Plan Review Details - Permit 01040803
Plan Review Stops For Permit 01040803
Review Stop E ELECTRICAL
Rev No 1 Status P Date 2001-05-02 Cont ID  
Sent By dpalmer Date 2001-05-02 Time 16:37 Rev Time 0.00
Received By dpalmer Date 2001-05-02 Time 16:37 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2001-05-10 Cont ID  
Sent By mcarsill Date 2001-05-10 Time 08:53 Rev Time 0.00
Received By mcarsill Date 2001-05-10 Time 08:53 Sent To  
Notes
2001-05-10 00:00:001) WET FIRE HYDRANTS ARE REQUIRED PRIOR
 TO, DURING AND AFTER CONSTRUCTION.
 2) BUILDING ADDRESSES REQUIRED PER CITY
 CODE.
 3) ELECTRIC POWERED SMOKE DETECTORS ARE
 REQUIRED ON EVERY LEVEL.
 4) PORTABLE FIRE EXTINGUISHERS ARE
 REQUIRED.
  
 CAPTAIN MIKE CARSILLO
 659-8096,EXT.8497
 835-2910

Review Stop M MECHANICAL (A/C)
Rev No 3 Status P Date 2001-11-01 Cont ID  
Sent By pkrauss Date 2001-11-01 Time 12:23 Rev Time 0.30
Received By pkrauss Date 2001-11-01 Time 12:23 Sent To  
Notes
2001-11-01 00:00:00MECH REV 01040819

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2001-09-29 Cont ID  
Sent By pkrauss Date 2001-09-29 Time 11:54 Rev Time 0.10
Received By pkrauss Date 2001-09-29 Time 11:54 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2001-05-10 Cont ID  
Sent By lsmith Date 2001-05-10 Time 15:57 Rev Time 0.33
Received By lsmith Date 2001-04-28 Time 11:05 Sent To  
Notes
2001-05-10 00:00:00PER HMOSER

Review Stop P PLUMBING
Rev No 1 Status P Date 2001-04-26 Cont ID  
Sent By kstevens Date 2001-04-26 Time 17:33 Rev Time 0.33
Received By kstevens Date 2001-04-26 Time 17:33 Sent To  
Notes
2001-04-26 00:00:00PLUMBING PLAN REVIEW. SPC-94
  
 ***PASSED***
  
 PROVISO
  
 WATER RESER DIAGRAM. - AIR CHAMBERS MUST
 COMPLY WITH 607.8.3 AND MUST BE
 ACCESSABLE AND RECHARGEABLE
  
 REVIEW BY KEN STEVENS (561) 569-8096
 EXT. 8377

Review Stop R ROOF PLAN REVIEW
Rev No 6 Status P Date 2001-09-10 Cont ID  
Sent By jgomez Date 2001-09-10 Time 10:14 Rev Time 0.25
Received By jgomez Date 2001-09-10 Time 10:14 Sent To  
Notes
2001-09-10 00:00:00TRUSS DRAWINGS REVIEW.

Review Stop R ROOF PLAN REVIEW
Rev No 5 Status F Date 2001-08-17 Cont ID  
Sent By jgomez Date 2001-08-17 Time 18:13 Rev Time 0.25
Received By jgomez Date 2001-08-17 Time 18:13 Sent To  
Notes
2001-08-17 00:00:00TRUSS DRAWINGS 3RD CHECKLIST:
  
 1-THE TWO SETS OF ENGINEERED TRUSS
 DON'T MATCH. THEY ARE TWO DIFFERENT
 SETS. ONE IS SIGNED ON JUNE 11TH AND
 THE OTHER ON JULY 25TH.
 -SET OF ENGINEERED DRAWINGS SIGNED ON
 JULY 25TH HAS TWO DIFFERENT MEAN ROOF
 HEIGHTS. ITEM THAT WAS ALREADY REVISED
 ON SET SIGNED ON JUNE 11TH.
  
  
  
  
  
  
  
 NOTES:
 -DRAWINGS ARE FILED UNDER PERMIT #:
 01040803.
 -THESE COMMENTS APPLY TO PERMIT #S:
 01040803, 01040806, 01040808 AND
 01040810.
 -THERE WILL BE ADDITIONAL RESUBMITTAL
 FEES. SEE COPY OF POLICY ATTACHED.

Review Stop R ROOF PLAN REVIEW
Rev No 4 Status F Date 2001-08-07 Cont ID  
Sent By jgomez Date 2001-08-07 Time 16:23 Rev Time 0.50
Received By jgomez Date 2001-08-07 Time 16:23 Sent To  
Notes
2001-08-07 00:00:00REVIEW OF PRODUCT APPROVALS:
 1-PROVIDE CURRENT DADE COUNTY PRODUCT
 APPROVAL FOR WINDOW MULLIONS.
 INFORMATION SUBMITTED IS NOT A
 PRODUCT APPROVAL.
  
 2-STORM PANELS, SLIDING GLASS DOORS AND
 "CAST-CRETE" LINTELS ARE APPROVED.

Review Stop R ROOF PLAN REVIEW
Rev No 3 Status F Date 2001-07-11 Cont ID  
Sent By jgomez Date 2001-07-11 Time 10:44 Rev Time 0.50
Received By jgomez Date 2001-07-10 Time 18:37 Sent To  
Notes
2001-07-10 00:00:00TRUSS DRAWINGS SECOND CHECKLIST:
  
 1-UPDATE ALL GENERAL TRUSS DETAILS AND
 SPECIFICATIONS.CLEARLY SPECIFY CODE
 USED FOR DESIGN CRITERIA.
  
 2-CLARIFY WHY THERE ARE TWO DIFFERENT
 ENGINEERS SIGNING AND SEALING THE
 GENERAL DETAILS. FOLLOW 61G15-27
 PROCEDURE TO SEAL ANOTHER'S WORK.
  
 3-PROVIDE CLEAR AND LEGIBLE COPIES OF
 GENERAL DETAILS.
  
  
 NOTE:
 THESE ITEMS WERE ADDRESSED SEVERAL TIMES
 BEFORE & STILL THE SAME PACKAGE IS
 SUBMITTED OVER AND OVER WITHOUT MAKING
 THE NECESSARY CORRECTIONS.
 SEE ATTACHED COPY OF POLICY AND
 PROCEDURE FOR IMPLEMENTATION OF PERMIT
 FEE ADJUSTMENTS.

Review Stop R ROOF PLAN REVIEW
Rev No 2 Status F Date 2001-05-30 Cont ID  
Sent By jgomez Date 2001-05-30 Time 17:46 Rev Time 1.50
Received By jgomez Date 2001-05-30 Time 17:46 Sent To  
Notes
2001-05-30 00:00:00TRUSS DRAWINGS CHECKLIST:
 1-TRUSS ENGINEER TO PROVIDE ALL HIS
 INFORMATION REQUIRED BY CHAPTER 61G15
 OF FLORIDA BOARD OF PROFESSIONAL
 ENGINEERS AND CHAPTER 471 OF FLORIDA
 STATUTES.
 -PROVIDE INFO. ON TRUSS LAYOUT AS WELL.
 2-TRUSS GENERAL DRAWINGS:
 -UPDATE DRAWINGS AS REQUIRED. SPECIFY
 CODE AND DESIGN CRITERIA USED.
 -(61G15-27): FOLLOW PROCEDURE TO SEAL
 ANOTHER'S WORK.
 -PROVIDE CLEAR, LEGIBLE AND UNCUT
 COPIES.
 3-THERE IS ONLY ONE MEAN ROOF HEIGHT FOR
 ENTIRE BUILDING. TABLE 1606.2A SBC/97.
 4-IF USING ASCE IT SHALL BE ASCE 7-95
 FOR 145MPH NOT ASCE 7-93 FOR 110MPH.
 -COVER SHEET SAYS USING SBC/97. CLARIFY
 -SOME TRUSSES ARE DESIGNED USING ASCE
 AND OTHERS ARE USING SBC. CLARIFY.
 5-ARCHITECT TO REVIEW ALL TRUSS DRAWINGS
 AFTER CORRECTIONS ARE DONE.
 6-TRUSS S15 WAS DESIGNED WITH THREE
 BEARING POINTS. ARCHITECT TO SPECIFY
 CONNECTOR AT MID BEARING POINT.
 7-ARCHITECT TO SPECIFY CONNECTOR THAT
 MEETS THE UPLIFT LOADS CALCULATED ON
 ENGINEERED TRUSSES S45, S46 AND T27.
  
  
  
 -THESE COMMENTS APPLY TO 01040803,
 01040806, 01040808 AND 01040810.
  
 -IF YOU HAVE ANY QUESTIONS, PLEASE CALL
 JULIO GOMEZ AT 659-8096 EXT. 8232.

Review Stop R ROOF PLAN REVIEW
Rev No 1 Status P Date 2001-05-12 Cont ID  
Sent By jgomez Date 2001-05-12 Time 16:38 Rev Time 1.25
Received By jgomez Date 2001-05-12 Time 16:38 Sent To  
Notes
2001-05-12 00:00:00APPROVED WITH PROVISO:
  
 1-FLOOD ZONE AO. WILL NEED TO PROVIDE
 ELEVATION CERTIFICATE.
  
 2-TOWNHOUSES ARE SEPARATED BY TWO HOUR
 FIRE RATED WALL. MODEL C HAS GLASS
 BLOCK AT ZERO LOT LINE. PROVIDE TWO
 HOUR FIRE RATED GLASS BLOCK OR CLOSE
 OPENING. SEC 704.4.2 SBC 1997.
  
 3-PROVIDE PRODUCT APPROVAL FOR:
 -SLIDING GLASS DOORS.
 -2 HOUR FIRE RATED GLASS BLOCK.
 -PRECAST LINTEL(NOTE: CURRENT PRODUCT
 APPROVAL WILL EXPIRE ON 5-21-01)
 -WINDOW MULLIONS.
  
 4-PROVIDE COMPLETE INSTALLATION SCHED.
 AND KEY PLAN FOR STORM PANELS.
  
 5-REVISE NOTE #2 ON SHEET BP-1: MAX.
 CHANGE IN LEVEL IS 1/4" OR 1/2" MAX.
 IF BEVELED. FAIR HOUSING ACT PAGE 4.4.
  
  
 NOTE:THIS COMMENTS APPLY TO THE
 FOLLOWING PERMIT #S: 01040803,
 01040806, 01040808 AND 01040810.

Review Stop Z ZONING
Rev No 1 Status P Date 2001-04-20 Cont ID  
Sent By sgraham Date 2001-04-20 Time 11:45 Rev Time 0.25
Received By sgraham Date   Time   Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved