Plan Review Details - Permit 01100845
Plan Review Stops For Permit 01100845
Review Stop E ELECTRICAL
Rev No 1 Status P Date 2001-10-24 Cont ID  
Sent By dpalmer Date 2001-10-24 Time 18:08 Rev Time 0.00
Received By dpalmer Date 2001-10-24 Time 18:08 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2001-10-20 Cont ID  
Sent By hmoser Date 2001-10-20 Time 11:39 Rev Time 0.33
Received By hmoser Date 2001-10-20 Time 11:39 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2001-10-22 Cont ID  
Sent By kstevens Date 2001-10-22 Time 19:12 Rev Time 0.33
Received By kstevens Date 2001-10-22 Time 19:12 Sent To  
Notes
***NONE***

Review Stop R ROOF PLAN REVIEW
Rev No 2 Status P Date 2002-01-07 Cont ID  
Sent By rmcdouga Date 2002-01-07 Time 10:53 Rev Time 2.00
Received By rmcdouga Date   Time   Sent To  
Notes
2002-01-07 00:00:00************BUILDING PROVISO************
  
 1) A RECORDED COPY OF THE NOTICE OF
 COMMENCEMENT MUST BE SUBMITTED BEFORE A
 PERMIT CAN BE ISSUED.
  
 2) PROVIDE PRODUCT APPROVALS FOR
 HORIZONTAL STRUCTURAL MULLIONS USED TO
 CONNECT THE SLIDING GLASS DOORS TO THE
 FIXED GLASS WINDOW ABOVE, PRIOR TO
 INSTALLATION.
  
 3) STORM PANELS TO BE APPLIED FOR UNDER
 A SEPARATE PERMIT.

Review Stop R ROOF PLAN REVIEW
Rev No 1 Status F Date 2001-11-20 Cont ID  
Sent By rmcdouga Date 2001-11-20 Time 16:23 Rev Time 4.00
Received By rmcdouga Date   Time   Sent To  
Notes
2001-11-20 00:00:00*************BUILDING UNSAT*************
  
 1) A RECORDED COPY OF THE NOTICE OF
 COMMENCEMENT MUST BE SUBMITTED BEFORE A
 PERMIT CAN BE ISSUED.
  
 2) THE IMPORTANCE FACTOR LISTED ON C-1
 IS INCORRECT, IT SHOULD BE 1.0 FOR 97
 SBC 1606.
  
 3) THE FOOTING DIMENSIONS FOR SECTIONS A
 & B ON A-5 ARE INCORRECT. THE F-1 FOOT-
 INGS ARE INDICATED AS 16" DEEP ON S-1.
  
 4) THE PLANS INDICATE R-30 CEILING
 INSULATION AND THE ENERGY CALCULATIONS
 LIST R- 19. PLEASE CLARIFY.
  
 5) SEMCO AND HUGHES HAVE BEEN PURCHASED
 BY USP. SOME OF THEIR CONNECTORS HAVE
 VALUES THAT ARE CHANGED AND SOME ARE NO
 LONGER AVAILABLE. PLEASE PROVIDE A
 REVISED TRUSS ANCHOR SCHEDULE. CONSULT
 USP TECHNICAL ASSISTANCE FOR REDUCED
 LOAD VALUES FOR INSTALLATIONS OF EMBEDD-
 ED TRUSS ANCHORS SPACED CLOSER THAN 8"
 AND WHEN USING LESS THAN THE SPECIFIED
 NUMBER OF FASTENERS.
  
 6) THERE IS NO TRUSS ANCHOR SPECIFIED
 FOR ONE END OF THE GIRDER AT THE GARAGE.
  
 7) NOTE THREE ON S-3 INCORRECTLY
 REFERENCES ASCE 7-93. THE DESIGN MUST BE
 BASED ON 97 SBC SECTION 1606 FOR 110 MPH
 OR ASCE 7-95 FOR 140 MPH. PLEASE CORRECT
  
 8) THE ROOF PLYWOOD SHEATHING NAILING
 SCHEDULE ON THE TOP OF S-2 LISTS ZONES
 RI AND SI. THE SPECIAL NAILING ZONES IN
 THE CITY OF WPB AMENDMENTS TO THE 97 SBC
 ARE DESIGNATED AS ZONES 1,2 AND 3.
 PLEASE CORRECT.
  
 9) THE PRODUCT APPROVAL FOR THE GLASS
 BLOCK EXPIRED PRIOR TO APPLICATION FOR
 PERMIT.
  
 10) PROVIDE INFORMATION ON GLASS BLOCK
 THAT INDICATES THAT THE BLOCK USED AT
 THE SHOWER HAS A MINIMUM UNIFORM FACE
 THICKNESS OF 0.25 INCH, TO COMPLY WITH
 97 SBC 2405.2 GLASS IN HAZARDOUS
 LOCATIONS.
  
 11) PROVIDE PRODUCT APPROVALS FOR
 STRUCTURAL MULLIONS USED TO CONNECT
 THE SLIDING GLASS DOOR AND THE FIXED
 GLASS WINDOWS ABOVE.
  
 12) PROVIDE KEY PLAN, INSTALLATION
 SCHEDULE, METHOD OF INSTALLATION AND
 TYPE OF ANCHORS TO BE USED TO INSTALL
 STORM PANELS.
  
 ROBERT MCDOUGAL
 BLDG. PLAN REVIEW
 (561)659-8096 EXT.8202

Review Stop Z ZONING
Rev No 1 Status P Date 2001-10-19 Cont ID  
Sent By sgraham Date 2001-10-19 Time 13:52 Rev Time 0.25
Received By sgraham Date   Time   Sent To  
Notes
***NONE***