | | | | PLEASE NOTE DRYER EXHAUST SHALL BE | | A MINIMUM OF 4".THE MAXIMUM LENGTH | | SHALL BE 25 FT FROM DRYER LOCATION | | TO WALL CAP.5 FT DEDUCTION FOR | | EACH 90 DEGREE RAD. & 2 1/2 FT FOR | | EACH 45 DEGREE RAD. | | | | 3.TESTING FOR STAIRWELL PRESSURIATION | | SHALL BE PREFORMED BY INDEPENDENT | | TEST & BALANCE COMPANY. TEST WILL | | CHECK PRESSURE DIFFERENTIAL WITH ALL | | DOORS CLOSED & WITHTHE DOOR AT | | LOWER LEVEL PROPPED OPEN AT APPROX. | | 4" TO SIMILATE EXITING DURING AN | | EMERGENCY SITUATION. | | | | 4.PLEASE NOTE AUXILIARY DRAIN PANS | | WITH OVERFLOW PROTECTION BY MEANS OF | | A FLOAT SWITCH OR SEPARATE DRAIN | | LINE TERMINATING AT A CONSPICUOUS | | POINT AS PER 1997 SMC 304.8.6.1. | | | | IF YOU HAVE ANY QUESTIONS, PLEASE | | CONTACT PATTY KRAUSS AT 659-8096 | | EXT. 8388. |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
1 |
Status |
F |
Date |
2001-11-07 |
|
|
Cont ID |
|
Sent By |
pkrauss |
Date |
2001-11-07 |
Time |
14:06 |
Rev Time |
8.00 |
Received By |
pkrauss |
Date |
2001-11-05 |
Time |
14:21 |
Sent To |
|
|
Notes |
2001-11-07 00:00:00 | *******************DENIED*************** | | | | | | PLEASE PROVIDE THE FOLLOWING INFORMATION | | FOR REVIEW. | | | | 1.PROVIDE MANUFACTURE SUBMITTAL DATA | | FOR ALL EQUIPMENT. | | | | 2.PROVIDE OUTSIDE AIR CALCULATIONS AS | | PER ASHRAE 62-89. | | | | 3.AIR BALANCE SCHEDULE SHOWING | | COMPLIANCE WITH 1997 SMC 501.2. | | | | 4.PROVIDE VENTILATION CALCULATIONS | | FOR THE GARAGE SHOWING COMPLIANCE | | WITH 1997 SBC 411.4.2 & 411.5.3 | | | | 5.INDICATE SMOKE EVACUATION ON PLAN | | FOR THE LOBBY AND COMMON AREAS USED | | FOR EGRESS ON RESIDENTIAL FLOORS. | | | | 6.PROVIDE SEQUENCE OF OPERATION FOR | | SMOKE EVACUATION FOR LOBBY AREA AS | | WELL AS COMMON AREAS TO EACH FLOOR. | | | | 7.TEST CRITERIA FOR SMOKE EVACUATION. | | | | 8.PROVIDE STAIRWELL PRESSURIZATION | | CALCULATIONS. | | | | 9.INDICATE ON PLAN DRYER EXHAUST. | | PROVIDE DETAIL OF RISER. | | | | 10.CLARIFY LOBBY AREA RESIDENTIAL | | ENTRANCE AND PLAN SHEET AC-2 "OPEN | | TO BELOW".IS THIS AN "ATRIUM"? | | | | 11.PROVIDE INFORMATION ON THE | | EMERGENCY GENERATOR. | | | | IF YOU HAVE ANY QUESTIONS, PLEASE | | CONTACT PATTY KRAUSS AT 659-8096 | | EXT. 8388. |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
24 |
Status |
P |
Date |
2004-03-22 |
|
|
Cont ID |
|
Sent By |
kstevens |
Date |
2004-03-22 |
Time |
08:16 |
Rev Time |
0.50 |
Received By |
kstevens |
Date |
2004-03-22 |
Time |
08:16 |
Sent To |
|
|
Notes |
2004-03-22 00:00:00 | REVISION OK - IRRIGATION CONTROLLER BOX | | LOCATION CHANGE |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
23 |
Status |
P |
Date |
2004-03-20 |
|
|
Cont ID |
|
Sent By |
kstevens |
Date |
2004-03-20 |
Time |
13:06 |
Rev Time |
0.50 |
Received By |
kstevens |
Date |
2004-03-20 |
Time |
13:06 |
Sent To |
|
|
Notes |
2004-03-20 00:00:00 | REVISION OK - SHTS A2.06 & A3.03 |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
22 |
Status |
P |
Date |
2004-03-20 |
|
|
Cont ID |
|
Sent By |
kstevens |
Date |
2004-03-20 |
Time |
13:02 |
Rev Time |
0.50 |
Received By |
kstevens |
Date |
2004-03-20 |
Time |
13:02 |
Sent To |
|
|
Notes |
2004-03-20 00:00:00 | REVISION FOR SHT P-3 - ADDED SCUPPERS |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
21 |
Status |
P |
Date |
2004-03-16 |
|
|
Cont ID |
|
Sent By |
kstevens |
Date |
2004-03-16 |
Time |
18:14 |
Rev Time |
0.25 |
Received By |
kstevens |
Date |
2004-03-16 |
Time |
18:14 |
Sent To |
|
|
Notes |
2004-03-16 00:00:00 | SUBMITTAL OK - ADA HI/LOW DRINKING | | FOUNTAIN |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
20 |
Status |
P |
Date |
2004-03-13 |
|
|
Cont ID |
|
Sent By |
kstevens |
Date |
2004-03-13 |
Time |
07:14 |
Rev Time |
0.50 |
Received By |
kstevens |
Date |
2004-03-13 |
Time |
07:14 |
Sent To |
|
|
Notes |
2004-03-13 00:00:00 | REVISION OK - SHT P-16 REMOVE POOL TREN- | | CH DRAIN AND ADD 2 DECK DRAINS |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
19 |
Status |
P |
Date |
2004-03-12 |
|
|
Cont ID |
|
Sent By |
kstevens |
Date |
2004-03-12 |
Time |
08:26 |
Rev Time |
0.25 |
Received By |
kstevens |
Date |
2004-03-12 |
Time |
08:26 |
Sent To |
|
|
Notes |
2004-03-12 00:00:00 | SUBMITTAL OK - P-TRAPS, WASTE & O/F |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
18 |
Status |
P |
Date |
2004-03-10 |
|
|
Cont ID |
|
Sent By |
kstevens |
Date |
2004-03-10 |
Time |
18:46 |
Rev Time |
4.00 |
Received By |
kstevens |
Date |
2004-03-10 |
Time |
18:46 |
Sent To |
|
|
Notes |
2004-03-10 00:00:00 | REVISION OK - SHTS P-1, P-3, P-4, P-4A, | | P-6, P-14, P-15, & P-16 |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
17 |
Status |
P |
Date |
2004-02-12 |
|
|
Cont ID |
|
Sent By |
kstevens |
Date |
2004-02-12 |
Time |
10:47 |
Rev Time |
1.00 |
Received By |
kstevens |
Date |
2004-02-12 |
Time |
10:47 |
Sent To |
|
|
Notes |
2004-02-12 00:00:00 | AS BUILTS |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
16 |
Status |
F |
Date |
2004-01-17 |
|
|
Cont ID |
|
Sent By |
kstevens |
Date |
2004-01-17 |
Time |
08:15 |
Rev Time |
5.50 |
Received By |
kstevens |
Date |
2004-01-17 |
Time |
08:15 |
Sent To |
|
|
Notes |
2004-01-17 00:00:00 | REVISION DENITE | | REFERENCE: SPC-94 | | | | 1) SHT P-5 COOLING TOWER OVERFLOW SHALL | | DRAIN INTO THE STORM SYSTEM NOT THE | | SANITARY SYSTEM. | | 2) SHT P-11 SANITARY RISERS NUMBERS 6, | | AND 7. OFF SET VENTS REQUIRED PER SECT- | | ION 917. | | 3) SHT P-12 SANITARY RISERS NUMBERS 8, | | 11, 22, 23, 26, AND 28. OFFSET VENTS ARE | | REQUIRED PER SECTION 917. | | | | REVIEW BY KEN STEVENS | | (561) 805-6721 | | FAX (561) 653-2692 | | E-MAIL [email protected] |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
15 |
Status |
P |
Date |
2003-12-05 |
|
|
Cont ID |
|
Sent By |
kstevens |
Date |
2003-12-05 |
Time |
18:08 |
Rev Time |
1.00 |
Received By |
kstevens |
Date |
2003-12-05 |
Time |
18:08 |
Sent To |
|
|
Notes |
2003-12-05 00:00:00 | REVISION OK - SHTS 8C7 & 8C8 |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
14 |
Status |
P |
Date |
2003-11-01 |
|
|
Cont ID |
|
Sent By |
kstevens |
Date |
2003-11-01 |
Time |
16:36 |
Rev Time |
1.50 |
Received By |
kstevens |
Date |
2003-11-01 |
Time |
16:36 |
Sent To |
|
|
Notes |
2003-11-01 00:00:00 | REVISIONS OK - UNIT REVISIONS |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
13 |
Status |
F |
Date |
2003-08-14 |
|
|
Cont ID |
|
Sent By |
kstevens |
Date |
2003-08-14 |
Time |
11:23 |
Rev Time |
0.50 |
Received By |
kstevens |
Date |
2003-08-14 |
Time |
11:23 |
Sent To |
|
|
Notes |
2003-08-14 00:00:00 | SUBMITTAL DENIED - SUBMITTAL DOES NOT | | SHOW COMPLIANCE WITH APPROVED STANDARD | | FOR FITTINGS. SECTION 303.4 | | | | REVIEW BY KEN STEVENS | | (561) 805-6721 | | FAX (561) 653-2692 | | E-MAIL [email protected] |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
12 |
Status |
F |
Date |
2003-07-21 |
|
|
Cont ID |
|
Sent By |
kstevens |
Date |
2003-07-21 |
Time |
15:27 |
Rev Time |
10.00 |
Received By |
kstevens |
Date |
2003-07-19 |
Time |
17:16 |
Sent To |
|
|
Notes |
2003-07-21 00:00:00 | DENIED | | REFERENCE: SPC-94 | | FACBC-97 | | FHA-AMEND 98 DESIGN MANUAL | | | | 1) SHT P-1 NOT SIGNED, SEALED, & DATED. | | 2) SHT P-1A IS THIS A REVISION FOR ALL | | TYPICAL "B" UNITS OR FOR A SPECIFIC UNIT | | 3) SHT P-4 NOT SIGNED, SEALED, & DATED. | | 4) SHT P-7 NOT SIGNED, SEALED, & DATED. | | 5) SHT P-7A NOT SIGNED, SEALED, & DATED. | | 5) SHT P-7B NOT SIGNED, SEALED, & DATED. | | 6) SHT P-9 NOT SIGNED, SEALED, & DATED. | | 7) SHT P-10 NOT SIGNED, SEALED, & DATED. | | 8) SHT P-11 NOT SIGNED, SEALED, & DATED. | | 9) SHT P-11 OFFSETS FOR STACKS 1, 4, 5, | | 6, A RELIEF VENT FOR THE OFFSET SHALL BE | | INSTALLED AS PROVIDED IN CHAPTER 9 AND | | IN NO CASE SHALL A HORIZONTAL BRANCH | | CONNECT WITHIN THE OFFSET OR WITHIN 2FT | | ABOVE OR BELOW THE OFFSET. THE RELIEF | | VENTS SHALL COMPLY WITH SECTIONS 917, | | 917.1, 917.2 & 917.3. - SEC 715.4(4) | | 10) SHT P-11A NOT SIGNED, SEALED, & DAT- | | ED. RISERS #11, 13, & 18. OFFSET VENTS | | REQUIRED SEC. 917 & ALL SUBSECTIONS. EX- | | TRA FIXTURE UNITS NOT REFLECTED ON RISER | | DIAGRAM. | | 11) SHT P-12 RISERS 22, 23, 28, & 26 - | | OFFSET RELIEF VENTS REQUIRED PER SECTION | | 917. ALSO SEE SECTION 715.4(4). | | 12) SHT P-15 NOT SIGNED, SEALED, & DATED | | | | REVIEW BY KEN STEVENS | | (561) 805-6721 | | FAX (561) 653-2692 |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
11 |
Status |
F |
Date |
2003-08-14 |
|
|
Cont ID |
|
Sent By |
kstevens |
Date |
2003-08-14 |
Time |
10:48 |
Rev Time |
1.50 |
Received By |
kstevens |
Date |
2003-07-12 |
Time |
15:09 |
Sent To |
|
|
Notes |
2003-08-14 00:00:00 | SUBMITTALS DENIED | | | | WASTE & OVERFLOWS, P-TRAPS, & BASKET | | STRAINERS NOT SHOWING COMPLIANCE TO | | STANDARDS FOR THESE PLUMBING FITTINGS. | | | | REVIEW BY KEN STEVENS | | (561) 805-6721 | | FAX (561) 653-2692 | | E-MAIL [email protected] |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
10 |
Status |
P |
Date |
2003-05-27 |
|
|
Cont ID |
|
Sent By |
kstevens |
Date |
2003-05-27 |
Time |
14:01 |
Rev Time |
1.00 |
Received By |
kstevens |
Date |
2003-05-27 |
Time |
14:00 |
Sent To |
Z |
|
Notes |
2003-05-27 00:00:00 | IRRIGATION SUBMITTALS OK - |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
9 |
Status |
P |
Date |
2003-05-10 |
|
|
Cont ID |
|
Sent By |
kstevens |
Date |
2003-05-10 |
Time |
07:42 |
Rev Time |
0.75 |
Received By |
kstevens |
Date |
2003-05-10 |
Time |
07:41 |
Sent To |
|
|
Notes |
2003-05-10 00:00:00 | SUBMITTALS - OK - SUBJECT TO 303.4 SPC |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
8 |
Status |
F |
Date |
2003-04-26 |
|
|
Cont ID |
|
Sent By |
shernand |
Date |
2003-05-02 |
Time |
17:53 |
Rev Time |
9.50 |
Received By |
kstevens |
Date |
2003-04-25 |
Time |
17:56 |
Sent To |
|
|
Notes |
2003-04-25 00:00:00 | DENIED | | REFERENCE: SPC-94 | | | | 1) SHT P-1A ALL REVISED SHEET SHALL BE | | SIGNED AND SEALED. SEAL IS A COPY AND | | NOT RAISED. | | 2) SHT P-2 NO REVISIONS INDICATED. | | STAMPED SET DATED 6-5-2 SHOWS REVISION | | #3 TRIANGLE. LATEST REVISION DATED 1-23- | | 3 SHOWS #3 TRINAGLE ALSO. PLEASE CLAIRFY | | 3) SHT P-3 4" HUB DRAIN NOT APPROVED. | | FLOOR SINK IS REQUIRED FOR ALL INDIRECT | | WASTE. PLEASE INDICATE WHAT IS BEING | | DRAINED INTO HUB DRAIN. | | 4) SHT P-4 TRIANGLE #4. NO CHANGES IN- | | DICATED FOR THIS REVISION. PLEASE CLAIR- | | FY. | | 5) P-4A LEVEL 11, PLEASE CLOUD AND DART | | ALL REVISIONS. MANY CHANGES FROM STAMPED | | SET NOT CLOUDED. THERE ARE TWO #3 TRI- | | ANGLES. PLEASE CLAIRFY. NO #6 TRIANGLE | | 6) SHT P-4A INDICATE WHERE ELIMINATED | | 3" RWL ARE BEING REROUTED TO. NO TRI- | | ANGLE #6 SHOWN ON REVISION SECTION.?? | | 7) PLEASE SHOW ALL REVISIONS ON REVISION | | SECTION AND CLOUD ALL CHANGES ON ALL | | SHEETS. REVISIONS ARE VAGUE AND UNCLEAR. | | BACKFLOW REQUIRED FOR NOTE #4 | | 8) SHT P-7B NEW UNIT BC COMBO, SANITARY | | RISER AND WATER RISER DIAGRAM REQUIRED. | | SPECIFICATION "A" OR "B" AND CLEAR FLOOR | | SPACE TO BE SHOWN ON PLANS. | | 9) SHT P-8B NEW UNIT F, SANITARY RISER | | AND WATER RISER DIAGRAM REQUIRED. SPECI- | | FICATION "A" OR "B" AND CLEAR FLOOR | | SPACE TO BE SHOWN ON PLANS. | | 10) NOTE: ALL CHANGES TO THE SANITARY, | | STORM, OR WATER SYSTEMS SHALL BE REFLEC- | | TED ON THE RISER DIAGRAM OF THE SYSTEM | | BEING REVISED. PLEASE REVISE RISER DIA- | | GRAMS | | 11) NOTE: REVISION NUMBERS SHALL MATCH | | MATCH NUMBERS STATED AS REVISIONS. SOME | | SHEETS SHOW REVISION THAT THERE IS NO | | NUMBER FOR. SOME SHEETS SHOW A NUMBERED | | REVISION AND NO CHANGE IS FOUND. PLEASE | | CLAIRFY. | | 12) CHANGES TO STRUCTURAL SHEETS S-1 AND | | S-2 INDICATE TRENCH DRAINS ADDED TO THE | | LOWER RAMP, AND AT NORTH ENTRANCE AT THE | | LOBBY LEVEL. THESE REVISIONS ARE NOT | | SHOWN ON THE PLUMBING SHEETS. PLEASE | | INDICATE HOW THESE WILL BE PIPED AND | | WHAT PLUMBING SHEETS THESE REVISIONS | | WILL BE ADDRESSED ON. ALSO INDICATE ON | | THE RISER THESE REVISIONS. | | | | REVIEW BY KEN STEVENS | | (561) 659-8096 EXT 8377 | | (561) 805-6721 | | FAX (561) 653-2692 |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
7 |
Status |
P |
Date |
2002-11-02 |
|
|
Cont ID |
|
Sent By |
kstevens |
Date |
2002-11-02 |
Time |
15:16 |
Rev Time |
0.50 |
Received By |
kstevens |
Date |
2002-11-02 |
Time |
15:15 |
Sent To |
|
|
Notes |
2002-11-02 00:00:00 | SUBMITTAL - BACKWATER VALVE - ELEVATOR | | SUMP PUMP - CONDENSATE SUMP PUMP |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
6 |
Status |
P |
Date |
2002-08-17 |
|
|
Cont ID |
|
Sent By |
kstevens |
Date |
2002-08-17 |
Time |
14:13 |
Rev Time |
0.00 |
Received By |
kstevens |
Date |
2002-08-17 |
Time |
14:13 |
Sent To |
|
|
Notes |
2002-08-17 00:00:00 | SUBMITTALS OK - INSULATION AND STAND |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
5 |
Status |
P |
Date |
2002-08-08 |
|
|
Cont ID |
|
Sent By |
kstevens |
Date |
2002-08-08 |
Time |
13:15 |
Rev Time |
0.00 |
Received By |
kstevens |
Date |
2002-08-08 |
Time |
13:15 |
Sent To |
|
|
Notes |
2002-08-08 00:00:00 | SUBMITTAL OK - DRAINS, CORRUGATED PIPE, | | FILTER FABRIC, PIPE /STORM SANT COND, | | DOM. H2O, FUEL OIL. HANGERS, GARAGE SUMP | | PUMP. |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
4 |
Status |
P |
Date |
2002-08-02 |
|
|
Cont ID |
|
Sent By |
kstevens |
Date |
2002-08-02 |
Time |
16:26 |
Rev Time |
0.00 |
Received By |
kstevens |
Date |
2002-08-02 |
Time |
16:26 |
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
3 |
Status |
F |
Date |
2002-07-15 |
|
|
Cont ID |
|
Sent By |
kstevens |
Date |
2002-07-15 |
Time |
10:20 |
Rev Time |
0.00 |
Received By |
kstevens |
Date |
2002-07-08 |
Time |
17:42 |
Sent To |
|
|
Notes |
2002-07-15 00:00:00 | DENIED | | REFERENCE: FBC-2001 PLUMBING | | FHA AMEND-98 DESIGN MANUAL | | | | 1) PER CLAIRFICATION FROM FAIR HOUSING, | | PROGRAMS BRANCH CHIEF, DIANE COOK LEE | | (305) 536-4479 X 2213, THE VANITY CABIN- | | ET FOR ALL "B" UNITS ON SHTS A3.04, | | A3.05 & A3.06 SHALL BE REMOVABLE. PLEASE | | SHOW ON DETAILS. | | | | REVIEW BY KEN STEVENS | | (561) 659-8096 EXT 8377 |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
2 |
Status |
F |
Date |
2002-04-20 |
|
|
Cont ID |
|
Sent By |
kstevens |
Date |
2002-04-20 |
Time |
15:57 |
Rev Time |
0.00 |
Received By |
kstevens |
Date |
2002-04-20 |
Time |
15:57 |
Sent To |
|
|
Notes |
2002-04-20 00:00:00 | DENIED | | REFERENCE: SPC-94 - FHA-24 CODE OF REGU- | | LATION (CFR) 100.205 | | (C)(IV) DESIGN MAN. | | | | 1) FROM PREVIOUS REVIEW, SHOW CLEAR | | FLOOR SPACE FOR ALL BATHROOMS AND KIT. | | FIXTURES PER DESIGN MANUAL. | | 2) FROM PREVIOUS REVIEW, SHT L3.02,04. | | COMMENT ASKED TO SHOW PREVENTER LOCATION | | FOR WATER FEATURE, REPLY SAID NOTE WAS | | ADDED. PLEASE SHOW WHERE BACKFLOW WILL | | BE LOCATED. | | 3) FROM PREVIOUS REVIEW, SHT P1,6 SHOW | | LOCATION OF BACK FLOW PREVENTERS, UNABLE | | TO FIND LOCATION FOR WATER FEATURES AND | | COOLING TOWER. | | 4) FROM PREVIOUS REVIEW SHT P-11 VERTI- | | CAL SANITARY RISERS #5,#13 SEC 911 WET | | VENTS, NO MORE THAN 4 FIXTURE UNITS ON A | | 2" WET VENT. PLEASE RECHECK THESE RISERS | | 5) SECONDARY ROOF DRAINS????????? |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
F |
Date |
2001-11-04 |
|
|
Cont ID |
|
Sent By |
pschmitz |
Date |
2001-11-04 |
Time |
07:29 |
Rev Time |
0.00 |
Received By |
pschmitz |
Date |
2001-11-04 |
Time |
11:37 |
Sent To |
|
|
Notes |
2001-11-04 00:00:00 | PLUMBING PLAN REVIEW,DENIED | | CODE REFERENCES,STD PLUMBING CODE-94. | | FAIR HOUSING ACT 24 CODE OF REGULATION, | | (CFR) 100.205 (C) (IV) DESIGN MANUAL. | | (1) SHT 8A.03 COMPLY WITH FHA CFR-24,AS | | LAID OUT IN THE DESIGN MANUAL, SPECIFY | | OPTION A OR B. REQUIRMENTS 1 THRU 7,SHOW | | MANEUVERING AND CLEAR FLOOR SPACE ALSO | | GRAB BAR REINFOFCEMENT/"DESIGN MANUAL". | | (2) SHT L3.02,04 DETAIL(11), WATER FEA- | | TURE, SHOW LOCATION OF REQUIRED BACK | | FLOW PREVENTER FOR WATER SUPPLY SEC 606 | | (3) SHT IR6.02,03,04 IRRIGATION WATER | | SUPPLY,BACK FLOW PREVENTER LOCATION. | | (4) SHT P1,6 SHOW LOCATION OF BACK FLOW | | PREVENTERS,FOR FLUSHING RING, COOLING | | TOWERS, WATER FEATURES, SWIMMING POOL, | | AND FOUNTAIN WATER SUPPLY,SEC 606. | | (5A SHT P9 AIR CHAMBERS, COMPLY WITH | | SEC 607.8.3, ACCESSIBLE AND RECHARGEABLE | | (B) WATER HAMMER ARRESTORS SEC 607.8.2 | | COMPLY WITH PDI-WH201,ASSE 1010, INSTALL | | PER MFG. FOR SIZE AND PLACEMENT. | | (6) SHT P9, NOTE(1) RP1-1 COMPLY WITH | | FL ENERGY CODE-97 SEC 412.1.ABCD.4 HOT | | WATER PIPING INSULATION TAB 4-11. | | (7) SHT P-10 RVD RISER DIAGRAM, COMPLY | | W/CITY OWPBMCW AMEND SPC-94,SEC507.6.1-2 | | 3/4"RVD DRAIN UP TO 150,000 BTU'S. | | PROVIDE CALCULATIONS FOR 3/4" RVD, SIZE. | | (8) SHT P-11 VERTIAL SANITARY RISERS,#1, | | #5,#13, SEC 911 WET VENTS, NO MORE THAN | | 4 FIXTURE UNITS ON A 2" WET VENT. | | (9) SHT P-12 VERTICAL SANITARY RISERS, | | #18,#21, SEC 916 RELIEF VENTS- STACKS OF | | 10 OR MORE BRANCH INTERVALS,REQUIRE | | RELIEF VENTS. | | (10) SHT P-13 DETAIL OF OIL INTERCEPTOR | | REFERENCE TO SFBC, CURRENT CODE SPC-94 | | SEC 1004.5, NOTE #19. | | (14) SHT P-13,SEC 104.3 EXAMINATION OF | | DOUCMENTS, PROVIDE SHOP DRAWINGS OF ALL | | PLUMBING FIXTURES AND EQUIPMENT. | | (15)SHT P-10 SEC 504 MINIMUM CAPICITY OF | | WATER HEATERS, COMPLY WITH TAB 505. | | (16) SHT A2.12,A7.02,SEC 1109 SECONDARY | | (EMERGENCY) SCUPPER DRAINS,PROVIDE CALCU | | LATIONS,INCLUDE 1/2 THE VERTICAL WALLS, | | SHOW SIZE AND LOCATION. | | END OF COMMENTSPAUL SCHMITZ | | QUESTIONS561-659- 8096X8233 |
|
|
Review Stop |
Z |
ZONING |
Rev No |
6 |
Status |
N |
Date |
2004-03-23 |
|
|
Cont ID |
|
Sent By |
mmclean |
Date |
2004-03-23 |
Time |
10:18 |
Rev Time |
0.00 |
Received By |
mmclean |
Date |
2004-03-23 |
Time |
10:18 |
Sent To |
|
|
Notes |
2004-03-23 00:00:00 | NO ZONING REQUIRED, PER ANA APONTE |
|
|
Review Stop |
Z |
ZONING |
Rev No |
5 |
Status |
P |
Date |
2004-02-25 |
|
|
Cont ID |
|
Sent By |
aaponte |
Date |
2004-02-25 |
Time |
16:36 |
Rev Time |
0.50 |
Received By |
aaponte |
Date |
2004-02-25 |
Time |
16:36 |
Sent To |
|
|
Notes |
2004-02-25 00:00:00 | PROVISO: WASHINGTONIA ROBUSTA PALMS | | SHOULD BE INSTALLED ON DATURA STREET | | TO MATCH EXISTING STREETSCAPE. |
|
|
Review Stop |
Z |
ZONING |
Rev No |
4 |
Status |
P |
Date |
2003-08-13 |
|
|
Cont ID |
|
Sent By |
lmartine |
Date |
2003-08-13 |
Time |
15:09 |
Rev Time |
1.00 |
Received By |
lmartine |
Date |
|
Time |
|
Sent To |
|
|
Notes |
2003-08-13 00:00:00 | REVISIONS APPROVED BY DANA LITTLE ON | | 8/12/03 |
|
|
Review Stop |
Z |
ZONING |
Rev No |
3 |
Status |
P |
Date |
2003-05-28 |
|
|
Cont ID |
|
Sent By |
sthyng |
Date |
2003-05-28 |
Time |
08:41 |
Rev Time |
0.00 |
Received By |
sthyng |
Date |
2003-05-28 |
Time |
08:41 |
Sent To |
|
|
Notes |
2003-05-28 00:00:00 | ******PROVISO******** | | | | PER ANTHEA GIANNIOTES | | | | OPENINGS FOR LOUVERS ON SHEET A4.01 AND | | A4.12 SHOULD BE SQUARE OR VERTICAL AND | | IN PROPORTION. |
|
|
Review Stop |
Z |
ZONING |
Rev No |
2 |
Status |
P |
Date |
2002-07-29 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2003-03-10 |
Time |
12:53 |
Rev Time |
0.25 |
Received By |
sgraham |
Date |
|
Time |
|
Sent To |
|
|
Notes |
2002-07-30 00:00:00 | ARCHITECT WILL REVISIT GRILL SITUATION | | WITH URBAN DESIGN BEFORE THE C/O IS | | ISSUED AS PER J MINICOZZI | 2002-07-29 00:00:00 | APPROVED BY JOE MINICOZZI WITH THE | | FOLLOWING CONDITIONS: | | 1.THE LANDSCAPE ARCHITECT NEEDS TO SUB- | | MIT A PLAN FOR THE STREETSCAPES. IT THE | | UNDERSTANDING THAT IT WILL BE A | | SEPARATE APPLICATION. | | 2.THE ZONING APPROVAL FOR THE VARIANCE | | FOR THE GARAGE STATED THAT THE SEALED | | WINDOWS AT THE GARAGE MUST BE DETAILED | | TO MINIMIZE THE EMPTY BUILDING EFFECT. | | DETAILING SHALL BE THAT OF A WINDOW | | EFFECT. IN AN AGREEMENT WITH THE ARCH- | | ITECT, THE WINDOWS WERE SUPPOSED TO BE | | PAINTED TO GIVE A DARK LOOK TO THE | | WINDOWS. IN THE LAST REVISION, VENTS | | WERE ADDED TO THE WINDOWS TO ALLOW FOR | | GARAGE AIR CIRCULATION. THIS IS FINE, | | BUT THE VENTS SHOULD BE DETAILED AS | | WINDOWS, NOT JUST VENTS. THE ARCHITECT | | WILL FAX A DRAWING OF THE VENTS | | CAMOUFLAGED WITH MESH SCREEN IN FRONT | | OF THE VENT SYSTEM TO BETTER OBSCURE THE | | LOUVERS OF THE VENTS. |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
F |
Date |
2001-11-19 |
|
|
Cont ID |
|
Sent By |
sgraham |
Date |
2001-11-19 |
Time |
12:49 |
Rev Time |
0.50 |
Received By |
sgraham |
Date |
|
Time |
|
Sent To |
|
|
Notes |
2001-11-19 00:00:00 | 1. STOREFRONT GLAZING SHALL BE CLEAR. | | ON THE WINDOW SCHEDULE IN NOTE #3 ON A8 | | .04 IT DENOTES THE STOREFRONT GLAZING AS | | SOLARGREEN TINT. PLEASE VERIFY IT THIS | | IS CLEAR TO ALLOW VISIBILITY INTO THE | | STOREFRONT AND SUBMIT A SAMPLE OF THE | | GLAZING WITH TO THE CITY URBAN DESIGNER | | 2.LANDSCAPE PLAN SHEET L2.02 NEEDS TO | | BE MODIFFIED TO MATCH THE SITE CONTEXT. | | A. NARCISSUS PAVEMENTS AND LANDSCAPING | | SHALLMATCH DESIGN OF NARCISSUS TO THE | | NORTHIN PAVER BLOCK DESIGN, | | WASHINGTONIA PLACEMENT, TREE GRATES,ETC. | | B. DATURA LAANDSCAPE PLAN SHALL MATCH | | DATURA WITH SIMILAAR PAVEMENTS, TREES & | | GRATING TO THAT IS CURRENTLY ON DATURA. |
|
|