Plan Review Stops For Permit 00100919 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
4 |
Status |
P |
Date |
2001-05-01 |
|
|
Cont ID |
|
Sent By |
lmartine |
Date |
2001-05-01 |
Time |
14:36 |
Rev Time |
0.00 |
Received By |
lmartine |
Date |
|
Time |
|
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
3 |
Status |
F |
Date |
2001-02-27 |
|
|
Cont ID |
|
Sent By |
lsmith |
Date |
2001-02-27 |
Time |
08:05 |
Rev Time |
1.00 |
Received By |
lsmith |
Date |
|
Time |
|
Sent To |
|
|
Notes |
2001-02-27 00:00:00 | FAILED: NEED ADDITIONAL INFORMATION | | | | 1. HOW MANY STORIES IN BUILDING? | | 2. TYPE OF CONSTRUCTION; CEILING RATING? | | 3. ENERGY CALCS. MISSING 4TH FLOOR | | 4. DOORS @ CONFERENCE ROOM & NEW BATH DO | | NOT MEET FAC CODE. | | 5. VALUE OF IMPROVEMENTS ADJUSTED TO | | $30,000. | | 5. NEED FIRE SPRINKLER DRAWINGS |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
F |
Date |
2001-01-30 |
|
|
Cont ID |
|
Sent By |
hpiskura |
Date |
2001-01-30 |
Time |
10:19 |
Rev Time |
0.00 |
Received By |
hpiskura |
Date |
|
Time |
|
Sent To |
|
|
Notes |
2001-01-30 00:00:00 | THE SCOPE OF WORK SHOWN ON THE REVISIONS | | IS REQUIRED TO BE DRAWN BY AN | | ARCHITECT.INCLUDE DIMENSIONS AND | | DETAILS IN ACCORDANCE WITH GOOD | | ARCHITECTURAL PRACTICE.SHOW OR | | PROVIDE NEW RATED DOOR S FOR THE STAIR | | ENCLOSURE, FIRE RATED TENANT SEPARATION | | WHERE APPLICABLE AND PROVISIONS FOR | | HANDICAP ACCESSIBILITY. | | | | SHOW THE METHOD OF FIRE RATED | | PENETRATION PROTECTION FOR THE | | MECHANICAL SERVICES. | | | | SHOW THE FIRE SPRINKLER LAYOUT FOR THE | | CHANGED FLOOR PLAN. | | THE ORIGINAL PERMIT VALUATION OF | | $6000.00 IS FAR TOO LOW FOR THIS WORK. | | THE VALUE EXCEEDS $25,000.00.PLEASE | | PAY ADDITIONAL OR NEW PERMIT FEES AS | | NECESSARY. |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
P |
Date |
2000-11-20 |
|
|
Cont ID |
|
Sent By |
drunnels |
Date |
2000-11-20 |
Time |
10:47 |
Rev Time |
1.00 |
Received By |
drunnels |
Date |
2000-11-20 |
Time |
10:47 |
Sent To |
|
|
Notes |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
5 |
Status |
P |
Date |
2001-04-26 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2001-04-26 |
Time |
20:26 |
Rev Time |
0.00 |
Received By |
dpalmer |
Date |
2001-04-26 |
Time |
20:26 |
Sent To |
|
|
Notes |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
4 |
Status |
F |
Date |
2001-04-05 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2001-04-05 |
Time |
20:07 |
Rev Time |
0.00 |
Received By |
dpalmer |
Date |
2001-04-05 |
Time |
20:07 |
Sent To |
|
|
Notes |
2001-04-05 00:00:00 | **************** UNSAT***************** | | | | 1)NOTE: PLEASE PROVIDE BRANCH CIRCUIT | | #`S ON PLANS THAT CORRELATE WITH PANEL | | SCHEDULES. | | | | 2)NOTE:PLEASE REMOVE HALL SWITCHING,AS | | HALL/STAIRWAY IS NOW ON SEPARATE PLANS. | | | | 3)NOTE: PLEASE NOTE THAT LOADS SHOWN FOR | | TWO PANELS EXCEED OVERCURRENT PROTECTION | | OF DISCONNECT. | | | | 4)NOTE: PLEASE NOTE THAT MEANS OF EGRESS | | LIGHTING COMING INTO TENANT#2 IS SHOWN G | | OING TO CEILING J-BOX. PLEASE NOTE THAT | | SOME SORT OF MIN LIGHTING FIXTURES ARE | | REQ`D. 210-70 | | | | | | PLEASE SUBMIT THE ABOVE INFORMATION FOR | | REVIEW. PLEASE GET WITH ON ANY QUESTIONS | | OR CLARIFICATION THAT IS NEEDED. | | | | DEWEY PALMER | | ELECTRICAL PLAN REVIEW | | 561-659-8096 EXT 8372 |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
3 |
Status |
F |
Date |
2001-02-22 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2001-02-22 |
Time |
11:22 |
Rev Time |
0.00 |
Received By |
dpalmer |
Date |
2001-02-22 |
Time |
11:21 |
Sent To |
|
|
Notes |
2001-02-22 00:00:00 | SAME NOTES AS PREVIOUS REVIEWS | | LOAD CLACLS | | BRANCH CIRCUITS | | EQUIPMENT GROUNDING CONDUCTOR | | ETC. |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
2 |
Status |
F |
Date |
2001-01-30 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2001-01-30 |
Time |
21:27 |
Rev Time |
0.00 |
Received By |
dpalmer |
Date |
2001-01-30 |
Time |
21:27 |
Sent To |
|
|
Notes |
2001-01-30 00:00:00 | ****************** UNSAT ************** | | | | 1)NOTE: PROVISO FROM FIRST REVIEW STILL | | NOT ADDRESSED. | | ALSO, NEED TO SUBMIT PANEL SCHEDULES | | ANDLOAD CALCULATIONS, SHOWING EXISTING | | PANEL(S) AND SIZES. 215-5 | | | | PLEASE SEE ORIG. NOTES ATTACHED AND | | SUBMIT THE ABOVE INFORMATION FOR | | REVIEW. IF THERE ARE ANY QUESTIONS | | PLEASE CALL. | | | | DEWEY PALMER | | ELECTRICAL PLAN REVIEW | | 561-659-8096 EXT8372 |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
P |
Date |
2000-11-07 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2000-11-07 |
Time |
19:40 |
Rev Time |
0.00 |
Received By |
dpalmer |
Date |
2000-11-07 |
Time |
19:40 |
Sent To |
|
|
Notes |
2001-01-08 00:00:00 | **************** PROVISO ************** | | | | 1)NOTE: PLEASE SUBMIT PANEL SCHEDULE | | WITH BRANCH CIRCUITS SHOWN ON PLANS | | THAT CORRELATE WITH PANEL SCHED. | | | | PLEASE SUBMIT THE ABOVE INFORMATION | | FOR REVIEW BEFORE FINAL ELECTRICAL | | INSPECTION IS CALLED IN. | | IF THERE ARE ANY QUESTIONS PLEASE CALL. | | | | DEWEY PALMER | | ELECTRICAL PLAN REVIEW | | 659-8096 EXT 8372 |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
5 |
Status |
P |
Date |
2001-04-26 |
|
|
Cont ID |
|
Sent By |
mcarsill |
Date |
2001-04-26 |
Time |
09:44 |
Rev Time |
0.00 |
Received By |
mcarsill |
Date |
2001-04-26 |
Time |
09:44 |
Sent To |
|
|
Notes |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
4 |
Status |
P |
Date |
2001-04-11 |
|
|
Cont ID |
|
Sent By |
mcarsill |
Date |
2001-04-11 |
Time |
10:47 |
Rev Time |
0.00 |
Received By |
mcarsill |
Date |
2001-04-11 |
Time |
10:47 |
Sent To |
|
|
Notes |
2001-04-11 00:00:00 | 1) PLEASE PROVIDE DETAILS ON REAR | | FIRE ESCAPE STAIR. WHERE DOES IT | | TERMINATE, HOW IS IT SUPPORTED, | | RISE AND RUN CRITERIA. | | | | CAPTAIN MIKE CARSILLO | | 659-8096,EXT.8497 | | 835-2910 |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
3 |
Status |
F |
Date |
2001-03-02 |
|
|
Cont ID |
|
Sent By |
mcarsill |
Date |
2001-03-02 |
Time |
08:39 |
Rev Time |
0.00 |
Received By |
mcarsill |
Date |
2001-03-02 |
Time |
08:35 |
Sent To |
|
|
Notes |
2001-03-02 00:00:00 | 1) PLEASE PROVIDE INTERIOR FINISH | | CLASSIFICATION INFORMATION FOR WALLS | | AND CEILINGS. | | 2) NO FIRE ALARM EQUIPMENT SHOWN ON THE | | FOURTH FLOOR. | | 3) EMERGENCY LIGHTING REQUIRED IN | | EXISTING STAIR. | | 4) NO FIRE SPRINKLER DRAWINGS INCLUDED | | WITH PLANS. | | | | CAPTAIN MIKE CARSILLO | | 659-8096,EXT.8497 | | 835-2910 |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
2 |
Status |
F |
Date |
2001-02-05 |
|
|
Cont ID |
|
Sent By |
mcarsill |
Date |
2001-02-05 |
Time |
12:07 |
Rev Time |
0.00 |
Received By |
mcarsill |
Date |
2001-02-05 |
Time |
12:06 |
Sent To |
|
|
Notes |
2001-02-05 00:00:00 | 1) NO DOOR SCHEDULE PROVIDED WITH PLANS. | | 2) NO EMERGENCY LIGHTS OR EXIT | | SIGNS SHOWN ON PLANS. | | 3) HOW IS THE STAIR RATED. WHAT IS THE | | RATING FOR THE STAIR SHAFT. | | 4) NO MECHANICAL EQUIPMENT SHOWN ON | | PLANS. | | 5) NO FIRE SPRINKLER SYSTEM INFORMATION | | PROVIDED WITH PLANS. | | | | CAPTAIN MIKE CARSILLO | | 659-8096,EXT.8497 | | 835-2910 |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
1 |
Status |
P |
Date |
2000-11-01 |
|
|
Cont ID |
|
Sent By |
mcarsill |
Date |
2000-11-01 |
Time |
11:45 |
Rev Time |
0.00 |
Received By |
mcarsill |
Date |
2000-11-01 |
Time |
11:45 |
Sent To |
|
|
Notes |
2001-01-08 00:00:00 | ON 11-1-00, THIS WRITER CONTACTED MR. | | NORDINE BY TELEPHONE. ACCORDING TO MR. | | NORDINE, THE PERMITTED WORK IS FOR | | THE 4TH FLOOR ONLY. MR. NORDINE | | EXPLAINED THAT 1/2" SHEETROCK IS | | TO BE INSTALLED ON THE METAL STUDS. | | HE FURTHER ADVISED THAT THE BUILDING | | HAS FIRE SPRINKLER PROTECTION. |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
5 |
Status |
P |
Date |
2001-04-27 |
|
|
Cont ID |
|
Sent By |
pkrauss |
Date |
2001-04-27 |
Time |
09:30 |
Rev Time |
0.30 |
Received By |
pkrauss |
Date |
2001-04-27 |
Time |
09:29 |
Sent To |
|
|
Notes |
2001-04-27 00:00:00 | NOTE ON PLAN - FAN SHUTDOWN WITH | | NOTIFICATION TO ALARM/STROBE IN | | NORMALLY OCCUPIED AREAS. |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
4 |
Status |
P |
Date |
2001-03-26 |
|
|
Cont ID |
|
Sent By |
pkrauss |
Date |
2001-03-26 |
Time |
14:46 |
Rev Time |
0.35 |
Received By |
pkrauss |
Date |
2001-03-23 |
Time |
08:13 |
Sent To |
|
|
Notes |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
3 |
Status |
F |
Date |
2001-03-21 |
|
|
Cont ID |
|
Sent By |
pkrauss |
Date |
2001-03-21 |
Time |
12:17 |
Rev Time |
0.45 |
Received By |
pkrauss |
Date |
2001-03-21 |
Time |
12:17 |
Sent To |
|
|
Notes |
2001-03-21 00:00:00 | NOTES ON PERMIT 01020715. |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
2 |
Status |
F |
Date |
2001-02-27 |
|
|
Cont ID |
|
Sent By |
pkrauss |
Date |
2001-02-27 |
Time |
15:56 |
Rev Time |
0.40 |
Received By |
pkrauss |
Date |
2001-02-27 |
Time |
16:13 |
Sent To |
|
|
Notes |
2001-02-27 00:00:00 | NOTES: | | | | 1.NO AIR BALANCE OR OUTSIDE AIR CALCS. | | ASHRAE 62-89. | | | | 2.NO DUCT SMOKE DETECTORS INDICATED. | | 97 SMC 609.1 & 406.4 & NFPA 90A | | 4-4.4.3 | | | | 3.DO WINDOWS IN BATHROOMS WORK?NO | | EXHAUST FANS INDICATED IN BATHROOMS. | | 97 SMC 503.3. |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
1 |
Status |
N |
Date |
2000-11-17 |
|
|
Cont ID |
|
Sent By |
ndenmark |
Date |
2000-11-17 |
Time |
07:24 |
Rev Time |
0.25 |
Received By |
ndenmark |
Date |
2000-11-17 |
Time |
07:24 |
Sent To |
|
|
Notes |
2001-01-08 00:00:00 | NO MECHANICAL INFORMATION PROVIDED FOR | | REVIEW. PROVIDE PLANS FOR MECH WORK AT | | TIME OF MECH PERMIT APPLICATION PRIOR TO | | ANY MECH WORK BEING STARTED. |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
5 |
Status |
P |
Date |
2001-05-01 |
|
|
Cont ID |
|
Sent By |
kstevens |
Date |
2001-05-01 |
Time |
14:27 |
Rev Time |
0.25 |
Received By |
kstevens |
Date |
2001-05-01 |
Time |
14:27 |
Sent To |
|
|
Notes |
2001-05-01 00:00:00 | SHOWER DELETED - SINK DELETED BY | | L. MARTINEZ-KSTEVENS |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
4 |
Status |
F |
Date |
2001-04-30 |
|
|
Cont ID |
|
Sent By |
kstevens |
Date |
2001-04-30 |
Time |
10:28 |
Rev Time |
1.25 |
Received By |
kstevens |
Date |
2001-04-30 |
Time |
10:58 |
Sent To |
|
|
Notes |
2001-04-30 00:00:00 | REVIEW NOTES: DENIED; | | | | (1) BATHROOM ADDITION SHALL MEET 97 | | FACBC REQUIREMENTS. 5' TURNING RADIUS, | | AND SHOWER. | | | | (2) KITCHEN SINK SHALL MEET FACBC SEC. | | 4.24.2 THRU 4.24.7. | | | | REVIEW BY KEN STEVENS (561) 659-8096 | | EXT. 8377 |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
3 |
Status |
F |
Date |
2001-04-11 |
|
|
Cont ID |
|
Sent By |
jleech |
Date |
2001-04-11 |
Time |
08:38 |
Rev Time |
0.75 |
Received By |
jleech |
Date |
2001-04-11 |
Time |
08:38 |
Sent To |
|
|
Notes |
2001-04-11 00:00:00 | DENIED; | | | | 1.BATHROOM ADDITION SHALL MEET 97 FACBC | | REQUIREMENTS. DOOR SWING, 5' TURNING | | RADIUS,AND SHOWER. | | | | 2.KITCHEN SINK SHALL MEET FACBC SEC. | | 4.24.2 THRU 4.24.7. | | | | 3.SANITARY RISER NOT TO CODE. WATER | | CLOSET UNVENTED. | | | | PLUMBING PLAN REVIEW BY; | | JOHN LEECH | | 659-8096 EXT.8377 |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
2 |
Status |
P |
Date |
2001-03-04 |
|
|
Cont ID |
|
Sent By |
pschmitz |
Date |
2001-03-04 |
Time |
14:30 |
Rev Time |
1.00 |
Received By |
pschmitz |
Date |
|
Time |
|
Sent To |
|
|
Notes |
2001-03-04 00:00:00 | PLUMBING PLAN REVIEW # 401 PASS. PES |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
N |
Date |
2001-02-01 |
|
|
Cont ID |
|
Sent By |
jleech |
Date |
2001-02-01 |
Time |
14:49 |
Rev Time |
0.75 |
Received By |
pschmitz |
Date |
2001-02-01 |
Time |
14:49 |
Sent To |
|
|
Notes |
2001-02-01 00:00:00 | NO PLUMBING PLAN REVIEW; | | | | 1.NOT ENOUGH INFORMATION TO DO A | | PLUMBING PLAN REVIEW. | | | | 2.PLANS TO BE SUBMITED WITH PLUMBING | | APPLICATION. | | | | ANY QUESTIONS CALL | | JOHN LEECH | | 659-8096 EXT. 8377 |
|
|