Plan Review Details - Permit 01090488
Plan Review Stops For Permit 01090488
Review Stop E ELECTRICAL
Rev No 2 Status P Date 2001-11-13 Cont ID  
Sent By dpalmer Date 2001-11-13 Time 19:02 Rev Time 0.00
Received By aneil Date 2001-11-21 Time 14:18 Sent To P
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2001-10-02 Cont ID  
Sent By dpalmer Date 2001-10-02 Time 12:34 Rev Time 0.00
Received By dpalmer Date 2001-10-02 Time 12:34 Sent To  
Notes
2001-10-02 00:00:00*************** UNSAT ****************
  
 1)NOTE: PLEASE NOTE MISSING GROUNDING
 SYSTEM AT DETACHED STRUCTURES PER
 230-32. FOOTER STEEL FOR NEW STRUCTURES
 AND COLD WATER PIPE.
  
 2) NOTE: PLEASE LIST THE REQ`D BATH(S)
 CIRCUIT(S) PER 210-11-C-3.
 MUST BE 20A AND #12AWG.
  
 3)NOTE: PLEASE SUBMIT AIC RATINGS FOR
 ALL NEW EQUIPMENT BEING INSTALLED.
 MAINS/PANELS/BREAKERS MUST BE RATED FOR
 THE AVAILABLE FAULT CURRENT PER 110-9.
  
 PLEASE SUBMIT THE ABOVE INFORMATION FOR
 REVIEW. IF THERE ARE ANY QUESTIONS,
 PLEASE CALL.
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 561-659-8096 EXT 8372

Review Stop M MECHANICAL (A/C)
Rev No 3 Status P Date 2002-04-08 Cont ID  
Sent By pkrauss Date 2002-04-08 Time 09:33 Rev Time 0.30
Received By pkrauss Date 2002-04-08 Time 09:33 Sent To  
Notes
2002-04-08 00:00:00MECH REV PERMIT 02021715 - CHANGED DUCT
 SIZE ADDED R/A GRILLE.

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2001-11-21 Cont ID  
Sent By pkrauss Date 2001-11-21 Time 12:52 Rev Time 0.35
Received By pkrauss Date 2001-11-21 Time 12:52 Sent To R
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2001-10-04 Cont ID  
Sent By hmoser Date 2001-10-04 Time 17:03 Rev Time 0.33
Received By hmoser Date 2001-10-04 Time 17:03 Sent To  
Notes
2001-10-04 00:00:00DENIED
 NO PLANS OR ENERGY CALCS
 HAROLD MOSER [561]659-8096 EXT 8390

Review Stop P PLUMBING
Rev No 2 Status P Date 2001-11-16 Cont ID  
Sent By dpalmer Date 2001-11-13 Time 19:03 Rev Time 0.50
Received By kstevens Date 2001-11-16 Time 19:47 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2001-10-04 Cont ID  
Sent By jleech Date 2001-10-04 Time 17:10 Rev Time 0.33
Received By jleech Date 2001-10-04 Time 17:10 Sent To  
Notes
***NONE***

Review Stop R ROOF PLAN REVIEW
Rev No 3 Status P Date 2001-12-03 Cont ID  
Sent By hpiskura Date 2001-12-03 Time 14:40 Rev Time 0.00
Received By hpiskura Date   Time   Sent To  
Notes
***NONE***

Review Stop R ROOF PLAN REVIEW
Rev No 2 Status F Date 2001-11-26 Cont ID  
Sent By pkrauss Date 2001-11-21 Time 12:57 Rev Time 0.00
Received By hpiskura Date   Time   Sent To  
Notes
2001-11-26 00:00:00BEFORE A PERMIT TO CONSTRUCT MAY BE
 ISSUED THE PLANS MUST BE REVIEWED AND
 STAMPED BY THE COUNTY IMPACT FEE
 OFFICE.CALL561-233-5025 FOR MORE
 INFORMATION.
  
 PLEASE PROVIDE A RECENT SIGNED, SEALED
 AND DATED PROPERTY SURVEY THAT
 COMPLEMENTS THE SITE PLAN.
  
 PROVIDE THE TEST REPORTS FOR THE
 WINDOWS DOORS AND ROOF COVERING,
 INCLUDING THE METHOD OF HURRICANE
 MISSILE IMPACT RESISTANCE.
  
  
 THE ABOVE ITEMS WERE CITED ON THE
 10/22/01 CHECKLIST AND NOT ADDRESSED
 WITH THE PERMIT RESUBMITTAL.

Review Stop R ROOF PLAN REVIEW
Rev No 1 Status F Date 2001-10-22 Cont ID  
Sent By hpiskura Date 2001-10-22 Time 13:50 Rev Time 0.00
Received By hpiskura Date   Time   Sent To  
Notes
2001-10-22 00:00:00THE ADDITION AND STUDIO CONVERSION MAY
 BE SUBJECT TO IMPACT FEES COLLECTED BY
 THE COUNTY.THE PERMIT PLANS MUST BE
 REVIEWED AND STAMPED BY THAT OFFICE AND
 IF FEES ARE REQUIRED, A COPY OF THE
 PAID RECEIPT ATTACHED TO THE PERMIT
 APPLICATION.
 CALL 233-5025 FOR MORE INFORMATION.
  
 SHEET 3 OF 5.PROVIDE A DETAIL FOR THE
 "STEEL LEDGER RIM WITH CLIPS"SEE SBC
 104.2.
  
 GIVEN THE NAILING SCHEDULE ON SHEET 5 OF
 5, HOW EFFECTIVE WILL THE 8D AND 10D
 NAILS BE IN THE 16 GA STEEL JOISTS FOR
 ATTACHING THE ROOF SHEATHING AND
 DRYWALL CEILING?
  
 DETAIL THE SIMPSON STRAP CONNECTION TO
 THE STEEL JOIST.
  
 WILL THE STRAP BE CONTINUOUS FROM THE
 JOIST TO THE 2-2X10 BEAM TO THE COLUMN?
 SHOW THE CONTINUOUS LOAD PATH.
  
 SHOW THE ANCHOR DETAIL FOR THE EXTERIOR
 FRAME WALL ON THE CABANA.
  
 PROVIDE FOR SAFETY GLAZING IN THE
 WINDOWS NEAR THE TUB IN THE MASTER BATH
 AND THE SHOWER IN THE CABANA.SEE SBC
 2405.2.1(2).
  
 PROVIDE THE TEST REPORTS AND OR THE
 NOTICE OF ACCEPTANCE REPORTS FOR THE
 EXTERIOR GLAZED OPENINGS AND THE ROOF
 COVERINGS.
  
 THE MILLER LAND SURVEYING DOES NOT HAVE
 AN EMBOSSED SEAL AND CONTAINS A
 DISCLAIMER WHICH INVALIDATES IT FOR
 CONSTRUCTION AND DESIGN PURPOSES.
 PROVIDE A SURVEY THAT IS SUITABLE FOR
 THEINTENDED USE.

Review Stop Z ZONING
Rev No 1 Status P Date 2001-10-19 Cont ID  
Sent By sgraham Date 2001-10-19 Time 13:36 Rev Time 0.25
Received By sgraham Date   Time   Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved