2001-10-22 00:00:00 | THE ADDITION AND STUDIO CONVERSION MAY |
| BE SUBJECT TO IMPACT FEES COLLECTED BY |
| THE COUNTY.THE PERMIT PLANS MUST BE |
| REVIEWED AND STAMPED BY THAT OFFICE AND |
| IF FEES ARE REQUIRED, A COPY OF THE |
| PAID RECEIPT ATTACHED TO THE PERMIT |
| APPLICATION. |
| CALL 233-5025 FOR MORE INFORMATION. |
| |
| SHEET 3 OF 5.PROVIDE A DETAIL FOR THE |
| "STEEL LEDGER RIM WITH CLIPS"SEE SBC |
| 104.2. |
| |
| GIVEN THE NAILING SCHEDULE ON SHEET 5 OF |
| 5, HOW EFFECTIVE WILL THE 8D AND 10D |
| NAILS BE IN THE 16 GA STEEL JOISTS FOR |
| ATTACHING THE ROOF SHEATHING AND |
| DRYWALL CEILING? |
| |
| DETAIL THE SIMPSON STRAP CONNECTION TO |
| THE STEEL JOIST. |
| |
| WILL THE STRAP BE CONTINUOUS FROM THE |
| JOIST TO THE 2-2X10 BEAM TO THE COLUMN? |
| SHOW THE CONTINUOUS LOAD PATH. |
| |
| SHOW THE ANCHOR DETAIL FOR THE EXTERIOR |
| FRAME WALL ON THE CABANA. |
| |
| PROVIDE FOR SAFETY GLAZING IN THE |
| WINDOWS NEAR THE TUB IN THE MASTER BATH |
| AND THE SHOWER IN THE CABANA.SEE SBC |
| 2405.2.1(2). |
| |
| PROVIDE THE TEST REPORTS AND OR THE |
| NOTICE OF ACCEPTANCE REPORTS FOR THE |
| EXTERIOR GLAZED OPENINGS AND THE ROOF |
| COVERINGS. |
| |
| THE MILLER LAND SURVEYING DOES NOT HAVE |
| AN EMBOSSED SEAL AND CONTAINS A |
| DISCLAIMER WHICH INVALIDATES IT FOR |
| CONSTRUCTION AND DESIGN PURPOSES. |
| PROVIDE A SURVEY THAT IS SUITABLE FOR |
| THEINTENDED USE. |