Plan Review Stops For Permit 00061476 |
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
3 |
Status |
P |
Date |
2000-10-24 |
|
|
Cont ID |
|
Sent By |
drunnels |
Date |
2000-10-24 |
Time |
12:34 |
Rev Time |
1.00 |
Received By |
drunnels |
Date |
2000-10-24 |
Time |
12:34 |
Sent To |
|
|
Notes |
2001-01-08 00:00:00 | REVISIONS OK |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
2 |
Status |
P |
Date |
2000-09-12 |
|
|
Cont ID |
|
Sent By |
lmartine |
Date |
2000-09-12 |
Time |
07:04 |
Rev Time |
0.00 |
Received By |
lmartine |
Date |
|
Time |
|
Sent To |
|
|
Notes |
|
|
Review Stop |
B |
BUILDING (STRUCTURAL) |
Rev No |
1 |
Status |
F |
Date |
2000-07-31 |
|
|
Cont ID |
|
Sent By |
lmartine |
Date |
2000-07-31 |
Time |
14:58 |
Rev Time |
0.00 |
Received By |
lmartine |
Date |
|
Time |
|
Sent To |
|
|
Notes |
2001-01-08 00:00:00 | BUILDING REVIEW COMMENTS | | -------------------------- | | | | 1]SUBMIT SOIL ANALYSIS REPORT SIGNED AND | | SEALED. | | 2]SUBMIT CORRECTED ENERGY EFFICIENCY | | REPORT [CHECK SQ.FT.]. | | 3]ROOF SHALL BE DESIGNED FOR A MINIMUM | | 1/4 INCH/FT. | | 4]PROVIDE SECOND COPY OF SIGNED AND | | SEALED SURVEY. | | 5]CONTACT ASS.BUILD.OFFICIAL,DON NEELY | | FOR APPROVAL OF RESIDENT INSPECTOR AT | | 561-659-8096#8333. | | 6]ELEVATION CERTIFICATE WILL BE REQUIRED | | MINIMUM F.F.SHALL BE 15.5FT. | | 7]PROVIDE CONSTRUCTION DETAILS FOR | | SCREEN/RETAINING WALLS. | | | | REVIEWED BY: | | LUIS MARTINEZ | | 561-659-8096#8456 |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
4 |
Status |
P |
Date |
2001-01-11 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2001-01-11 |
Time |
17:12 |
Rev Time |
0.00 |
Received By |
dpalmer |
Date |
2001-01-11 |
Time |
17:12 |
Sent To |
|
|
Notes |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
3 |
Status |
F |
Date |
2000-12-07 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2000-12-07 |
Time |
21:49 |
Rev Time |
0.00 |
Received By |
dpalmer |
Date |
2000-12-07 |
Time |
21:49 |
Sent To |
|
|
Notes |
2001-01-08 00:00:00 | ************** UNSAT ****************** | | | | | | 1)NOTE: SAME E SHEET WAS SUBMITTED AND | | THE PROVISO FROM TWO PREVIOUS REVIEWS | | WERE NOT ADDRESSED!!!! | | | | ONLY SHEETS BEING REVISED ARE TO BE | | SUBMITTED!!! ALL SHEETS SUBMITTED ON | | THE NEXT SET WILL BE CHARGED THE PER | | PAGE PRICE UPON REVIEW. THIS WILL SAVE | | BOTH YOU AND US TIME AND MONEY. | | | | PLEASE SUBMIT THE INFORMATION FROM | | FIRST SET OF NOTES. IF THERE ARE ANY | | QUESTIONS PLEASE CALL. | | | | DEWEY PALMER | | ELECTRICAL PLAN REVIEW. | | 561-659-8096 ETX 8372 |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
2 |
Status |
P |
Date |
2000-10-11 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2000-10-11 |
Time |
21:29 |
Rev Time |
0.00 |
Received By |
dpalmer |
Date |
2000-10-11 |
Time |
21:29 |
Sent To |
|
|
Notes |
2001-01-08 00:00:00 | REV FOR SHEET E2.1 ONLY . | | PROVISO NOT ADDRESSED. |
|
|
Review Stop |
E |
ELECTRICAL |
Rev No |
1 |
Status |
P |
Date |
2000-07-27 |
|
|
Cont ID |
|
Sent By |
dpalmer |
Date |
2000-07-27 |
Time |
20:34 |
Rev Time |
0.00 |
Received By |
dpalmer |
Date |
2000-07-27 |
Time |
20:34 |
Sent To |
|
|
Notes |
2001-01-08 00:00:00 | ************** PROVISO **************** | | | | 1)NOTE: PLEASE SUBMIT REVISED LOAD | | CALCULATIONS TO REFLECT ALL CONTINUOUS | | LOADS AT 125%.(LIGHTING ETC.) PER 220 | | | | PLEASE SUBMIT THE ABOVE INFORMATION FOR | | REVIEW BEFORE FINAL ELECTRICAL INSPECT- | | -ION IS CALLLED IN. IF THERE ARE ANY | | QUESTIONS PLEASE CALL. | | | | DEWEY PALMER | | ELECTRICAL PLAN REVIEW' | | CITY OF WEST PALM BEACH | | 659-8096 EXT 8372 |
|
|
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
2 |
Status |
P |
Date |
2000-09-08 |
|
|
Cont ID |
|
Sent By |
mgonzale |
Date |
2000-09-08 |
Time |
09:16 |
Rev Time |
1.00 |
Received By |
mgonzale |
Date |
|
Time |
|
Sent To |
|
|
Notes |
2001-01-08 00:00:00 | PASSED WITH PROVISOS | | | | 1. WHEN INSTALLING METERS MUST BE INSTAL | | LED JUST OUTSIDE OF PROPERTY IN THE ROW | | | | 2. PLEASE PROVIDE SITE PERSRVIOUS AND IM | | PERVIOUS CALCULATIONS. PLEASE LIST AMOUN | | TS IN SQ. FT. AND IN ACRES. THE TOTAL | | SHOULD AMOUNT TO TOTAL SITE ACREAGE. | | PLEASE FAX ATTENTION MANNY 561-653-2648 | | 3. ANY WORK PERFORMED IN THE R.O.W. WILL | | REQUIRE A R.O.W. PERMIT FROM RICHARD | | D. PITTMAN, CITY ENGINEER. | | 1000 45TH ST. WPB FL 33407 | | (561) 659-8040 | | | | 4. A VALVE MUST BE ADDED NEXT TO FIRE | | HYDRANTS THAT ARE BEING RELOCATED | | BECAUSE OF A DRIVEWAY ENTRANCE. 2 TOTAL | | | | 5. A COMMENT WAS MADE ON BEHALF OF | | PUBLIC UTILITIES TO USE CITY OF WPB | | STANDARD UTILITY DETAILS FOR ANY WORK | | PERFORMED AND BEING APPROVED BY THE | | CITY OF WEST PALM BEACH PUBLIC | | UTILITIES ENGINEERING DEPARTMENT. | | | | 6. ALSO A MINIMUM OF TWO SETS OF PLANS | | MUST BE DELIVERED TO MANNY GONZALEZ | | 1000 45TH STREET SUITE 15, WPB FL 33407 | | (561) 659 8040. ONE FOR THE UTILITY FILE | | AND ONE FOR THE UTILITY INSPECTOR. | | 2 SETS OF SHOP DRAWINGS MUST BE SUBMITTE | | D FOR APPROVAL BEFORE JOB COMMENCEMENT. | | | | 7. SUNSHINE LOCATION SERVICE 1-800 SHOUL | | D BE NOTED ON ALL UTILITY PLANS. |
|
|
Review Stop |
ENG |
ENGINEERING CSD |
Rev No |
1 |
Status |
P |
Date |
2000-08-14 |
|
|
Cont ID |
|
Sent By |
mgonzale |
Date |
2000-08-14 |
Time |
09:18 |
Rev Time |
0.50 |
Received By |
mgonzale |
Date |
|
Time |
|
Sent To |
|
|
Notes |
2001-01-08 00:00:00 | PASSED | | POLLUTION PREVENTION PLAN SUBMITTED |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
2 |
Status |
P |
Date |
2000-08-30 |
|
|
Cont ID |
|
Sent By |
rturnque |
Date |
2000-08-30 |
Time |
10:31 |
Rev Time |
0.30 |
Received By |
rturnque |
Date |
|
Time |
|
Sent To |
|
|
Notes |
|
|
Review Stop |
FIRE |
FIRE DEPARTMENT |
Rev No |
1 |
Status |
F |
Date |
2000-07-20 |
|
|
Cont ID |
|
Sent By |
rturnque |
Date |
2000-07-20 |
Time |
09:39 |
Rev Time |
0.45 |
Received By |
mcarsill |
Date |
|
Time |
|
Sent To |
|
|
Notes |
2001-01-08 00:00:00 | FIRE ALARM SYSTEM SHALL BE CLASS "A" OR | | ADDRESSABLE. | | PROVIDE FIRE SPRINKLER DRAWINGS. | | FIRE HYDRANTS SHALL BE LOCATED WITHIN | | 150 FEET OF FIRE DEPARTMENT CONNECTION. |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
3 |
Status |
N |
Date |
|
|
|
Cont ID |
|
Sent By |
ndenmark |
Date |
2000-12-04 |
Time |
15:43 |
Rev Time |
0.33 |
Received By |
ndenmark |
Date |
2000-12-04 |
Time |
15:43 |
Sent To |
|
|
Notes |
2001-01-08 00:00:00 | NOM2.1DRAWING INCLUDED TO REVIEW | | WITH THIS REVISION SET |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
2 |
Status |
P |
Date |
2000-08-10 |
|
|
Cont ID |
|
Sent By |
cthirben |
Date |
2000-08-10 |
Time |
09:51 |
Rev Time |
1.00 |
Received By |
cthirben |
Date |
2000-08-10 |
Time |
09:50 |
Sent To |
|
|
Notes |
|
|
Review Stop |
M |
MECHANICAL (A/C) |
Rev No |
1 |
Status |
A |
Date |
2000-07-25 |
|
|
Cont ID |
|
Sent By |
ndenmark |
Date |
2000-07-25 |
Time |
11:44 |
Rev Time |
0.50 |
Received By |
ndenmark |
Date |
2000-07-25 |
Time |
11:43 |
Sent To |
|
|
Notes |
2001-01-08 00:00:00 | ACCEPTED AS SHELL | | ONLY W/ ONE PTAC AND CURBS FOR FUTURE | | RTU'S |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
3 |
Status |
F |
Date |
2000-11-17 |
|
|
Cont ID |
|
Sent By |
jleech |
Date |
2000-11-17 |
Time |
10:28 |
Rev Time |
1.00 |
Received By |
jleech |
Date |
2000-11-17 |
Time |
10:28 |
Sent To |
|
|
Notes |
2001-01-08 00:00:00 | PLUMBING SHTS P2.1 AND P5.1 ARE NOT PART | | OF SHELL CONTRACT. SUBMIT PLUMBING | | DRAWINGS WITH TENANT BUILDING PLAN. |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
2 |
Status |
F |
Date |
2000-10-15 |
|
|
Cont ID |
|
Sent By |
pschmitz |
Date |
2000-10-15 |
Time |
15:03 |
Rev Time |
2.00 |
Received By |
pschmitz |
Date |
|
Time |
|
Sent To |
|
|
Notes |
2001-01-08 00:00:00 | PLUMBING PLAN REVIEW RESUBMIT DENIED | | (1)PLANS SUBMITTED ARE FOR BLDG A ONLY. | | (2)PLEASE ADDRESS PREVIOUS COMMENTS | | DATED 07-26-00 BY T. LARGE. | | (3) SECONDARY DRAINAGE SPC 94 SEC 904 | | (A)ROOF AREA FOR EA SCUPPER DRAIN | | (B) AREA FOR 1/2 THE VERTICAL WALLS. | | (C)DETAIL OF EA SCUPPER DRAIN. | | (D)CALCULATIONS BASED ON 8.4" RAIN FALL | | (E) SEE APPENDIX A SPC 94 PG 195,197. | | END OF COMMENTS PAUL SCHMITZ |
|
|
Review Stop |
P |
PLUMBING |
Rev No |
1 |
Status |
P |
Date |
2000-07-26 |
|
|
Cont ID |
|
Sent By |
tlarge |
Date |
2000-07-26 |
Time |
18:30 |
Rev Time |
1.25 |
Received By |
pschmitz |
Date |
2000-07-26 |
Time |
18:28 |
Sent To |
|
|
Notes |
2001-01-08 00:00:00 | **************PROVISO******************* | | 1)BACKFLOW PREVENTERS LOCATED IN VAULTS | | SHALL COMPLY W/SPC SEC.606.4.1.-606.4.3 | | | | 2)OVERFLOW DRAINAGE FOR THE ROOF SHALL | | BE DESIGNED ON 1994 EDITION OF THE SPC | | SEC.1109 & APPENDIX "A". | | | | 3)STORM WATER SYSTEM SHALL BE SHOWN ON | | THE CIVIL DRAWINGS AND SIZED PER TABLES | | 1108.1 & 1108.2 OF THE SPC. | | | | ******NOTE:REVISED DRAWINGS SHALL BE | | SUBMITTED PRIOR TO ISSUANCE OF PLUMBING | | PERMIT. |
|
|
Review Stop |
Z |
ZONING |
Rev No |
1 |
Status |
P |
Date |
2000-08-04 |
|
|
Cont ID |
|
Sent By |
gjoyce |
Date |
2000-08-04 |
Time |
14:08 |
Rev Time |
0.25 |
Received By |
gjoyce |
Date |
|
Time |
|
Sent To |
|
|
Notes |
|
|