Plan Review Stops For Permit 01091471 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
19 |
Status |
P |
Date |
2003-09-04 |
|
|
Cont ID |
|
Sent By |
shernand |
Date |
2003-09-24 |
Time |
09:22 |
Rev Time |
0.30 |
Received By |
bstaples |
Date |
|
Time |
|
Sent To |
|
|
Notes |
2003-09-04 00:00:00 | USE OF APPROVED FOAM ON EXTERIOR OF | | BUILDING APPROVED BY BUILDING OFFICIAL | | UNDER ALTERNATE MATERIALS, SECTION | | 103.7 OF THE CITY OF WEST PALM BEACH | | AMENDMENBTS TO THE FLORIDA BUILDING | | CODE. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
18 |
Status |
F |
Date |
2003-08-20 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2003-08-27 |
Time |
14:55 |
Rev Time |
0.00 |
Received By |
hpiskura |
Date |
2003-08-20 |
Time |
09:58 |
Sent To |
|
|
Notes |
2003-08-20 00:00:00 | SHEET A29 REVISONS DATED 7/28/03 | | | | THE USE OF COMBUSTIBLE ARCHITECTURAL IS | | PROHIBITTED BY SBC F102.2.7, SBC 1404.1. | | 1 OF THE 1997 STANDARD BUILDING CODE | | WHICH THE BUILDING WAS PERMITTED UNDER. | | | | THE CURRENT 2001 FLORIDA BUILDING CODE | | IN EFFECT HAS SIMILAR LANGUAGE. | | | | PLEASE REVISE AS NECESSARY. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
17 |
Status |
F |
Date |
2003-07-31 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2003-08-19 |
Time |
15:37 |
Rev Time |
0.00 |
Received By |
hpiskura |
Date |
|
Time |
|
Sent To |
|
|
Notes |
2003-07-31 00:00:00 | AMELUNG HANDRAIL INFORMATION | | | | ENGINEERING SUBMITTED FOR PUBLIC RECORD | | REQUIRES AN ORIGINAL SIGNATURE AND | | EMBOSSED SEAL. | | | | DELEGATED ENGINEERING IS REQUIRED TO BE | | REVIEWED BY THE DESIGNER OF RECORD FOR | | CONFORMANCE WITH DESIGN INTENT. | | | | CC: DON NEELY |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
16 |
Status |
P |
Date |
2003-07-22 |
|
|
Cont ID |
|
Sent By |
alange |
Date |
2003-07-31 |
Time |
09:25 |
Rev Time |
0.00 |
Received By |
hpiskura |
Date |
|
Time |
|
Sent To |
|
|
Notes |
2003-07-22 00:00:00 | SHEET AO2, REVISION #5 |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
15 |
Status |
F |
Date |
2003-07-10 |
|
|
Cont ID |
|
Sent By |
hpiskura |
Date |
2003-07-10 |
Time |
09:51 |
Rev Time |
0.00 |
Received By |
hpiskura |
Date |
2003-07-10 |
Time |
09:51 |
Sent To |
|
|
Notes |
2003-07-10 00:00:00 | VARIOUS INFORMATION SUBMITTED 7/2/03 | | NOTED AS REVISED STOREFRONT SUBMITTALS | | AND STOREFRONT SIDELIGHTS. | | | | AS NOTED IN MY COMMENTS DATED 5/20/03, A | | SEPARATE PERMIT IS REQUIRED FOR DOORS, | | WINDOWS, ETC. WHEN THAT SPECIFIC | | INFORMATION HAS NOT BEEN INCLUDED WITH | | THE ORIGINAL PERMIT APPLICATION AS IS | | THE APPARENT CASE HERE. | | | | APPLY FOR A PERMIT AND INCLUDE THREE | | SETS OF INFORMATION.PROVIDE AN | | INSTALLATION SCHEDULE SHOWING THE | | LOCATION AND SIZES OF THE ELEMENTS TO | | BE INSTALLED, INCLUDING THE ATTENDANT | | DESIGN PRESSURES FROM THE EOR. | | | | SELECT, NOTE, MARK OR SHOW WHICH | | COMPONENTS WILL BE USED IN THE | | RESPECTIVE NOA'S WHERE APPLICABLE. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
14 |
Status |
F |
Date |
2003-05-20 |
|
|
Cont ID |
|
Sent By |
shernand |
Date |
2003-07-02 |
Time |
12:23 |
Rev Time |
0.00 |
Received By |
hpiskura |
Date |
2003-05-20 |
Time |
17:44 |
Sent To |
|
|
Notes |
2003-05-20 00:00:00 | NOA 01-0228.09 SUBMITTED 5/15/03. | | | | IF NOA'S AND/OR TEST REPORTS ARE NOT | | INCLUDED WITH THE ORIGINAL PERMIT | | APPLICATION, A SEPARATE PERMIT AND FEES | | ARE REQUIRED. | | | | THE BUEROSSE, PE SHOP DWG 1 OF 2 SAYS | | "DOORS BY OTHERS".WHERE IS THAT | | INFORMATION? | | | | SECTION 6.1.2 OF THE 01-0228.09 NOA | | CALLS FOR THE COMPONENTS TO BE USED TO | | BE CLEARLY MARKED ON THOSE DRAWINGS. | | | | WHERE IS THE ATTACHMENT METHOD FOR THE | | STOREFRONT SYSTEM? | | | | CC: MIKE SIZEMORE |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
13 |
Status |
F |
Date |
2003-05-12 |
|
|
Cont ID |
|
Sent By |
shernand |
Date |
2003-05-19 |
Time |
09:44 |
Rev Time |
0.00 |
Received By |
hpiskura |
Date |
2003-05-12 |
Time |
15:36 |
Sent To |
|
|
Notes |
2003-05-12 00:00:00 | THE COPIES OF THE ARCHITECTURAL PAGES | | ARE NOT SHOP DRAWINGS. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
12 |
Status |
P |
Date |
2003-04-15 |
|
|
Cont ID |
|
Sent By |
shernand |
Date |
2003-05-07 |
Time |
13:24 |
Rev Time |
0.00 |
Received By |
hpiskura |
Date |
|
Time |
|
Sent To |
|
|
Notes |
2003-04-15 00:00:00 | REVISION DATED 4/4/03 |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
11 |
Status |
P |
Date |
2003-01-16 |
|
|
Cont ID |
|
Sent By |
sthyng |
Date |
2003-03-11 |
Time |
16:23 |
Rev Time |
0.00 |
Received By |
hpiskura |
Date |
2003-01-16 |
Time |
08:53 |
Sent To |
|
|
Notes |
2003-01-16 00:00:00 | REVISION 4 A-02, REV 2 A-30, REV 2 A31 |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
10 |
Status |
C |
Date |
2002-12-11 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2003-01-06 |
Time |
16:51 |
Rev Time |
0.00 |
Received By |
hpiskura |
Date |
|
Time |
|
Sent To |
|
|
Notes |
2002-12-11 00:00:00 | RE: ROOF TILE NOA 99-1012.01. | | | | THE NOA HAS HIGH LIGHTED ON IT TABEL 4A | | FOR A SINGLE PATTY ADHESIVE SYSTEM. | | | | SECTION 3 LIMITATIONS, REQUIRES A | | STATIC FIELD UPLIFT TEST IN ACCORDANCE | | WITH MIAMI DADE RAS 106.THE RESULTS | | OF THIS TESTING MUST BE PROVIDED TO THE | | CITY. | | | | DOCUMENTATION OF THE QUARTERLY TESTING | | AS SET OUT IN THE REPORT MUST ALSO BE | | PROVIDED TO THE CITY. | | | | PRIOR TO ANY INSTALLATION, AN ANALYSIS | | IN ACCORDANCE WITH MIAMI-DADE RAS 127 | | FOR A MOMENT BASED SYSTEM USING THE | | PRESSURE FOR THE CORNER ZONE MUST BE | | BE PROVIDED BY G.V. PIREZ, PE.THE | | SHEET DATED 9/15/01 HAS PRESSURES OF | | -112 FOR ZONE 1 AND -182 FOR ZONE 2. | | THE CORNERS OR ZONE THREE ARE ABSENT | | FROM THAT SHEET AND THE MR APPEARS | | MARGINAL. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
9 |
Status |
P |
Date |
2002-11-13 |
|
|
Cont ID |
|
Sent By |
hpiskura |
Date |
2002-11-13 |
Time |
12:19 |
Rev Time |
0.00 |
Received By |
hpiskura |
Date |
|
Time |
|
Sent To |
|
|
Notes |
2002-11-13 00:00:00 | THE "OPERABLE WINDOW" SUBMITTAL DATED | | 11/12/02 FOR WINDOWS HAVING SITE | | SPECIFIC ENGINEERING PREPARED BY AL | | FAROOQ CORP. ARE REQUIRED TO HAVE A | | SEPARATE PERMIT AND TO BE DESIGNED IN | | ACCORDANCE WITH THE 2001 FBC. | | | | SEE THE ATTACHED IMPLEMENTATION | | STANDARD FOR HURRICANE MISSILE IMPACT | | PROTECTION | | | | THIS WAS NOTED ON PREVIOUS SUBMITTALS | | FOR WINDOWS AND ROOF COVERINGS. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
8 |
Status |
F |
Date |
2002-10-29 |
|
|
Cont ID |
|
Sent By |
btrobaug |
Date |
2002-11-12 |
Time |
17:58 |
Rev Time |
0.00 |
Received By |
hpiskura |
Date |
|
Time |
|
Sent To |
|
|
Notes |
2002-10-29 00:00:00 | THE KRAFT FACED INSULATION CALLED OUT | | IN THE CERTAINTEED FIBERGLASS INSUALTION | | INFORMATION SUBMITTED 10/28/02 DOES NOT | | COMPLY WITH SBC 708.2.1 FOR THE FLAME | | SPREAD RATING. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
7 |
Status |
F |
Date |
2002-10-11 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2002-10-29 |
Time |
07:03 |
Rev Time |
0.00 |
Received By |
hpiskura |
Date |
2002-10-11 |
Time |
09:42 |
Sent To |
|
|
Notes |
2002-10-11 00:00:00 | RE: SHOP DWGS AND NOA'S SUBMITTED | | 10/3/02 | | | | PRODUCT APPROVAL INFORMATION FOR THE | | ROOF TILE WAS NOT INCLUDED AND/OR | | REVIEWED WITH THE BUILDING PERMIT SO A | | SEPARATE PERMIT AND INFORMATION IS | | REQUIRED.NOTE TOO, THAT THE MONIER | | SYSTEM CHOSEN IS FOR A WOOD DECK | | APPLICATION.THESTRUCTURAL PLANS DO | | NOT HAVE WOOD DECKS. (TYPE I | | CONSTRUCTION) | | | | INCLUDED HERE IS A COPY OF THE PROVISO | | THAT WAS INCLUDED AT TIME OF PERMIT | | ISSUE | | THE ENGINEER'S PRESSURE ZONES FOR THE | | ROOF HAVE NOT BEEN PROVIDED YET. | | | | WHERE WILL THE AEICOR METAL ROOFING BE | | USED? |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
6 |
Status |
F |
Date |
2002-09-16 |
|
|
Cont ID |
|
Sent By |
hpiskura |
Date |
2002-09-16 |
Time |
10:51 |
Rev Time |
0.00 |
Received By |
hpiskura |
Date |
|
Time |
|
Sent To |
|
|
Notes |
2002-09-16 00:00:00 | RE: DOOR TYPE 8 NOA, DATED 9/11/02 | | | | THE REVISED WIND LOAD PAGE A-02 AND THE | | WIND LOAD FAX FROM G.V. PIREZ ARE | | REQUIRED TO BE SIGNED AND SEALED BY THE | | RESPECTIVE DESIGN PROFESSIONALS WHEN | | SUBMITTED FOR PUBLIC RECORD.SEE FBC | | 104.2.2. | | | | | | | | ALSO, PAY THE REVISION FEES AS PROVIDED | | FOR IN THE CITY'S PERMIT FEE SCHEDULE. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
5 |
Status |
P |
Date |
2002-08-26 |
|
|
Cont ID |
|
Sent By |
hpiskura |
Date |
2002-08-26 |
Time |
13:25 |
Rev Time |
0.00 |
Received By |
hpiskura |
Date |
2002-08-26 |
Time |
13:26 |
Sent To |
|
|
Notes |
2002-08-26 00:00:00 | REV #3 A26 |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
4 |
Status |
C |
Date |
2002-07-11 |
|
|
Cont ID |
|
Sent By |
hpiskura |
Date |
2002-07-11 |
Time |
15:06 |
Rev Time |
0.00 |
Received By |
hpiskura |
Date |
|
Time |
|
Sent To |
|
|
Notes |
2002-07-11 00:00:00 | THE SEVERAL AND VARIOUS METRO DADE | | NOTICE OF ACCEPTANCES FOR THE DOORS AND | | WINDOWS SUBMITTED AS SHOPDRAWINGS ON | | 6/25/02 ARE REQUIRED TO HAVE A SEPARATE | | PERMIT APPLICATION, SINCE THEY WERE NOT | | INCLUDED WITH THE ORIGIANL PERMIT PLANS. | | | | | | PLEASE INCLUDE A SKETCH INDICATING THE | | LOCATION OF THE WINDOW OR DOOR TO BE | | INSTALLED.SHOW THE DESIGN PRESSURES | | FOR THE OPENINGS ON THE SKETCH.ENSURE | | THAT THE PRESSURES ON THE NOA'S AGREE | | WITH THE BUILDING DESIGN AND IN CASES | | WHERE THERE IS MORE THAN ONE METHOD OR | | UNIT ON THENOA THAT THE INTENDED METHOD | | OR UNIT IS CLEARLY SELECTED AND MARKED | | ON THE NOA. | | | | SOME OF THE NOA'S INDICATED THE | | REQUIREMENT FOR "HURRICANE PROTECTION" | | IE SHUTTERS.THE BUILDING OFFICIAL'S | | INTERPRETATION OF THE CODE IS THAT | | SHUTTERS ARE NOT TO BE SUBSTITUTED FOR | | IMPACT RESISTANT GLAZING IN LARGE | | BUILDINGS AND/OR LARGE NUMBERS OF | | OPENINGS.SEE THE ATTACHED | | IMPLEMENTATION STANDARD. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
3 |
Status |
P |
Date |
2002-04-10 |
|
|
Cont ID |
|
Sent By |
hpiskura |
Date |
2002-04-10 |
Time |
11:32 |
Rev Time |
0.00 |
Received By |
hpiskura |
Date |
|
Time |
|
Sent To |
|
|
Notes |
2002-04-10 00:00:00 | PROVISO: | | | | THE REVISED SUSPENDED CEILING DETAIL ON | | SHEET A-11.1 LACKS SPECIFIC CONSTRUCTION | | INFORMATION.PROVIDE A SKETCH | | DETAILING SPACING OF FRAMING CHANNELS, | | TYPE AND NUMBER OF FASTENERS AND THE | | GAUGE OF THE FRAMING MEMBERS. | | STATEMENTS SUCH AS "ANCHOR TO STRUCTURE | | ABOVE" ARE NOT ADEQUATE.PLEASE SUBMIT | | THIS INFORMATION BEFORE CONSTRUCTION. | | | | THE USE OF HURRICANE PANELS IS SUBJECT | | TO THE BUILDING OFFICIAL'S | | INTERPRETATION PAPER.SEE ATTACHED. | | | | THE DRAWINGS NOTED IN THE METRO DADE | | REPORTS NUMBERED 00-0628.11, 01-0629.08 | | AND99-0218.01 ARE MISSING.ALSO, | | PROVIDE ABLDG SKETCH OR TABLE DEPICTING | | THE PRESSURES FOR THE COMPONENTS AND | | CLADDING. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
F |
Date |
2002-02-25 |
|
|
Cont ID |
|
Sent By |
hpiskura |
Date |
2002-02-25 |
Time |
11:04 |
Rev Time |
0.00 |
Received By |
hpiskura |
Date |
|
Time |
|
Sent To |
|
|
Notes |
2002-02-25 00:00:00 | THE UL 505 CONSTRUCTION DECLARED ON | | SHEET A.28 SECTION 5 DOES NOT APPEAR TO | | BE PRACTICAL FOR SHAFT CONSTRUCTION IN | | THE CONFIGURATION DEPICTED ON THE | | PLANS.HOW WILL THE JOINTS BE TAPED ON | | THE INTERIOR OF THE SHAFTS AND THE | | ANGLES ATTACHED? | | | | DETAILS 4/A.27 AND S2.3, WHAT IS THE | | MATERIAL SHOWN AS "SM WRC 2X6"? | | | | PROVIDE SPECIFIC CONSTRUCTION DETAILS | | INCLUDING CONNECTIONS FOR THE SUSPENDED | | STUD CEILING SYSTEM SHOWN IN SECTION 3, | | SHEET A.09. | | | | SHEET A35, NOTE 1.04 B, CALLS OUT ASCE | | 7-93, THE DESIGN PRESSURES IN NOTE | | 2.02ADO NOT AGREE WITH THOSE ON SHEETS | | A12 - A14, ROOFING NOTES 1D ARE | | ASCE7-93.SHEET M8 DECLARES THE SOUTH | | FLORIDA BUILDING CODE AND THE | | SPECIFICATIONS STILL REFERENCE A 110 | | MPH WIND DESIGN.PLEASE REVISE AS | | NECESSARY AND ENSURE COMPLIANCE WITH | | ASCE 7-95 IN ACCORDANCE WITH SBC 1606.1. | | 1 | | | | THE INFORMATION PROVIDED ON 2/6/02 DOES | | NOT QUALIFY THE "DYPLAST" MATERIAL AS | | NON-COMBUSTIBLE AS PROVIDED FOR IN SBC | | 202. THE "ACROCRETE" PRODUCTS MAY ONLY | | BE USED IN ACCORDANCE WITH ITS LISTING | | AND LIMITATIONS CONTAINED IN THAT | | REPORT. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2001-11-07 |
|
|
Cont ID |
|
Sent By |
hpiskura |
Date |
2001-11-07 |
Time |
16:32 |
Rev Time |
0.00 |
Received By |
hpiskura |
Date |
|
Time |
|
Sent To |
|
|
Notes |
2001-11-08 00:00:00 | PLEASE PROVIDE A RECENT PROPERTY SURVEY. | | | | THE SOIL REPORT IS REQUIRED TO HAVE THE | | EMBOSSED SEAL OF THE ENGINEER TOGETHER | | WITH THE ORIGINAL SIGNATURE AND DATE. | | THIS IS REQUIRED FOR ALL DOCUMENTS | | PREPARED BY AN ENGINEER OR ARCHITECT | | AND SUBMITTED FOR PUBLIC RECORD.SEE | | FS 471 AND 481 | | | | PLEASE PROVIDE THE FIRE DESIGN NUMBERS | | FOR THE MASONRY WALLS SERVING AS SHAFT | | ENCLOSURES AND EXTERIOR WALLS.SEE SBC | | 701.5. | | | | WHAT IS THE MEANING OF THE NOTE ON | | SHEETA0-1 "ADJACENT BUILDING WALL | | CONSTRUCTED AS FIRE WALL AS DEFINED BY | | CODE." ? | | | | THE DOORS TO THE CLUBHOUSE AND FITNESS | | ROOMS SHOWN AS #26 ARE REQUIRED TO BE | | FIRE RATED.SEE SBC 705.1.2 AND | | 704.1.1. | | | | | | SBC 1008 REQUIRES ONE OF THE EXIT STAIRS | | TO BE CONTINUOUS TO THE ROOF. | | | | SBC 3104.3 REQUIRES "PROTECTION AT THE | | INTERFACE" WHERE THE COVERED WALKWAY | | JOINS THE BUILDING. | | | | NEITHER THE PLANS NOR THE SPECIFICATIONS | | INDICATE THE USE OF FIRE RETARDANT | | TREATED, (FRT) BLOCKING AS PROVIDED FOR | | IN SBC 609 AND SBC 707.1. | | | | SBC 104.2.1 DOES NOT ALLOW CITING THE | | CODE IN LIEU OF SPECIFIC DESIGN | | INFORMATION SUCH AS THAT FOUND ON SHEET | | A-29 "ADHERE DYPLAST W/ STANDARD | | BUILDING CODE 1403.6.8 ..."WHICH IS | | NOT A VALID CODE SECTION ANYWAY, PLEASE | | REVISE AS NECESSARY. | | | | DETAIL 1/A12 ON SHEET A29. SHOW A | | SPECIFIC CONNECTION DETAIL FOR THE | | STONE CORBEL OR IF DESIGN IS | | DESIGNATED, THE LOCATION, NATURE, | | DIRECTION AND MAGNITUDE OF THE FORCES | | TO BE RESISTED. | | | | MOST OF THE PAGES IN THE STRUCTURAL | | CALCULATIONS DO NOT PERTAIN TO THIS | | BUILDING.PLEASE PROVIDE COMPLETE | | CALCULATIONS DEMONSTRATING COMPLIANCE | | WITH SBC 1601 AND NOT JUST A WIND | | RESISTANCE INVESTIGATION. | | | | SHEET S-1.1 NOTE #8, WHAT IS THE TOP OF | | FOOTING ELEVATIONS? | | | | SEE SBC 1608.2.2 FOR THE GUARDRAIL | | DESIGN LOADS SHOWN ON SHEET A27 IN | | DETAIL 5/A25. | | | | SHEET S 1-1 DEPICTS COLUMNS NUMBERED 1 | | THROUGH 48 AND THE COLUMN SCHEDULE ON | | SHEET S 4-1 LISTS ONLY 42.THERE IS NO | | DETAIL FOR COLUMN #46. | | | | A THRESHOLD INSPECTION PLAN IS REQUIRED | | FOR THIS BUILDING AS PROVIDED FOR IN FS | | 553.71. | | | | SEVERAL AREAS OF THE SPECIFICATIONS | | ERRONEOUSLY CITE A 110 MPH WIND SPEED. | | PLEASE REVISE AS NECESSARY AND INCLUDE | | A SKETCH OF THE BUILDING DEFINING THE | | PRESSURE ZONES AND THEIR ATTENDANT | | PRESSURES. | | | | SMOKE DETECTORS ARE NOT SHOWN INSIDE OF | | THE SLEEPING ROOMS AS PROVIDE FOR IN | | NFPA 72 WHICH IS INVOKED BY SBC 905.2. | | | | THE STAIR SECTIONS SHOWN WITH RISER | | HEIGHTS OF 6.5" OR LESS WHEN TAKEN | | TOGETHER WITH THE DECLARED 11" TREAD DO | | NOT MEET THE 24"- 25" OF SBC 1007.3.1. | | SEE ALSO NFPA 101 FOR THE 7/11 | | REQUIREMENT. | | | | PLEASE PROVIDE CALCULATIONS AND A | | WRITTEN NARRATIVE TO BETTER DESCRIBE | | THE SEQUENCE OF OPERATIONS FOR SMOKE | | CONTROL DECLARED ON SHEET M-8. | | DEMONSTRATE THAT THE BAROMETRIC RELIEF | | DAMPER WILL PROVIDE FOR AT LEAST 2500 | | CFM FLOWINGAND ANTICPATED STACK | | PRESSURES IN THE BUILDING.SEE SBC | | 412.11 (5). | | | | DESCRIBE HOW SMOKE REMOVAL FROM THE | | CORRIDORS WILL BE ACCOMPLISHED AT A | | RATE OF AT LEAST 6 AIR CHANGES PER | | HOUR. SEE SBC 412.5 (3) IF THIS IS THE | | INTENDED METHOD. | | | | SHEET E3-5 DOES NOT SHOW THE FIRE | | DEPARTMENT COMMUNICATION SYSTEM | | REQUIRED BY SBC 412.3.3.ARE THE MARKS | | SHOWN ON THE PLANS AS [T] THE INTENDED | | LOCATIONS? | | | | E 3-5, OR THE SPECIFICATIONS, DO NOT | | SHOW THE BACKUP POWER SUPPLY FOR THE | | ALARM SYSTEM. ELEVATOR RECALL BY | | ELEVATOR LOBBY SMOKE DETECTOR IS NOT | | NOTED IN THE SEQUENCE OF OPERATION. SEE | | SBC 412.6.3. | | | | THERE IS NO SPECIFICATION FOR THE | | GENERATOR FUEL SUPPLY.SEE SBC | | 412.7.1.2.ALSO THE E SHEETS DO NOT | | CLEARLY INDICATE THE MANDATORY STAND BY | | POWER LOADS TO BE CARRIED BY THE | | GENERATOR.SEE SBC 412.7.2. | | | | SEVERAL OF THE DOORS WITHIN THE UNITS DO | | NOT MEET THE NOMINAL 32" WIDTH REQUIRED | | BY THE FAIR HOUSING ACT. TOILET AND | | POWDER ROOMS, BEDROOMS, WALKIN CLOSETS, | | PATIOS, AND SIMILAR LIVING AREAS AS | | CITED IN THAT LAW.PLEASE REVISE AS | | NECESSARY. | | | | THE METRO DADE NOTICE OF ACCEPTANCE | | REPORT #990212.09 IS ILLEGIBLE. | | | | NOA #97-1204.02 IS EXPIRED. | | | | 00-0721.05 FOR THE SHUTTERS DOES NOT | | HAVE THE COMPONENTS SELECTED OR THE | | LOCATION OF THEIR PROPOSED APPLICATION | | ON THE BUILDING.SHUTTERS ON | | MULTI-STORY BUILDINGS IN LIEU OF IMPACT | | RESISTANT GLAZING, ARE SUBJECT TO | | APPROVAL BY THE BUILDING OFFICIAL ON A | | CASE BY CASE BASIS. | | | | BEFORE A PERMIT TO CONSTRUCT MAY BE | | ISSUED, IMPACT FEES MUST BE PAID TO THE | | COUNTY FOR THE CITY, THE PERMIT PLANS | | STAMPED BY THAT OFFICE,AND A COPY OF | | THE PAID RECEIPT ATTACHED TO THE PERMIT | | APPLICATION.CALL 561-233-5025 FOR | | MORE INFORMATION. | | | | CONTACT DON NEELY REGARDING THE ONSITE | | THRESHOLD INSPECTOR FOR SPECIFIC CITY | | REQUIREMENTS.561-659-8096 X 8333. |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
22 |
Status |
P |
Date |
2003-10-14 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2003-10-14 |
Time |
11:30 |
Rev Time |
0.50 |
Received By |
dpalmer |
Date |
2003-10-14 |
Time |
11:30 |
Sent To |
P |
|
Notes |
2003-10-14 00:00:00 | TWO ROLLS PF PLANS NEEDED TO BE STAMPED | | BY ALL TRADES EXCEPT MECH. | | RTEMOVED 3.3 DUE TO REV BEING CORRECTED | | UNDER SEPARATE REV SUBMITTAL. |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
21 |
Status |
P |
Date |
2003-10-06 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2003-10-06 |
Time |
16:09 |
Rev Time |
0.33 |
Received By |
dpalmer |
Date |
2003-10-06 |
Time |
16:09 |
Sent To |
|
|
Notes |
2003-10-06 00:00:00 | MAIN SERVICE LOAD ADJUSTDMENT |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
20 |
Status |
F |
Date |
2003-09-19 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2003-09-19 |
Time |
09:19 |
Rev Time |
0.50 |
Received By |
dpalmer |
Date |
2003-09-19 |
Time |
09:19 |
Sent To |
|
|
Notes |
2003-09-19 00:00:00 | ********** UNSAT ********************** | | | | 1)NOTE: PLEASE SEE SHEET E-3-3, SHOWS | | 37900AMPS ON 4000A BUS DUCT AND SAME FOR | | 4000A SW BRD. | | | | PLEASE SUBMIT THE ABVOE INFORMATION FOR | | REVIEW. IF THERE ARE ANY QUESTIONS, | | PLEASE CALL. | | | | DEWEY PALMER | | ELECTRICAL PLAN REVIEW | | 561-805-6717 | | [email protected] |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
19 |
Status |
P |
Date |
2003-08-27 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2003-08-27 |
Time |
10:51 |
Rev Time |
0.50 |
Received By |
dpalmer |
Date |
2003-08-27 |
Time |
10:51 |
Sent To |
|
|
Notes |
2003-08-27 00:00:00 | REV FOR UNITS/ UNIT LOAD CALCULATIONS. |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
18 |
Status |
F |
Date |
2003-08-22 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2003-08-22 |
Time |
16:01 |
Rev Time |
1.00 |
Received By |
dpalmer |
Date |
2003-08-22 |
Time |
06:30 |
Sent To |
|
|
Notes |
2003-08-22 00:00:00 | *********** UNSAT ***************** | | | | PLEASE PROVIDE A CURRENT 2-1,3-2,3-3 | | PLEASE PROVIDE LATEST LOAD STUDY EVEN | | IF LOADS HAVE DECREASED FOR RECORD. | | | | | | PLEASE SUBMIT THE ABOVE INFORMATION FOR | | REVIEW. IF THERE ARE ANY QUESTIONS, | | PLEASE CALL. | | | | DEWEY PALMER | | ELECTRICAL PLAN REVIEW | | 561-805-6717 | | DPALMER @WPB.ORG |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
17 |
Status |
P |
Date |
2003-08-22 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2003-08-22 |
Time |
06:21 |
Rev Time |
3.00 |
Received By |
dpalmer |
Date |
2003-08-22 |
Time |
06:03 |
Sent To |
|
|
Notes |
2003-08-22 00:00:00 | *************** NOTE ************** | | | | REV OK FOR 3-1 AND 3-4 ONLY | | WAITING FOR NEW 3-3,2-1 SEE OTHER | | COMMENTS. |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
16 |
Status |
P |
Date |
2003-08-15 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2003-08-19 |
Time |
15:39 |
Rev Time |
0.50 |
Received By |
btrobaug |
Date |
2003-08-15 |
Time |
15:43 |
Sent To |
|
|
Notes |
2003-08-15 00:00:00 | REVISED PANEL SCHEDULES,UNITS A,A1,B.B1 | | & C./WRT. |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
15 |
Status |
F |
Date |
2003-08-07 |
|
|
Cont ID |
|
Sent By |
dbaxter |
Date |
2003-08-12 |
Time |
14:01 |
Rev Time |
0.33 |
Received By |
dpalmer |
Date |
2003-08-07 |
Time |
13:20 |
Sent To |
|
|
Notes |
2003-08-07 00:00:00 | ************** UNSAT *************** | | | | 1)NOTE: PLEASE SEE THAT RISER DIAGRAM | | DOES NOT HAVE TITLE BLOCK FOR ENGINEER | | OF RECORD AND IS NOT SIGNED DATED AND | | SEALED BY ENGINEER OF RECORD.? | | PLEASE HAVE ALL REVISED DRAWINGS DONE | | BY ENGINEER. FS/ FAC 471.025, 61G15-23. | | 002. | | REVIEW WILL BE DONE AT THAT TIME. | | | | IF THERE ARE ANY QUESTIONS, PLEASE CALL. | | | | DEWEY PALMER | | ELECTRICAL PLAN REVIEW | | 561-805-6717 | | [email protected] |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
14 |
Status |
P |
Date |
2003-08-05 |
|
|
Cont ID |
|
Sent By |
alange |
Date |
2003-08-05 |
Time |
15:01 |
Rev Time |
0.33 |
Received By |
dpalmer |
Date |
2003-08-05 |
Time |
13:35 |
Sent To |
|
|
Notes |
2003-08-05 00:00:00 | POOL REVISION/ PLAN ONLY. |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
13 |
Status |
F |
Date |
2003-07-16 |
|
|
Cont ID |
|
Sent By |
alange |
Date |
2003-08-04 |
Time |
15:50 |
Rev Time |
2.00 |
Received By |
dpalmer |
Date |
2003-07-16 |
Time |
12:48 |
Sent To |
|
|
Notes |
2003-07-16 00:00:00 | ************* UNSAT ***************** | | | | 1)NOTE: PLEASE CORRELATE RISER DIAGRAM | | AND PANELS. | | THERE ARE NUMEROUS LOCATIONS THAT | | FEEDERS SIZES DO NOT SEEM TO CORRELATE | | AND SOME DO NOT MEET 310-16 FOR SIZING | | AND OCP UNDER 240. | | | | PLEASE PROVIDE A CURRENT AND UP TO DATE | | COMPLETE RISER DIAGRAM AND ALL PANEL | | SCHEDULES. | | IF THERE ARE ANY QUESTIONS,PLEASE CALL. | | | | DEWEY PALMER | | ELECTRICAL PLAN REVIEW | | 561-805-6717 | | [email protected] |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
12 |
Status |
P |
Date |
2003-04-28 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2003-04-28 |
Time |
14:01 |
Rev Time |
1.25 |
Received By |
dpalmer |
Date |
2003-04-28 |
Time |
14:01 |
Sent To |
FIRE |
|
Notes |
2003-04-28 00:00:00 | REV OK, 1-1,1-2,3-1,3-4 |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
11 |
Status |
P |
Date |
2003-01-07 |
|
|
Cont ID |
|
Sent By |
shernand |
Date |
2003-04-21 |
Time |
16:42 |
Rev Time |
0.25 |
Received By |
dpalmer |
Date |
2003-01-07 |
Time |
07:03 |
Sent To |
|
|
Notes |
2003-01-07 00:00:00 | REV FOR TELEPHONE CONDUITS. |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
10 |
Status |
F |
Date |
2002-11-13 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2002-11-13 |
Time |
12:41 |
Rev Time |
0.50 |
Received By |
dpalmer |
Date |
2002-11-13 |
Time |
12:41 |
Sent To |
P |
|
Notes |
2002-11-13 00:00:00 | ********** UNSAT ********* | | | | 1)NOTE: PLEASECLARIFY "CHANGE" IN | | SWITCH GEAR. IF CHANGED FROM PLANS, | | PLEASE REVISE RISER DIAGRAM AND SUBMIT | | WITH PLANS. PLEASE NOTE, ATLEAST ONE | | COPY OF SUBMITTALS NEEDS TO BE ORIG | | SIGNATURE AND SEAL BY ENGINEER OF RECORD | | 471 FS | | | | PLEASE SUBMIT THE ABOVE INFORMATION FOR | | REVIEW. IF THERE ARE ANY QUESTIONS, | | PLEASE CALL. | | | | DEWEY PALMER | | ELECTRICAL PLAN REVIEW | | 561-659-8096 EXT 8372 |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
9 |
Status |
P |
Date |
2002-10-09 |
|
|
Cont ID |
|
Sent By |
btrobaug |
Date |
2002-10-28 |
Time |
14:18 |
Rev Time |
1.25 |
Received By |
btrobaug |
Date |
2002-10-09 |
Time |
14:52 |
Sent To |
|
|
Notes |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
8 |
Status |
P |
Date |
2002-10-03 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2002-10-03 |
Time |
16:10 |
Rev Time |
3.00 |
Received By |
dpalmer |
Date |
2002-10-03 |
Time |
16:10 |
Sent To |
|
|
Notes |
2002-10-03 00:00:00 | ********* NOTE ************** | | | | PLEASE NOTE THIS STOP IS FOR ELECTRICAL | | SPEC BOOKS ONLY. |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
7 |
Status |
F |
Date |
2002-09-20 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2002-09-20 |
Time |
05:56 |
Rev Time |
0.50 |
Received By |
dpalmer |
Date |
2002-09-20 |
Time |
05:56 |
Sent To |
|
|
Notes |
2002-09-20 00:00:00 | ************** UNSAT ***************** | | | | 1)NOTE: PLEASE NOTE PLANS NEED TO HAVE | | CORRECTED DATES W/ REVISIONS SHOWN | | WITH CLOUDS/TRIANLGES. | | PLEASE NOTE PAGES THAT ARE SUBMITTED | | WITH THE SAME DATES FROM DEC OF 2001? | | PLEASE NOTE SOME PAGES SHOWN WITH A | | REV #2 AND PLANS ONLY SHOW REV #1? | | | | PLEASE CORRELATE PLANS, LABEL, DATE, ETC | | SUBMIT THE ABOVE INFORMATION FOR REVIEW. | | IF THERE ARE ANY QUESTIONS, PLEASE CALL. | | | | DEWEY PALMER | | ELECTRICAL PLAN REVIEW | | 561-659-8096 EXT 8372 |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
6 |
Status |
F |
Date |
2002-07-25 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2002-07-25 |
Time |
10:34 |
Rev Time |
0.00 |
Received By |
dpalmer |
Date |
2002-07-25 |
Time |
10:34 |
Sent To |
|
|
Notes |
2002-07-25 00:00:00 | ************** UNSAT *************** | | | | 1)NOTE: PLEASE NOTE THAT ALL SHEETS FOR | | SPECS ON LIGHTING NEED TO SHOW SOME | | KING OF RECOGNIZED TESTING,UL,ETL,MET,, | | ETC. | | | | PLEASE SUBMIT FOR REVIEW. IF THERE ARE | | ANY QUESTIONS, PLEASE CALL. | | | | DEWEY PALMER | | ELECTRICAL PLAN REVIEW | | 561-659-8096 EXT 8372 |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
5 |
Status |
P |
Date |
2002-07-25 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2002-07-25 |
Time |
10:33 |
Rev Time |
0.00 |
Received By |
dpalmer |
Date |
2002-07-25 |
Time |
10:33 |
Sent To |
FIRE |
|
Notes |
2002-07-25 00:00:00 | ******** NOTE **** | | | | SPEC BOOKS FOR MATERIALS ONLY. GENERATOR | | SPECS ALSO. | | SENT TO FIRE FOR GEN AND TANK REVIEW. |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
4 |
Status |
F |
Date |
2002-07-25 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2002-07-25 |
Time |
06:50 |
Rev Time |
0.00 |
Received By |
dpalmer |
Date |
2002-07-25 |
Time |
06:50 |
Sent To |
|
|
Notes |
2002-07-25 00:00:00 | ************* UNSAT ****************** | | ***** GENERATORS SPEC NAD CALCULATIONS** | | | | 1)NOTE: PLEASE NOTE THAT GENERATOR SPECS | | AND CALCS THAT ARE SUBMITTED FOR RECORD | | MUST BE SIGNED,DATED AND SEALED BY THE | | ENGINEER OF RECORD. 471.025 | | MUST BE ORIGINAL. | | | | 2)NOTE: PLEASE NOTE THAT SHEETS DO NOT | | CORRELATE? ONE SHOWS CALCS AT 120/208 | | AND GENERATOR AT 277/480V?? | | | | | | PLEASE SUBMIT THE ABOVE INFORMATION FOR | | REVIEW. IF THERE ARE ANY QUESTIONS, | | PLEASE CALL. | | | | DEWEY PALMER | | ELECTRICAL PLAN REVIEW | | 561-659-8096 EXT 8372 |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
3 |
Status |
P |
Date |
2002-03-28 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2002-03-28 |
Time |
09:06 |
Rev Time |
0.00 |
Received By |
dpalmer |
Date |
2002-03-28 |
Time |
09:06 |
Sent To |
|
|
Notes |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
2 |
Status |
F |
Date |
2002-03-07 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2002-03-07 |
Time |
07:02 |
Rev Time |
0.00 |
Received By |
dpalmer |
Date |
2002-03-06 |
Time |
14:18 |
Sent To |
|
|
Notes |
2002-03-07 00:00:00 | ****************** UNSAT ************* | | | | PLEASE NOTE THERE WERE ONLY TWO NOTES, | | THAT STILL NEED TO BE ADDRESSED. | | PLEASE SEE FIRE REVIEW COMMENTS, THERE | | MAY BE SOME CHANGES THEY MAY AFFECT | | ELECTRICAL DRAWINGS. | | PLEASE NOTE THAT THE FIRE DEPT AND | | ELECTRICAL NEED TO HAVE LAYOUT CHANGED | | FOR "FIRE DEPT RM`S". PLEASE NOTE THAT | | ROOMS SEEM TO BE TOO SMALL FOR OPERATION | | OF EQUIPMENT/PANELS DURING A FIREOR | | TESTING OF EQUIPMENT. PLEASE NOTE HOW | | DOOR(S) OPEN DIRECTLY INFRONT OF ONE OF | | THE PANELS. THIS WOULD MAKE IT DIFFICULT | | FOR CLEARENCES. PLEASE NOTE CLEARENCES | | PER 110-26. | | | | 1)NOTE: PLEASE NOTE FROM NOTE#16 FROM | | FIRST REVIEW. PLEASE NOTE THAT THE | | CONDUCTORS SIZES ARE NOW SHOWN FOR | | PANEL "DH". IT IS NOTED THAT OCP AT | | PANEL IS AT 500A`S. PLEASE CLARIFY LOAD | | BEING SHOWN AT 514AMPS? PLEASE NOTE | | 310-16 75 DEGREE COLUMN FOR SIZING. | | LOAD EXCEEDS RATING FOR TWO SETS OF | | 250MCM. (510A`S). | | | | 2)NOTE: PLEASE NOTE THAT LOAD SHOWN FOR | | FIRE PUMP IS SHOWN AT 73.0 KVA.? THIS | | PUTS LOAD AT 202A. 430-150 PUTS MOTOR | | AT 211AMPS. | | | | PLEASE ALSO CLARIFY HOW LOAD SHOWN FOR | | PANEL"DE" IS SHOWN AT 124.6 KVA AND THEN | | ON LOAD STUDY FOR GEN., IT IS SHOWN AT | | 106.2? IT IS NOTED THAT NOTE MENTIONS | | ONLY "ONE ELEVATOR". PLEASE CLARIFY | | HOW LOAD DECREASES WHEN "ATS" IS FEEDING | | ENTIRE PANEL? | | | | | | PLEASE SUBMIT THE ABOVE INFORMATION FOR | | REVIEW. IF THERE ARE ANY QUESTIONS, | | PLEASE CALL. | | | | DEWEY PALMER | | ELECTRICAL PLAN REVIEW | | 561-659-8096 EXT 8372 |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
F |
Date |
2001-10-24 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2001-10-24 |
Time |
22:04 |
Rev Time |
0.00 |
Received By |
dpalmer |
Date |
2001-10-24 |
Time |
22:04 |
Sent To |
|
|
Notes |
2001-10-24 00:00:00 | **************** UNSAT ***************** | | | | | | 1)NOTE: PLEASE NOTE THAT IN ORDER TO DO | | A COMPLETE PLAN REVIEW. PLANS NEED TO | | BE COMPLETE. GAZEBO IS MISSING,GENERATOR | | LOACTION, MISSING ELECTRICAL ROOM DETAIL | | -S FOR FLOOR WITH HOUSE PANELS? | | | | 2)NOTE: PLEASE NOTE TWO FLOORS SHOWING | | HOUSE PANELS 4E AND 4H? | | | | 3)NOTE: PLEASE NOTE THAT CIRCUIT LAYOUT | | ON LOWER CORNER OF E1-2 DOES NOT | | CORRELATE WITH E3-1? | | | | 4)NOTE: PLEASE NOTE MEANS OF BEING ABLE | | TO SHUT DOWN GENERATOR TO BE GROUPED | | WITH MAINS? 230-72, 230-76,230-79 | | | | 5)NOTE: PLEASE NOTE THAT FIRE PUMP ROOM | | IS SHOWN ON SECOND FLOOR, WHERE IS MAIN | | ELECTRICAL ROOM? | | | | 6)NOTE: PLEASE NOTE COMPLETE CONCRETE | | ENCASEMENT OF SERVICE ENTRANCE CONDUCTOR | | S, NO MORETHAN 8' OF UNPROTECTED CONDUCT | | -ORS INSIDE THE BLDG. PER LOCAL AMEND. | | 230-70A | | | | 7)NOTE: PLEASE NOTE PANEL "A" NOT | | COMPLETED. | | | | 8)NOTE: PLEASE NOTE NO OCP SHOWN FOR | | ALL MAINS FOR APT PANELS??? | | | | 9)NOTE: PLEASE NOTE, ON E3-2 RISER SHOWS | | 12H AND 12E AND YET E3-1 DOES NOT SHOW | | WHERE THESE ARE FED FROM? PANEL "DE" | | DOES NOT SHOW? | | | | 10)NOTE: PLEASE NOTE GROUNDING ELECTRODE | | CONDUCTOR SIZE PER 250-66 NEEDS TO BE | | SHOWN ON E3-3 | | | | PLEASE NOTE THAT THERE ARE MANY ITEMS | | ON E3-1 THAT NEED TO BE ADDRESSED. | | | | 11)NOTE: PLEASE NOTE NO OCP SHOWN FOR | | FIRE PUMP, FROM FIRE PUMP CONTROL PANEL, | | AND FIRE PUMP ATS. | | | | 12)NOTE: PLEASE NOTE CONDUCTOR TO FIRE | | PUMP ARE SHOWN AT 250MCM??, PLEASE SEE | | SIZING PER LOAD OF PUMP 430-150 AND | | CONDCUTOR SIZES PER 310-16. | | | | 13)NOTE: PLEASE NOTE OCP PER 695-4-B-1 | | | | 14)NOTE: PLEASE NOTE THAT OCP ON GENER- | | -ATOR IS SHOWN AT 500AMPS WITH 250MCM?? | | 310-16. | | | | 15)NOTE: PLEASE NOTE THAT CONDCUTOR SIZE | | FOR 400A ATS MAIN IS SHOWN AT 4/0? | | 310-16 FOR 400AMPS, ALSO 350MCM FROM | | ATS TO PANEL "DE" ON 400A OCP?? | | | | 16)NOTE: PLEASE NOTE THAT NO CONDCUTOR | | SIZE IS SHOWN COMING FROM FPL TO 600A | | PANEL"DH"??? | | | | 17)NOTE: PLEASE NOTE THAT THERE ARE NO | | VOLTAGES SHOWN FOR PANEL"DH" ON PANEL | | SCHEDULE. | | | | 18)NOTE:PLEASE SUBMIT AIC RATINGS FOR | | ALL NEW EQUIPMENT BEING INSTALLED. | | MAINS/PANELS/BREAKERS MUST BE RATED FOR | | THE AVAILABLE FAULT CURRENT PER 110-9. | | PANEL"DH" "DE" ETC | | | | 19)NOTE: PLEASE NOTE THAT THERE ARE NO | | PANEL SCHEDULES SUBMITTED FOR ALL HOUSE | | PANELS, NOT TO INCLUDE CIRCUIT SCHEDULE | | ON E1-2. | | | | 21)NOTE:PLEASE NOTE THAT THE GENERATOR | | IS TO BE SIZED PER 695-B-1. PLEASE | | NOTE THAT LOAD EXCEEDS RATING OF GEN. | | PLEASE CLARIFY HOW AUTOMATIC SHEDDING | | OF LOADS WILL TAKE PLACE??? | | | | 22)NOTE: PLEASE PLACE NOTE ON PLANS FOR | | COLOR CODING OF FEDDERS PER LOCAL | | AMENDMENTS 215-8 277/480V BR/PURP/YELLOW | | GRAY, 120/208 BLK/RED/BLUE. | | | | 23)NOTE: PLEASE CLARIFY GROUNDING SIZE | | OF CONDCUCTOR FOR GENERATOR AS #4,??? | | | | | | PLEASE SUBMIT THE ABOVE INFORMATION FOR | | REVIEW. IF THERE ARE ANY QUESTIONS, | | PLEASE CALL. PLEASE CALL TO SET UP A | | MEETING IN PERSON TO CLARIFY ITEMS THAT | | MAY BE MORE CLEAR IN PERSON. | | | | DEWEY PALMER | | ELECTRICAL PLAN REVIEW | | 561-659-8096 EXT 8372 |
|
|
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
2 |
Status |
P |
Date |
2003-10-10 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2003-10-09 |
Time |
16:09 |
Rev Time |
0.00 |
Received By |
mamini |
Date |
2001-10-18 |
Time |
10:55 |
Sent To |
|
|
Notes |
2001-10-18 00:00:00 | N/A | | 1. SEE PERMIT # 01091474 FOR CIVIL/ SITE | | WORK. MOHAMMAD R. AMINI |
|
|
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
1 |
Status |
F |
Date |
2001-10-05 |
|
|
Cont ID |
|
Sent By |
mamini |
Date |
2001-10-05 |
Time |
10:45 |
Rev Time |
3.00 |
Received By |
mamini |
Date |
2001-10-05 |
Time |
10:24 |
Sent To |
|
|
Notes |
2001-10-05 00:00:00 | FAILED: | | 1. INSUFFICENT INFORMATIONS FOR CIVIL | | ENGINEERING REVIEW, PLEASE SUBMIT CIVIL | | PLANS FOR OUR REVIEW AND APPROVAL WHEN | | PLANS ARE COMPLETELY DEVELOPED. | | 2. CIVIL PLANS SUBMITTAL SHOULD INCLUDE | | STORM WATER CALCULATIONS, PERVIOUS & | | IMPERVIOUS CALCULATIONS FOR ENTIRE SITE | | AND POLLUTION PREVENTION PLAN. | | 3. WE RECOMMEND A SEPARATE PERMIT | | APPLICATION FOR UNDERGROUND UTILITIES | | AND SITE WORKS. | | | | IF ANY QUESTIONS PLEASE CONTACT 659-8096 | | EXT. 8492 MOHAMMAD R. AMINI |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
10 |
Status |
P |
Date |
2003-10-03 |
|
|
Cont ID |
|
Sent By |
mcarsill |
Date |
2003-10-03 |
Time |
15:33 |
Rev Time |
0.00 |
Received By |
mcarsill |
Date |
2003-10-03 |
Time |
15:33 |
Sent To |
|
|
Notes |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
9 |
Status |
P |
Date |
2003-08-29 |
|
|
Cont ID |
|
Sent By |
mcarsill |
Date |
2003-08-29 |
Time |
15:06 |
Rev Time |
0.00 |
Received By |
mcarsill |
Date |
2003-08-29 |
Time |
15:06 |
Sent To |
|
|
Notes |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
8 |
Status |
P |
Date |
2003-07-16 |
|
|
Cont ID |
|
Sent By |
mcarsill |
Date |
2003-07-16 |
Time |
17:07 |
Rev Time |
0.00 |
Received By |
mcarsill |
Date |
2003-07-16 |
Time |
17:07 |
Sent To |
|
|
Notes |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
7 |
Status |
P |
Date |
2003-04-29 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2003-04-28 |
Time |
14:01 |
Rev Time |
0.00 |
Received By |
nmccray |
Date |
2003-04-29 |
Time |
11:34 |
Sent To |
|
|
Notes |
2003-04-29 00:00:00 | REVISION OK E1-1, E1-12, E3-1, & E3-4 |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
6 |
Status |
P |
Date |
2003-01-16 |
|
|
Cont ID |
|
Sent By |
nmccray |
Date |
2003-01-16 |
Time |
10:59 |
Rev Time |
0.00 |
Received By |
nmccray |
Date |
2003-01-16 |
Time |
10:59 |
Sent To |
|
|
Notes |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
5 |
Status |
P |
Date |
2002-09-26 |
|
|
Cont ID |
|
Sent By |
mcarsill |
Date |
2002-09-26 |
Time |
17:08 |
Rev Time |
0.00 |
Received By |
mcarsill |
Date |
2002-09-26 |
Time |
17:08 |
Sent To |
|
|
Notes |
2002-09-26 00:00:00 | THE REQUIRED FIRE PUMP WILL BE REQUIRED | | TO PROVIDE AT LEAST 750 GPM AT THE | | ROOF AT 65 PSI RESIDUAL PRESSURE AT THE | | SAME LOCATION. THE FIRE PUMP AND | | APPURTENANT EQUIPMENT ARE TO BE | | INSTALLED IN ACCORDANCE WITH NFPA 20. | | | | MIKE CARSILLO, ASSISTANT FIRE MARSHAL | | 659-8096,EXT.8497 | | 835-2910 |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
4 |
Status |
P |
Date |
2002-09-13 |
|
|
Cont ID |
|
Sent By |
mcarsill |
Date |
2002-09-13 |
Time |
17:30 |
Rev Time |
0.00 |
Received By |
mcarsill |
Date |
2002-09-13 |
Time |
17:30 |
Sent To |
|
|
Notes |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
3 |
Status |
P |
Date |
2002-04-19 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2002-07-25 |
Time |
10:34 |
Rev Time |
0.00 |
Received By |
mcarsill |
Date |
2002-04-19 |
Time |
16:50 |
Sent To |
|
|
Notes |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
2 |
Status |
F |
Date |
2002-02-26 |
|
|
Cont ID |
|
Sent By |
mcarsill |
Date |
2002-02-26 |
Time |
09:19 |
Rev Time |
0.00 |
Received By |
hpiskura |
Date |
2002-02-26 |
Time |
09:19 |
Sent To |
|
|
Notes |
2002-02-26 00:00:00 | A) PLEASE INDICATE ON THE DRAWINGS | | THAT THE TRASH CHUTE CAP WILL BE AT | | LEAST THREE FEET ABOVE THE ROOF OF | | THE BUILDING. RE: NFPA 82, SECTION | | 3-2.2.4. | | B) THE TRASH ROOM MUST BE AT LEAST | | TWO HOUR RATED WITH OPENING PROTECTIVES | | OF AT LEAST 1 1/2 RATINGS. RE: NFPA | | 82, SECTION 3-2.4.3. | | C) IT APPEARS THAT A PORTION OF THE | | UNDERGROUND FIRE LINE RUNS UNDERNEATH | | THE BUILDING'S FOUNDATION. THIS IS | | NOT PERMITTED. RE: NFPA 24, SECTION | | 8-3.1. | | D) ADDRESS REQUIRED ON BUILDING. | | E) CANVAS CANOPIES ARE TO BE FIRE | | RETARDANT. | | F) ROOF MANIFOLDS ARE REQUIRED ON THE | | ROOF. THE PLANS MAKE AT LEAST ONE | | REFERENCE TO FIRE DEPARTMENT CONNECTIONS | | BEING LOCATED ON THE ROOF. | | G) THE FIREFIGHTERS SMOKE CONTROL OR | | REMOVAL PANEL SHOULD BE LABELED WITH | | STAIRWELL LOCATIONS AND ANY OTHER | | LABELS THAT HELP PUT THE BUILDING INTO | | SOME ORIENTATION WITH REGARDS TO LAYOUT. | | H) CORRIDOR ARCH SECTION DISPLAYS | | 6'- 8" HEIGHT. PLEASE VERIFY WITH | | BUILDING OFFICIALS IF THIS IS | | ACCEPTABLE. | | I) DOES UNIT A-2, UNIT C HAVE PIPE | | CHASES. | | J) THE PLAN REVIEW RESPONSE ITEM 20 | | SHOULD BE AN ALERT TONE, FOLLOWED BY | | "AN EMERGENCY HAS BEEN REPORTED IN THE | | BUILDING, PLEASE LEAVE THE BUILDING, | | VIA THE EXITS, DO NOT USE THE ELEVATORS | | FOLLOWED AGAIN BY THE ALERT TONE. | | | | MIKE CARSILLO, ASSISTANT FIRE MARSHAL | | 659-8096,EXT.8497 | | 835-2910 |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
1 |
Status |
F |
Date |
2001-10-09 |
|
|
Cont ID |
|
Sent By |
mcarsill |
Date |
2001-10-09 |
Time |
14:23 |
Rev Time |
0.00 |
Received By |
mcarsill |
Date |
2001-10-09 |
Time |
14:23 |
Sent To |
|
|
Notes |
2001-10-09 00:00:00 | 1) SITE PLAN DOES NOT INDICATE FIRE | | HYDRANT LOCATIONS. | | 2) A DETERMINATION WILL BE REQUIRED BY | | THE BUILDING OFFICIAL OR HIS DESIGNEE | | WITH REGARDS TO THE COVERED WALKWAY. | | FS 553.895 (2) EXEMPTS AN OPEN PARKING | | GARAGE WITH A 20 FOOT SEPARATION FROM | | BEING FIRE SPRINKLER PROTECTED. THE | | COVERED PEDESTRIAN WALKWAY APPEARS TO | | CONNECT BOTH THE PARKING GARAGE AND THE | | HIGH-RISE BUILDING. | | 3) A KNOX-BOX WILL BE REQUIRED FOR FIRE | | ACCESS. | | 4) BUILDING ADDRESS REQUIRED PER CITY | | CODE 3343-00. | | 5) PLEASE CLARIFY WELL COMPACTED FIELD | | FOR FIRE TRUCK ACCESS. | | 6) A TEMPORARY STANDPIPE SYSTEM WILL | | BE REQUIRED WHEN CONSTRUCTION REACHES | | THREE STORIES AND FIFTY FEET. | | 7) STAIRS ARE TO BE CONTINIOUS WITH | | CONSTRUCTION. | | 8) PLEASE DEMONSTRATE COMPLIANCE WITH | | THE STETCHER REQUIREMENTS OF 1997 | | STANDARD BUILDING CODE. | | 9) PLEASE EXPLAIN HOW ALL OF THE | | REQUIRED DEVICES FOR THE FIRE COMMAND | | CENTER ARE GOING TO FIT INTO THE | | CLOSET PROVIDED. PLEASE SEE 1997 | | STANDARD BUILDING CODE. | | 10) PLEASE DEMONSTRATE COMPLIANCE FOR | | SMOKE CONTROL REQUIREMENTS OF 1997 | | STANDARD BUILDING CODE. | | 11) SIGNS ARE REQUIRED FOR STAIRWAYS | | INDICATING FLOOR LEVEL, TERMINUS TOP | | AND BOTTOMS AND THE IDENTITY OF THE | | STAIRS. | | 12) PLEASE INDICATE WHAT PROVISIONS | | HAVE BEEN MADE FOR FIRE RESCUE ACCESS | | FOR THE NORTH AND SOUTH GATES. WILL | | THESE GATES BE ELECTRIC OR MANUALLY | | OPERATED. IF ELECTRIC IS BATTERY | | BACK-UP AVAILABLE. SEPARATE PLANS | | AND PERMITS REQUIRED FOR SECURITY GATES. | | 13) SITE PLAN DOES NOT INDICATE THE | | LOCATION OF THE ABOVEGROUND FUEL TANK | | SHOWN ON PAGE P-12. | | 14) NO FIRE DEPARTMENT CONNECTIONS | | SHOWN ON FP-1. SINCE THE BUILDING IS | | CONSIDERED HIGH-RISE, TWO FIRE | | DEPARTMENT CONNECTIONS WILL BE REQUIRED. | | 15) AREA DIRECTLY NEXT TO ELECTRICAL | | ROOM DISPLAYS NO FIRE SPRINKLER | | PROTECTION. WHAT IS THIS AREA USED FOR. | | 16) INTERIOR FINISH INFORMATION | | REQUIRED FOR WALLS AND CEILINGS OF | | BUILDINGS. | | 17) PLEASE INDICATE THAT ATTIC SPACES | | WILL NOT BE USED FOR STORAGE. | | 18) HOW IS COMBUSTIBLE LINT REMOVED | | FROM THE DRYER EXHAUST RISERS. | | 19) NO SMOKE DETECTORS SHOWN IN | | SLEEPING ROOMS. | | 20) PLEASE INDICATE WHAT THE VOICE | | EVACUATION MESSAGE OF THE FIRE ALARM | | SYSTEM WILL SAY. | | 21) ELECTRICAL DRAWINGS APPEAR TO BE | | INCOMPLETE. | | 22) PLEASE PROVIDE MORE DETAILS ON | | SMOKE EVACUATION SYSTEM FOR THE STAIR | | TOWERS AND IDENTIFY THAT THESE SYSTEMS | | WILL BE ON EMERGENCY POWER. | | | | MIKE CARSILLO, CAPTAIN | | 659-8096,EXT.8497 | | 835-2910 |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
39 |
Status |
N |
Date |
2003-10-09 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2003-10-09 |
Time |
16:08 |
Rev Time |
0.00 |
Received By |
csiegber |
Date |
2003-10-09 |
Time |
16:08 |
Sent To |
ENG |
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
38 |
Status |
N |
Date |
2003-09-26 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2003-09-26 |
Time |
08:27 |
Rev Time |
0.00 |
Received By |
csiegber |
Date |
2003-09-26 |
Time |
08:27 |
Sent To |
|
|
Notes |
2003-09-26 00:00:00 | TO COMM BD#27 |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
37 |
Status |
N |
Date |
2003-09-24 |
|
|
Cont ID |
|
Sent By |
shernand |
Date |
2003-09-24 |
Time |
09:22 |
Rev Time |
0.00 |
Received By |
shernand |
Date |
2003-09-24 |
Time |
09:22 |
Sent To |
B |
|
Notes |
2003-09-24 00:00:00 | DON NEELY'S DESK. |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
36 |
Status |
N |
Date |
2003-09-22 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2003-09-22 |
Time |
14:15 |
Rev Time |
0.00 |
Received By |
csiegber |
Date |
2003-09-22 |
Time |
14:15 |
Sent To |
B |
|
Notes |
2003-09-22 00:00:00 | TO HP DESK |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
35 |
Status |
N |
Date |
2003-08-27 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2003-08-27 |
Time |
14:54 |
Rev Time |
0.00 |
Received By |
csiegber |
Date |
2003-08-27 |
Time |
14:53 |
Sent To |
B |
|
Notes |
2003-08-27 00:00:00 | TO HP DESK (HANDRAIL SPACING) |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
34 |
Status |
N |
Date |
2003-08-22 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2003-08-22 |
Time |
16:03 |
Rev Time |
0.00 |
Received By |
csiegber |
Date |
2003-08-22 |
Time |
16:03 |
Sent To |
B |
|
Notes |
2003-08-22 00:00:00 | TO HP DESK |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
33 |
Status |
N |
Date |
2003-08-22 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2003-08-22 |
Time |
16:01 |
Rev Time |
0.00 |
Received By |
csiegber |
Date |
2003-08-22 |
Time |
16:01 |
Sent To |
E |
|
Notes |
2003-08-22 00:00:00 | TO DP DESK |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
32 |
Status |
N |
Date |
2003-08-19 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2003-08-19 |
Time |
15:39 |
Rev Time |
0.00 |
Received By |
csiegber |
Date |
2003-08-19 |
Time |
15:39 |
Sent To |
E |
|
Notes |
2003-08-19 00:00:00 | TO DP DESK |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
31 |
Status |
N |
Date |
2003-08-19 |
|
|
Cont ID |
|
Sent By |
csiegber |
Date |
2003-08-19 |
Time |
15:37 |
Rev Time |
0.00 |
Received By |
csiegber |
Date |
2003-08-19 |
Time |
15:36 |
Sent To |
B |
|
Notes |
2003-08-19 00:00:00 | TO HP DESK |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
30 |
Status |
N |
Date |
2003-08-12 |
|
|
Cont ID |
|
Sent By |
dbaxter |
Date |
2003-08-12 |
Time |
14:01 |
Rev Time |
0.00 |
Received By |
dbaxter |
Date |
2003-08-12 |
Time |
14:01 |
Sent To |
E |
|
Notes |
2003-08-12 00:00:00 | TO ELEC. BOX. |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
29 |
Status |
N |
Date |
2003-08-08 |
|
|
Cont ID |
|
Sent By |
alange |
Date |
2003-08-08 |
Time |
16:03 |
Rev Time |
0.00 |
Received By |
alange |
Date |
2003-08-08 |
Time |
16:03 |
Sent To |
E |
|
Notes |
2003-08-08 00:00:00 | TO D PALMER DESK |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
28 |
Status |
N |
Date |
2003-08-06 |
|
|
Cont ID |
|
Sent By |
alange |
Date |
2003-08-06 |
Time |
16:29 |
Rev Time |
0.00 |
Received By |
alange |
Date |
2003-08-06 |
Time |
16:29 |
Sent To |
|
|
Notes |
2003-08-06 00:00:00 | TO COMM BD #60 |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
27 |
Status |
N |
Date |
2003-08-05 |
|
|
Cont ID |
|
Sent By |
alange |
Date |
2003-08-05 |
Time |
14:58 |
Rev Time |
0.00 |
Received By |
alange |
Date |
2003-08-05 |
Time |
14:58 |
Sent To |
E |
|
Notes |
2003-08-05 00:00:00 | TO DP DESK |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
26 |
Status |
N |
Date |
2003-08-04 |
|
|
Cont ID |
|
Sent By |
alange |
Date |
2003-08-04 |
Time |
16:05 |
Rev Time |
0.00 |
Received By |
alange |
Date |
2003-08-04 |
Time |
16:05 |
Sent To |
P |
|
Notes |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
25 |
Status |
N |
Date |
2003-08-04 |
|
|
Cont ID |
|
Sent By |
alange |
Date |
2003-08-04 |
Time |
15:50 |
Rev Time |
0.00 |
Received By |
alange |
Date |
2003-08-04 |
Time |
15:50 |
Sent To |
E |
|
Notes |
2003-08-04 00:00:00 | TO DP DESK |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
24 |
Status |
N |
Date |
2003-07-31 |
|
|
Cont ID |
|
Sent By |
alange |
Date |
2003-07-31 |
Time |
09:25 |
Rev Time |
0.00 |
Received By |
alange |
Date |
2003-07-31 |
Time |
09:25 |
Sent To |
B |
|
Notes |
2003-07-31 00:00:00 | TO HP DESK |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
23 |
Status |
N |
Date |
2003-07-02 |
|
|
Cont ID |
|
Sent By |
shernand |
Date |
2003-07-02 |
Time |
12:23 |
Rev Time |
0.00 |
Received By |
shernand |
Date |
2003-07-02 |
Time |
12:23 |
Sent To |
B |
|
Notes |
2003-07-02 00:00:00 | HP DESK, REVISED STOREFRONT SUBMITTALS. |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
22 |
Status |
N |
Date |
2003-07-02 |
|
|
Cont ID |
|
Sent By |
shernand |
Date |
2003-07-02 |
Time |
12:18 |
Rev Time |
0.00 |
Received By |
shernand |
Date |
2003-07-02 |
Time |
12:17 |
Sent To |
|
|
Notes |
2003-07-02 00:00:00 | COMM BOARD #52TWO REVISIONS. ONE | | PACKET TO HP DESK.IN BOX IS REVISIONS | | TO P,E,B. |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
21 |
Status |
N |
Date |
2003-06-30 |
|
|
Cont ID |
|
Sent By |
shernand |
Date |
2003-06-30 |
Time |
16:51 |
Rev Time |
0.00 |
Received By |
shernand |
Date |
2003-06-30 |
Time |
16:51 |
Sent To |
B |
|
Notes |
2003-06-30 00:00:00 | HP DESK |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
20 |
Status |
N |
Date |
2003-06-27 |
|
|
Cont ID |
|
Sent By |
shernand |
Date |
2003-06-27 |
Time |
16:07 |
Rev Time |
0.00 |
Received By |
shernand |
Date |
2003-06-27 |
Time |
16:07 |
Sent To |
|
|
Notes |
2003-06-27 00:00:00 | COMM BOARD #44 |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
19 |
Status |
N |
Date |
2003-05-19 |
|
|
Cont ID |
|
Sent By |
shernand |
Date |
2003-05-19 |
Time |
09:44 |
Rev Time |
0.00 |
Received By |
shernand |
Date |
2003-05-19 |
Time |
09:44 |
Sent To |
B |
|
Notes |
2003-05-19 00:00:00 | HP DESK |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
18 |
Status |
N |
Date |
2003-05-07 |
|
|
Cont ID |
|
Sent By |
shernand |
Date |
2003-05-07 |
Time |
13:22 |
Rev Time |
0.00 |
Received By |
shernand |
Date |
2003-05-07 |
Time |
13:22 |
Sent To |
B |
|
Notes |
2003-05-07 00:00:00 | HP DESK. TWO SUBMITTALS. |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
17 |
Status |
N |
Date |
2003-04-21 |
|
|
Cont ID |
|
Sent By |
shernand |
Date |
2003-04-21 |
Time |
16:41 |
Rev Time |
0.00 |
Received By |
shernand |
Date |
2003-04-21 |
Time |
16:41 |
Sent To |
E |
|
Notes |
2003-04-21 00:00:00 | DP DESK |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
16 |
Status |
N |
Date |
2003-04-21 |
|
|
Cont ID |
|
Sent By |
shernand |
Date |
2003-04-21 |
Time |
16:34 |
Rev Time |
0.00 |
Received By |
shernand |
Date |
2003-04-21 |
Time |
16:34 |
Sent To |
B |
|
Notes |
2003-04-21 00:00:00 | HP DESK |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
15 |
Status |
N |
Date |
2003-04-11 |
|
|
Cont ID |
|
Sent By |
shernand |
Date |
2003-04-11 |
Time |
09:08 |
Rev Time |
0.00 |
Received By |
shernand |
Date |
2003-04-11 |
Time |
09:08 |
Sent To |
|
|
Notes |
2003-04-11 00:00:00 | COMM BOARD #51 |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
14 |
Status |
N |
Date |
2003-03-11 |
|
|
Cont ID |
|
Sent By |
sthyng |
Date |
2003-03-11 |
Time |
16:23 |
Rev Time |
0.00 |
Received By |
sthyng |
Date |
2003-03-11 |
Time |
16:23 |
Sent To |
B |
|
Notes |
2003-03-11 00:00:00 | TO HP DESK |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
13 |
Status |
N |
Date |
2003-03-06 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2003-03-06 |
Time |
14:32 |
Rev Time |
0.00 |
Received By |
dpalmer |
Date |
2003-03-06 |
Time |
14:32 |
Sent To |
B |
|
Notes |
2003-03-06 00:00:00 | TO HP'S DESK, TRUSS SUBMITTALS |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
12 |
Status |
N |
Date |
2003-02-04 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2003-02-04 |
Time |
08:55 |
Rev Time |
0.00 |
Received By |
dpalmer |
Date |
2003-02-04 |
Time |
08:55 |
Sent To |
B |
|
Notes |
2003-02-04 00:00:00 | SUBMITTALS TO HHP`S DESK. DOORS. |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
11 |
Status |
N |
Date |
2003-02-04 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2003-02-04 |
Time |
08:55 |
Rev Time |
0.00 |
Received By |
dpalmer |
Date |
2003-02-04 |
Time |
08:55 |
Sent To |
B |
|
Notes |
2003-02-04 00:00:00 | SUBMITTALS TO HHP`S DESK. HANDRAILS. |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
10 |
Status |
N |
Date |
2003-02-04 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2003-02-04 |
Time |
08:54 |
Rev Time |
0.00 |
Received By |
dpalmer |
Date |
2003-02-04 |
Time |
08:54 |
Sent To |
B |
|
Notes |
2003-02-04 00:00:00 | SUBMITTALS TO HHP`S DESK. TRUSS. |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
9 |
Status |
N |
Date |
2003-01-24 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2003-01-24 |
Time |
11:36 |
Rev Time |
0.00 |
Received By |
dpalmer |
Date |
2003-01-24 |
Time |
11:36 |
Sent To |
B |
|
Notes |
2003-01-24 00:00:00 | SUBMITTALS TO HAROLD P'S DESK FIXED | | WINDOWS. |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
8 |
Status |
N |
Date |
2003-01-24 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2003-01-24 |
Time |
11:35 |
Rev Time |
0.00 |
Received By |
dpalmer |
Date |
2003-01-24 |
Time |
11:35 |
Sent To |
B |
|
Notes |
2003-01-24 00:00:00 | SUBMIT ROOF BEAM ETC TO HAROLD P'S DESK. |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
7 |
Status |
N |
Date |
2003-01-06 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2003-01-06 |
Time |
16:51 |
Rev Time |
0.00 |
Received By |
dpalmer |
Date |
2003-01-06 |
Time |
16:51 |
Sent To |
B |
|
Notes |
2003-01-06 00:00:00 | TO DON NEELY'S DESK. |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
6 |
Status |
N |
Date |
2002-12-23 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2002-12-23 |
Time |
18:09 |
Rev Time |
0.00 |
Received By |
dpalmer |
Date |
2002-12-23 |
Time |
18:09 |
Sent To |
B |
|
Notes |
2002-12-23 00:00:00 | TO HHP DESK. |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
5 |
Status |
N |
Date |
2002-12-23 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2002-12-23 |
Time |
12:26 |
Rev Time |
0.00 |
Received By |
dpalmer |
Date |
2002-12-23 |
Time |
12:26 |
Sent To |
|
|
Notes |
2002-12-23 00:00:00 | TO COMM BOARD #50 |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
4 |
Status |
N |
Date |
2002-11-12 |
|
|
Cont ID |
|
Sent By |
btrobaug |
Date |
2002-11-12 |
Time |
17:58 |
Rev Time |
0.00 |
Received By |
btrobaug |
Date |
2002-11-12 |
Time |
17:58 |
Sent To |
B |
|
Notes |
2002-11-12 00:00:00 | TO HAROLD P./WRT |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
3 |
Status |
N |
Date |
2002-11-07 |
|
|
Cont ID |
|
Sent By |
btrobaug |
Date |
2002-11-07 |
Time |
11:16 |
Rev Time |
0.00 |
Received By |
btrobaug |
Date |
2002-11-07 |
Time |
11:15 |
Sent To |
B |
|
Notes |
2002-11-07 00:00:00 | TO HAROLD P./WRT |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
2 |
Status |
N |
Date |
2002-10-29 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2002-10-29 |
Time |
07:03 |
Rev Time |
0.00 |
Received By |
dpalmer |
Date |
2002-10-28 |
Time |
07:03 |
Sent To |
B |
|
Notes |
2002-10-29 00:00:00 | SUBMITTALS |
|
|
Review Stop |
I |
INCOMING/PROCESSING |
Rev No |
1 |
Status |
N |
Date |
2002-10-28 |
|
|
Cont ID |
|
Sent By |
btrobaug |
Date |
2002-10-28 |
Time |
14:18 |
Rev Time |
0.00 |
Received By |
btrobaug |
Date |
|
Time |
|
Sent To |
E |
|
Notes |
2002-10-28 00:00:00 | TO "E" IN BOX./WRT. |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
10 |
Status |
P |
Date |
2003-09-02 |
|
|
Cont ID |
|
Sent By |
pkrauss |
Date |
2003-09-02 |
Time |
07:41 |
Rev Time |
1.25 |
Received By |
pkrauss |
Date |
2003-09-02 |
Time |
07:41 |
Sent To |
|
|
Notes |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
9 |
Status |
P |
Date |
2003-04-15 |
|
|
Cont ID |
|
Sent By |
pkrauss |
Date |
2003-04-15 |
Time |
15:19 |
Rev Time |
0.40 |
Received By |
pkrauss |
Date |
2003-04-15 |
Time |
15:01 |
Sent To |
|
|
Notes |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
8 |
Status |
F |
Date |
2003-03-06 |
|
|
Cont ID |
|
Sent By |
pkrauss |
Date |
2003-03-06 |
Time |
09:22 |
Rev Time |
0.55 |
Received By |
pkrauss |
Date |
2003-03-06 |
Time |
09:09 |
Sent To |
|
|
Notes |
2003-03-06 00:00:00 | DENIED:MECHANICAL PERMIT 02041735 | | | | 1.DUCT PENETRATING "FIRE ROOM" HAS | | CHANGED TO FLEX.THIS IS A ONE HOUR | | PARTITION WALL, AS PER 1997 SMC 610.1.3 | | EXCEPTIONS FOR LOCATION OF FIRE DAMPERS | | SHALL COMPLY WITH #3 ITEMS 1 THRU 4. | | | | 1. DUCT SHALL NOT EXCEED 100 SQ IN | | 2. DUCT SHALL BE OF .0217" MIN STEEL. | | 3. DUCT SHALL CONTINUE W/NO OPENINGS | | FOR NOT LESS THAN 5' FROM RATED | | WALL. | | 4. DUCT SHALL BE INSTALLED ABOVE A | | CEILING. | | PLEASE NOTE DUCT COMPLIES WITH ITEMS 1 | | AND 4. | | | | 2.CLARIFY DUCT PENETRATION THROUGH | | BATHROOM1 HR PATITION WALL.NO FIRE | | INDICATED ON PLAN. | | | | IF YOU HAVE ANY QUESTIONS, PLEASE | | CONTACT PATTY KRAUSS AT 659-8096 | | EXT. 8388. |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
7 |
Status |
P |
Date |
2003-01-07 |
|
|
Cont ID |
|
Sent By |
pkrauss |
Date |
2003-01-07 |
Time |
13:46 |
Rev Time |
0.50 |
Received By |
pkrauss |
Date |
2003-01-07 |
Time |
13:04 |
Sent To |
|
|
Notes |
2003-01-07 00:00:00 | MECHANICAL PERMIT 02041735 | | | | PROVISO: | | PLAN SHEET M-7 SEF-1, PLEASE NOTE | | LOCATION OF SEF-1 IN REFERENCE TO SPF-2, | | SHOULD BOTH SYSTEMS BE ACTIVATED WILL | | SPF-2 PULL SMOKE INTO THE STAIRWELL? | | PLEASE ADVISE. | | | | IF YOU HAVE ANY QUESTIONS, PLEASE | | CONTACT PATTY KRAUSS AT 659-8096 | | EXT. 8388. |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
6 |
Status |
P |
Date |
2002-09-27 |
|
|
Cont ID |
|
Sent By |
pkrauss |
Date |
2002-09-27 |
Time |
09:16 |
Rev Time |
0.45 |
Received By |
pkrauss |
Date |
2002-09-27 |
Time |
08:06 |
Sent To |
|
|
Notes |
2002-09-27 00:00:00 | REVISION FIRE DAMPERS FOR CORRIDOR | | PLAN SHEET M-2 ONLY | | | | ALSO SUBMITTALS FOR CONTROLS |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
5 |
Status |
P |
Date |
2002-08-07 |
|
|
Cont ID |
|
Sent By |
pkrauss |
Date |
2002-08-07 |
Time |
14:47 |
Rev Time |
1.00 |
Received By |
pkrauss |
Date |
2002-08-07 |
Time |
14:47 |
Sent To |
|
|
Notes |
2002-08-07 00:00:00 | THIS IS NOT A REVISION - SUBMITTAL DATA | | FOR VALVES, PIPE, INSULATION, ETC. |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
4 |
Status |
P |
Date |
2002-04-19 |
|
|
Cont ID |
|
Sent By |
ndenmark |
Date |
2002-04-19 |
Time |
13:50 |
Rev Time |
2.00 |
Received By |
ndenmark |
Date |
2002-04-19 |
Time |
13:50 |
Sent To |
|
|
Notes |
2002-04-19 00:00:00 | PROVISO: | | ORIGINAL LETTER FROM BUILDING OWNER (2 | | COPIES) REQUIRED TO BE SUBMITTED PRIOR | | TO FIRST INSPECTION | | | | THIRD RAISED SEAL ENGINEERS CALCULATION | | ON WINDOW OPEN AREA TO BE SUBMITTED AND | | STAMPED AND ADDED TO PLAN | | | | LETTER DETAILING ACCEPTANCE TEST FOR | | SMOKE CONTROL AND STAIR PRESSURIZATION | | TEST TO BE SUBMITTED FOR APPROVAL PRIOR | | TO BUILDING FINAL |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
3 |
Status |
F |
Date |
2002-04-11 |
|
|
Cont ID |
|
Sent By |
pkrauss |
Date |
2002-04-01 |
Time |
13:52 |
Rev Time |
1.30 |
Received By |
pkrauss |
Date |
2002-04-01 |
Time |
12:14 |
Sent To |
|
|
Notes |
2002-04-01 00:00:00 | | | PLEASE CLARIFY THE SEQUENCE OF OPERATION | | FOR THE CORRIDOR (PLAN SHEET M-16).AS | | PER NFPA 92A 1.5.2, THE PRIMARY MEANS | | OF CONTROLLING SMOKE MOVEMENT IS BY | | CREATING AIR PRESSURE DIFFERENCES | | ACROSS PARTIONS, FLOORS AND OTHER | | BUILDING COMPONENTS.THE BASIC CONCEPT | | OF BUILDING PRESSURIZATION IS TO | | ESTABLISH A HIGHER PRESSURE IN ADJACENT | | SPACES THAN IN THE SMOKE ZONE.THE | | SEQUENCE OF OPERATION AS DESCRIBED ON | | PLAN SHEET M-15, INDICATES THE OPPOSITE | | OF WHAT IS REQUIRED BY NFPA 92A.SMOKE | | ZONE IS POSITIVE AND OTHER FLOORS ARE | | NEGATIVE. | | | | CONTACT CHIEF MECHANICAL INSPECTOR | | (NANCY DENMARK), FOR MEETING ON THE | | TEST CRITERIA FOR SMOKE CONTROL SYSTEM. | | | | PLEASE NOTE DRYERS TO BE INSTALLED AT | | FINAL INSPECTION. | | | | IF YOU HAVE ANY QUESTIONS, PLEASE | | CONTACT PATTY KRAUSS AT 659-8096 | | EXT. 8388. | | | | SPOKE WITH RALPH PENA (ENG) - SHOW | | COMPLIANCE WITH 1997 SBC 412.5. |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
2 |
Status |
F |
Date |
2002-02-26 |
|
|
Cont ID |
|
Sent By |
pkrauss |
Date |
2002-02-26 |
Time |
13:04 |
Rev Time |
2.00 |
Received By |
pkrauss |
Date |
2002-02-26 |
Time |
13:04 |
Sent To |
|
|
Notes |
2002-02-26 00:00:00 | | | PLAN SHEET M-8 GENERAL NOTES #1. A., | | ALL WORK SHALL BE IN ACCORDANCE WITH | | SOUTH FLORIDA BUILDING CODE.PLANS ARE | | REVIEWED UNDER THE 1997 STANDARD | | MECHANICAL CODE NOT THE SOUTH FLORIDA | | BUILDING CODE. | | | | PLAN SHEET M-5 DETAILS FOR DRYER | | EXHAUST, AS PER 1997 SMC 509.3 | | RESIDENTIAL DRYER EXHAUST SHALL BE A | | MAXIMUM OF 25 FT WITH A 5 FT REDUCTION | | FOR EACH 90 DEGREE BEND AND 2 1/2 FT | | REDUCTION FOR EACH 45 DEGREE BEND. | | DRYER EXHAUST IS GREATER THAN THE 25 FT | | ALLOWANCE.INDICATE HOW COMBUSTIBLE | | LINT IS TO BE REMOVED FROM THE DRYER | | EXHAUST. | | | | PLEASE NOTE ON THE TOILET EXHAUST RISER | | AS PER COUNTYWIDE AMENDMENTS 1997 SMC | | 610.1.3 #2, SUBDUCT MUST BE A MINIMUM | | OF 26 GA. GALVANIZED OR EQUIVALENT. | | RISERS WHICH ARE SUBJECT TO MOISTURE | | SHALL BE LINED WITH SUITABLE MATERIAL | | TO PREVENT DETERIORATION OF DRYWALL | | ENCLOSURE. WHERE BRANCH DUCTS CONNECT TO | | RETURN RISERS, SUBDUCT SHALL BE CARRIED | | UPWARD 22" INSIDE THE RISER DUCT. | | | | IF YOU HAVE ANY QUESTIONS, PLEASE | | CONTACT PATTY KRAUSS AT 659-8096 | | EXT. 8388. |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
1 |
Status |
F |
Date |
2001-10-17 |
|
|
Cont ID |
|
Sent By |
pkrauss |
Date |
2001-10-17 |
Time |
11:07 |
Rev Time |
8.00 |
Received By |
pkrauss |
Date |
2001-10-16 |
Time |
09:02 |
Sent To |
|
|
Notes |
2001-10-17 00:00:00 | ********************DENIED************** | | | | 1.PROVIDE CLARIFICATION OF THE SMOKE | | EVAC FOR THE CORRIDORS ON FLOORS 2 | | THRU 15.NOTE ON PLAN SHEET M-8 | | INDICATE RTU 1 & 2 FAN MOTOR WILL | | CONTINUE TO RUN. PROVIDE SEQUENCE OF | | OPERATION FOR THE MOTORZIED DAMPERS | | INDICATED ON PLAN SHEET M-4. | | | | 2.PROVIDE INFORMATION FOR SEQUENCE OF | | OPERATION FOR GROUND FLOOR SMOKE | | EVAC. | | | | 3.PROVIDE CALCULATIONS AS PER 1997 | | SBC 412.5. | | | | 4.PROVIDE INFORMATION AS TO THE GROUND | | FLOOR RETURN AIR PLENUM.PLAN SHEET | | M-7 INDICATES RETURN AIR GRILLS IN | | THE VARIOUS OFFICES AND FITNESS | | CENTER.THERE IS NO INDICATION HOW | | THE AIR IS BEING RETURNED BACK TO | | THE AIR HANDLER BE MEANS OF DUCTWORK | | OR TRANSFER DUCTS. | | | | 5.CLARIFY ALSO IF THESE AREAS WERE | | TAKEN INTO CONSIDERATION IN THE | | DESIGN OF THE SMOKE EVAC TO THIS | | FLOOR. | | | | 6.SUBMIT TEST CRITERIA FOR THE SMOKE | | EVAC SYSTEM. | | | | 7.ONLY ONE FIRE DAMPER IS DESIGNATED | | ON THE GROUND FLOOR.THE CORRIDOR | | LOOKS TO HAVE A FIRE RATING OF 1 HR. | | EXPLAIN WHY THE OTHER PENETRATIONS | | ARE NOT PROTECTED. | | | | 8.PROVIDE CALCULATIONS FOR STAIRWELL | | PRESSURIZATION. | | | | PLEASE NOTE, STAIRWELL PRESSURIZATION | | SHALL BE TESTED WITH ALL DOORS CLOSED | | AND ALSO WITH ONE EXTERIOR DOOR PROPPED | | OPEN APPROXIMATELY 5" SIMULATING PEOPLE | | EXITING IN AN EMERGENCY SITUATION.AN | | INDEPENDANT TEST AND BALANCE COMPANY AND | | THE ENGINEER OF RECORD SHOULD ATTEND THE | | FINAL TESTING. | | | | 9.PROVIDE RISER DIAGRAM FOR SPRINKLER | | SYSTEM FOR INDICATING LOCATION OF | | SPRINKLER HEADS AND ACCESS DOORS | | FOR MAINTENANCE FOR THE TRASH CHUTE | | AS WELL AS THE DRYER VENT SHAFT. | | 1997 SBC 705.4.2.6. | | | | 10. PLEASE CLARIFY SEPARATION OF DRYER | | EXHAUST AND TOILET EXHAUST SHARING | | THE 2 HOUR RATED SHAFT.PROVIDE A | | DETAIL SHOWING HOW THE SUB-DUCT IS | | SUPPORTED IN THE SHAFT. | | | | 11. PLEASE NOTE THE ACCESS DOOR ON PLAN | | SHEET M-10 FOR THE DRYER EXHAUST IS | | NOT ACCESSIBLE. | | | | 12. PROVIDE INFORMATION ON HOW THE | | COMBUSTIBLE LINT IS TO BE REMOVED | | FROM THE SHAFT. | | | | 13. PLAN SHEET M-3, CLARIFY THE EXHAUST | | DUCT RUNNING THRU OR TERMINATING IN | | THE STAIRWELL. | | | | 14. M-3, ON THE SOUTHEAST ROOF THE | | DRYER VENT CLOSE PROXIMTY TO THE | | CONDENSER UNITS. | | | | 15. PLAN SHEET M-12 FAN COIL UNIT | | MOUNTING DETAIL, AUXILIARY DRAIN PAN | | WITH OVERFLOW PROTECTION BY MEANS OF | | A FLOAT SWITCH A SEPARATE DRAIN | | TERMINATING AT A CONSPICUOUS POINT | | TO SERVE AS AN ALARM THAT REGULAR | | LINE IS RESTRICTED. 1997 SMC | | 304.8.6.1. | | | | 16. PLAN SHEET M-13 DETAIL OF CONDENSING | | UNIT SUPPORTS.MINIMUM OF 18" | | BETWEEN THE ROOF SURFACE AND THE | | BOTTOM OF THE SUPPORT RAIL AS PER | | COUNTYWIDE AMENDMENTS 1997 SMC | | 304.2.5. | | | | 17. CONDENSER UNIT LOCATION SHALL COMPLY | | WITH 1997 SMC 304.7.2, A MINIMUM OF | | 30" OF CLEAR SPACE ON THE SERVICE | | SIDE FOR INSPECTION AND SERVICING OF | | CONDENSING UNITS OR COMPRESSOR UNITS | | SHALL BE PROVIDED. | | | | 18. PROVIDE LOCATION OF FUEL TANK. | | | | 19. ADDITIONAL PERMIT REQUIRED FOR FUEL. | | PLEASE PROVIDE PLANS WITH PERMIT | | APPLICATION. | | | | IF YOU HAVE ANY QUESTIONS, PLEASE | | CONTACT PATTY KRAUSS AT 659-8096 | | EXT. 8388. |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
9 |
Status |
P |
Date |
2003-09-04 |
|
|
Cont ID |
|
Sent By |
kstevens |
Date |
2003-09-04 |
Time |
10:28 |
Rev Time |
1.25 |
Received By |
kstevens |
Date |
2003-09-04 |
Time |
10:28 |
Sent To |
|
|
Notes |
2003-09-04 00:00:00 | REVISION OK - SHEET P1-A |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
8 |
Status |
P |
Date |
2003-08-22 |
|
|
Cont ID |
|
Sent By |
kstevens |
Date |
2003-08-22 |
Time |
15:22 |
Rev Time |
0.50 |
Received By |
kstevens |
Date |
2003-08-22 |
Time |
15:22 |
Sent To |
|
|
Notes |
2003-08-22 00:00:00 | REVISION OK - SCUPPER DETAIL - |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
7 |
Status |
P |
Date |
2003-07-14 |
|
|
Cont ID |
|
Sent By |
kstevens |
Date |
2003-07-14 |
Time |
12:02 |
Rev Time |
1.00 |
Received By |
kstevens |
Date |
2003-07-14 |
Time |
12:01 |
Sent To |
|
|
Notes |
2003-07-14 00:00:00 | REVISION OK - SANT. RISER DIAGRAM - | | WATER RISER DIAGRAM - DELETED W/C MEN'S | | ROOM AND MOVED W/H LOCATION |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
6 |
Status |
P |
Date |
2003-01-11 |
|
|
Cont ID |
|
Sent By |
kstevens |
Date |
2003-01-11 |
Time |
17:26 |
Rev Time |
0.75 |
Received By |
kstevens |
Date |
2003-01-11 |
Time |
17:26 |
Sent To |
|
|
Notes |
2003-01-11 00:00:00 | REVISION OK - REMOVE W/C - URNAL, ADD | | SUNAS, MOVE SHOWERS, MOVE BAR SINK IN | | CLUBHOUSE, ADD OUTDOOR SHOWER AT CABANA |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
5 |
Status |
P |
Date |
2002-11-18 |
|
|
Cont ID |
|
Sent By |
kstevens |
Date |
2002-11-18 |
Time |
18:55 |
Rev Time |
0.50 |
Received By |
kstevens |
Date |
2002-11-18 |
Time |
18:55 |
Sent To |
|
|
Notes |
2002-11-18 00:00:00 | WATER HEATER PAN SUBMITTALS - PROVISO | | PAN TO BE LARGE ENOUGH TO DRAIN PROPERLY | | AND HEATER DRAIN VALVE SHALL BE WITHIN | | THE PAN AREA. |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
4 |
Status |
P |
Date |
2002-10-10 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2002-11-13 |
Time |
13:01 |
Rev Time |
0.00 |
Received By |
kstevens |
Date |
2002-10-10 |
Time |
16:46 |
Sent To |
|
|
Notes |
2002-10-10 00:00:00 | SUBMITTALS OK - D.F - SINK - FAUCET - | | W/H - SHR VALVE - OUT DOOR SHR |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
3 |
Status |
P |
Date |
2002-08-16 |
|
|
Cont ID |
|
Sent By |
kstevens |
Date |
2002-08-16 |
Time |
07:56 |
Rev Time |
0.00 |
Received By |
kstevens |
Date |
2002-08-16 |
Time |
07:56 |
Sent To |
|
|
Notes |
2002-08-16 00:00:00 | SUBMITTALS OK - FIXTURES & TRIM, PIPING, | | DRAINS, BOOSTER PUMP |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
2 |
Status |
P |
Date |
2002-02-25 |
|
|
Cont ID |
|
Sent By |
kstevens |
Date |
2002-02-25 |
Time |
16:12 |
Rev Time |
1.50 |
Received By |
kstevens |
Date |
2002-02-25 |
Time |
16:11 |
Sent To |
|
|
Notes |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
F |
Date |
2001-10-20 |
|
|
Cont ID |
|
Sent By |
pschmitz |
Date |
2001-10-20 |
Time |
13:23 |
Rev Time |
4.00 |
Received By |
pschmitz |
Date |
|
Time |
|
Sent To |
|
|
Notes |
2001-10-20 00:00:00 | PLUMBING PLAN REVIEW,DENIED | | CODE REFERENCE,STD PLUMBING CODE 94 | | (1)SHT A20,NOTE 7,FACBC-97 NOT APPROVED | | COMPLY WITH FAIR HOUSING ACT 24 CODE OF | | REGULATION (CFR) 100.205 (C)(IV), | | REVISED APRIL 1998, DESIGN MANUAL. | | REQUIRMENTS 1 THRU 7,SPECIFY OPTION "A" | | OR "B". SHOW MANEUVERING AND CLEAR FLOOR | | SPACE, REQUIRMENT 7 AND REINFORCED WALL | | AREAS, AS OUT LINED IN DESIGN MANUAL. | | (2) SHT A28 DETAIL 4,PROVIDE A ISOMETRIC | | DRAWING OF ROOF DRAINAGE WITH PIPE SIZES | | , SQUARE FOOTAGE; ALSO INCLUDE 1/2 THE | | VERTIAL WALLS AND UPPER ROOFS. | | PROVIDE CALCULATIONS FOR THE SECONDARY | | DRAINAGE, INCLUDE 1/2 THE VERTIAL WALLS | | AND UPPER ROOFS. SEC 1108,1108.3,1109. | | (3A)SHT P1 PROVIDE A COMPLETE PLAN VIEW | | OF THE UNDER GROUND STORM AND SANITARY | | BUILDING DRAINAGE SYSTEM,SHOW PIPE SIZES | | AND THE LOAD ON EACH SYSTEM, SEC 104.3 | | (B) TRASH ROOM DRAIN NOT APPROVED TO | | STORM DRAINAGE. SEC 701.5 | | (C) SANITARY BUILDING DRAINS, 4" THRU 6" | | CLEANOUTS NOT MORE THAN 80 FT INTERVALS. | | SEC 710.2.4 (2) | | (4) SHT P6 SPECIFY TYPE OF SHOCK | | ARRESTOR AND TABLE FOR SIZING, SEC 104.3 | | (5) SHT P 12 NOTE #10 RELIEF VENT, SHOW | | VENTS ON RISER,SHTS P8,P9. SEC 104.3 AND | | SEC 916. | | END OF COMMENTS PAUL SCHMITZ | | QUESTIONS 561-659-8096X 8233 |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
P |
Date |
2001-10-04 |
|
|
Cont ID |
|
Sent By |
sgraham |
Date |
2001-10-04 |
Time |
12:31 |
Rev Time |
0.25 |
Received By |
sgraham |
Date |
|
Time |
|
Sent To |
|
|
Notes |
|
|