2001-10-18 00:00:00 | FAILED: |
| 1. CONSTRUCTION OF GAZEBO MUST CLEAR THE |
| 40.88' UE ON EAST SIDE. |
| 2. PLEASE SUBMIT STORM WATER CALCULATION |
| FOR OUR REVIEW AND APPROVAL IF NOT |
| SUBMITTED TO JOSE DEL RIO,IF SUBMITTED |
| , THEN STATE THE STATUS. |
| 3. PLEASE SUBMIT PERVIOUS AND IMPERVIOUS |
| AREA CALCULATIONS FOR ENTIRE SITE, |
| SIGNED & SEALED. |
| 4. STORM DRAIN #6 SHOWS I.E = 12.5(N), |
| IT SHOULD SHOW 1.E = 12.5(W) |
| 5. PROVIDE 4" CONCRETE FLUME AROUND |
| THE EXISTING CATCH BASIN GRATE IN THE |
| PROPOSED SWALE AREA. |
| 6. PLEASE SHOW DRAINAGE FOR THE POOL. |
| 7. LIGHT POLE RELOCATIONS MUST BE |
| COORDINATED WITH PUBLIC UTILITIES. |
| 8. ANY WORK WITHIN PUBLIC R.O.W WILL |
| REQIURES A SEPATRATE PERMIT FROM CITY |
| ENGINEER'S OFFICE, 659-8040. |
| 9. NEW CONNECTIONS TO CITY SERVICES |
| AND INSTALLATION OF BACKFLOW PREVENTERS |
| WOULD REQUIRE PERMIT AND APPROVAL FROM |
| PUBLIC UTILITIES, 659-8040. |
| 10. BEGIN TYPE "F" CURB AT THE EDGE OF |
| 20' FIRE ACCESS LANE WITH ADEQUATE |
| TRANSITIONS AS MARKED ON SHEET C-4. |
| 11. EXCAVATIONS TO ELEV. 15' IN |
| RETENSION AREA WOULD LEAVE +/- 1' OF |
| COVER FOR THE EXISTING 36" WATER MAIN |
| (PRESSURE PIPE), PLEASE VERIFY. |
| |
| IF ANY QUESTIONS PLEASE CONTACT 659-8096 |
| EXT. 8492 MOHAMMAD R. AMINI |