Plan Review Details - Permit 01090745
Plan Review Stops For Permit 01090745
Review Stop ENG ENGINEERING CSD
Rev No 1 Status N Date 2001-09-24 Cont ID  
Sent By mamini Date 2001-09-24 Time 16:19 Rev Time 0.00
Received By mamini Date   Time   Sent To  
Notes
***NONE***

Review Stop FS  
Rev No 3 Status P Date 2002-02-27 Cont ID  
Sent By mcarsill Date 2002-02-27 Time 09:12 Rev Time 0.00
Received By mcarsill Date 2002-02-27 Time 09:11 Sent To  
Notes
2002-02-27 00:00:00A) THE FIRE DEPARTMENT CONNECTION SHALL
 BE PLACED IN AN AREA THAT IS
 ACCESSIBLE TO FIRE APPARATUS. ALSO THIS
 CONNECTION IS TO BE LOCATED WITHIN
 150 FEET OF A FIRE HYDRANT. PLEASE
 VERIFY A SUITABLE LOCATION FOR THE
 FDC WITH A FIRE RESCUE REPRESENTATIVE
 FOR BUILDING # 3.
  
 MIKE CARSILLO, ASSISTANT FIRE MARSHAL
 659-8096,EXT.8497
 835-2910

Review Stop FS  
Rev No 2 Status P Date 2001-10-01 Cont ID  
Sent By mcarsill Date 2001-10-01 Time 10:28 Rev Time 0.00
Received By mcarsill Date 2001-10-01 Time 10:28 Sent To  
Notes
2001-10-01 00:00:001) THE FIRE DEPARTMENT CONNECTION SHOWN
 ON SHEET FP3 FOR THIS THREE STORY
 BUILDING IS NOT CORRECT. THE FDC MUST
 BE FACED DIFFERENTLY AS THERE IS NO
 ACCESS TO THE LOCATION IT IS SHOWN.
 ALSO THIS DEVICE MUST BE WITHIN 150
 FEET OF A FIRE HYDRANT. PLEASE SUBMIT
 A REVISION.
 2) PLEASE BE ADVISED THAT THE STANDPIPE
 SYSTEM IN BUILDING THREE MUST PROVIDE
 750 GALLONS PER MINUTE AT THE ROOF
 AT 65 PSI.
  
 MIKE CARSILLO, CAPTAIN
 659-8096,EXT.8497
 835-2910

Review Stop FS  
Rev No 1 Status F Date 2001-09-24 Cont ID  
Sent By mcarsill Date 2001-09-24 Time 10:10 Rev Time 0.00
Received By mcarsill Date 2001-09-24 Time 10:10 Sent To  
Notes
2001-09-24 00:00:001) NO FIRE DEPARTMENT CONNECTION SHOWN.
 2) CLUBHOUSE FIRE PROTECTION SHOWN.
 CLUBHOUSE FIRE SPRINKLER SYSTEM NOT
 PART OF THIS PERMIT AND SHOULD BE
 REMOVED FROM DRAWINGS.
 3) ONLY ONE FLOOR AND ROOF FIRE
 PROTECTION SHOWN. IF THE FLOOR PLAN IS
 THE SAME IT SHOULD BE NOTED AS TYPICAL
 ON THE DRAWINGS FOR ALL THREE FLOORS.
 4) PLANS ARE MISSING THE FOLLOWING
 A) POINT OF COMPASS
 B) CEILING CONSTRUCTION
 C) FULL HEIGHT CROSS SECTION
 D) LOCATION OF FIRE WALLS
 E) LOCATION OF PARTITIONS
 F) OCCUPANCY OF EACH ROOM OR AREA
 G) HANGER LOCATIONS
 H) NUMBER OF SPRINKLERS PER RISER, EACH
 FLOOR
 I) LOCATION OF ANY CONCEALED SPACES,
 ATTICS, CLOSETS.
  
 MIKE CARSILLO, CAPTAIN
 659-8096,EXT.8497
 835-2910

Review Stop M MECHANICAL (A/C)
Rev No 1 Status N Date 2001-10-01 Cont ID  
Sent By mcarsill Date 2001-10-01 Time 10:27 Rev Time 0.00
Received By mcarsill Date 2001-10-01 Time 10:27 Sent To  
Notes
***NONE***