Plan Review Details - Permit 00060322
Plan Review Stops For Permit 00060322
Review Stop E ELECTRICAL
Rev No 1 Status P Date 2000-06-12 Cont ID  
Sent By dpalmer Date 2000-06-12 Time 21:07 Rev Time 0.00
Received By dpalmer Date 2000-06-12 Time 21:07 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2000-11-02 Cont ID  
Sent By jleech Date 2000-11-02 Time 19:02 Rev Time 0.33
Received By jleech Date 2000-11-02 Time 19:02 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2000-06-12 Cont ID  
Sent By cthirben Date 2000-06-12 Time 14:37 Rev Time 0.00
Received By cthirben Date 2000-06-12 Time 14:39 Sent To  
Notes
2001-01-08 00:00:00PROVISO*********************************
 PROVIDE AN ENERGY CALCULATION PACKAGE
 INCLUDING THE MANUAL "J" OF PLANS SUBMIT

Review Stop P PLUMBING
Rev No 1 Status P Date 2000-06-10 Cont ID  
Sent By tlarge Date 2000-06-10 Time 05:42 Rev Time 0.33
Received By tlarge Date 2000-06-10 Time 05:42 Sent To  
Notes
2001-01-08 00:00:00SUBMIT SANITARY RISERS THAT CORRELATE
 W/FLOOR PLANS PRIOR TO PLUMBING
 INSPECTION.COUNTYWIDE AMENDMENTS TO SPC
 SEC.104.2.1.

Review Stop R ROOF PLAN REVIEW
Rev No 5 Status F Date 2000-10-04 Cont ID  
Sent By jgomez Date 2000-10-04 Time 13:57 Rev Time 0.50
Received By jgomez Date 2000-10-04 Time 13:57 Sent To  
Notes
2001-01-08 00:00:00TRUSS DRAWINGS CHECKLIST:
 1-REVISE MEAN ROOF HEIGHT.SEE ARCHITECTS
 DRAWINGS FOR CORRECT MEAN ROOF HEIGHT.
 2-ARCHITECT TO REVISE ANCHOR SCHEDULE ON
 SHEET #8. SEE THE SEMCO CATALOGUE FOR
 THE ACTUAL VALUE THAT IS ENGINEERED
 FOR THE CONNECTORS SPECIFIED.
 3-ARCHITECT TO SPECIFY ALL CONNECTORS.
 SEE ENGINEERED TRUSS DRAWINGS AND
 TRUSS LAYOUT FOR COMMENTS.
 NOTE: MAKE SURE TO SPECIFY WOOD TO
 WOOD OR CONCRETE TO WOOD CONNECTORS
 AS REQUIRED ACCORDING TO THE ACTUAL
 CONDITIONS.
  
 NOTES:
 -PLEASE RETURN REVIEWED SET AFTER
 CORRECTIONS ARE DONE IN ORDER TO
 EXPEDITE THE REVIEW PROCESS.
 -IF YOU HAVE ANY QUESTIONS, PLEASE
 CONTACT JULIO GOMEZ AT 659-8096 EXT.
 8232.

Review Stop R ROOF PLAN REVIEW
Rev No 4 Status F Date 2000-10-04 Cont ID  
Sent By jgomez Date 2000-10-04 Time 11:06 Rev Time 0.50
Received By jgomez Date 2000-10-04 Time 11:06 Sent To  
Notes
2001-01-08 00:00:00TRUSS DRAWINGS CHECKLIST:
 1-

Review Stop R ROOF PLAN REVIEW
Rev No 3 Status P Date 2000-08-01 Cont ID  
Sent By jgomez Date 2000-08-01 Time 09:09 Rev Time 3.00
Received By jgomez Date 2000-08-01 Time 09:09 Sent To  
Notes
2001-01-08 00:00:00APPROVED WITH PROVISO:
 1-FLOOD ZONE "AO". PROVIDE ELEVATION
 CERTIFICATE.
 2-PROVIDE CURRENT PRODUCT APPROVAL FOR
 SLIDING GLASS DOORS. OR PROVIDE A
 COMPLETE SITE SPECIFIC ENGINEERING
 ANALYSIS WITH ALL CALCULATIONS, COPIES
 OF STRUCTURAL TESTS PERFORMED AS PER
 ASTM E-330, COMPLETE INSTALLATION
 DETAILS INCLUDING FASTENING TO THE
 STRUCTURE. AND INCLUDE SITE SPECIFIC
 FORM (ATTACHED) SIGNED, SEALED AND
 DATED BY THE MANUFACTURER'S ENGINEER
 AND THE ARCHITECT OF RECORD.
 3-TWO HOUR CONCRETE BLOCK: PROVIDE
 CERTIFICATION FROM MANUFACTURER
 ENGINEER STATING THAT CONCRETE BLOCK
 EQUIVALENT THICKNESS COMPLIES WITH
 ASTM C140 FOR FIRE RESISTANCE.
 SECTION 709.3 SBC 1997.
 4-PROVIDE PRODUCT APPROVAL FOR WINDOW
 MULLIONS.
 5-COMPLETELY SPECIFY CEILING CONSTRUCT'N
 AT ENTRY AND REAR PORCHES.
 INCLUDE ALL FASTENERS TYPES AND SPAC'G
 SECTION 2504 SBC 1997.
 6-REVISE ROOF TRUSS ANCHOR SCHEDULE AS
 REQUIRED. NEED TO SPECIFY WOOD TO WOOD
 CONNECTORS AT PORCHES' ROOF TRUSSES
 ANCHORED TO WOOD BEAMS.
 7-SEE COMMENTS BY OTHER TRADES. SEE LAST
 TWO PAGES OF THE BLUE PRINTS.

Review Stop R ROOF PLAN REVIEW
Rev No 2 Status F Date 2000-07-21 Cont ID  
Sent By jgomez Date 2000-07-21 Time 15:16 Rev Time 3.00
Received By jgomez Date 2000-07-21 Time 15:16 Sent To  
Notes
2001-01-08 00:00:00SECOND CHECKLIST:
 1-IMPACT FEES WERE NOT PAID.
 2-PROVIDE CURRENT PRODUCT APPROVAL FOR
 SLIDING GLASS DOORS. OR PROVIDE A
 COMPLETE SITE SPECIFIC ENGINEERING
 ANALYSIS WITH ALL CALCULATIONS, COPIES
 OF STRUCTURAL TESTS PERFORMED AS PER
 ASTM E-330, COMPLETE INSTALLATION
 DETAILS INCLUDING FASTENING TO THE
 STRUCTURE. AND INCLUDE SITE SPECIFIC
 FORM (ATTACHED) SIGNED, SEALED AND
 DATED BY THE MANUFACTURER ENGINEER AND
 THE ARCHITECT OF RECORD.
 3-PRODUCT APPROVAL FOR SKYLIGHT IS
 INCOMPLETE. MISSING COPIES OF THE
 APPROVED DRAWINGS.
 4-TWO HOUR CONCRETE BLOCK: PROVIDE
 CERTIFICATION FROM MANUFACTURER
 ENGINEER STATING THAT CONCRETE BLOCK
 EQUIVALENT THICKNESS COMPLIES WITH
 ASTM C140 FOR FIRE RESISTANCE.
 SECTION 709.3 SBC 1997.
 5-PROVIDE PRODUCT APPROVAL FOR WINDOW
 MULLIONS.
 6-COMPLETELY SPECIFY CEILING CONSTRUCT'N
 AT ENTRY AND REAR PORCHES. INCLUDE ALL
 FASTENERS TYPES AND SPACING. SECTION
 2504 SBC 1997.
 7-REVISE ROOF TRUSS ANCHOR SCHEDULE AS
 REQUIRED. NEED TO SPECIFY WOOD TO WOOD
 CONNECTORS AT PORCHES' ROOF TRUSSES
 ANCHORED TO WOOD BEAMS.
 8-OWNER/AGENT TO SIGN AND DATE THE
 ENERGY CALCULATIONS.
 9-PROVIDE A CURRENT PRODUCT APPROVAL
 FOR STORM PANELS.

Review Stop R ROOF PLAN REVIEW
Rev No 1 Status F Date 2000-06-23 Cont ID  
Sent By jgomez Date 2000-06-23 Time 16:53 Rev Time 3.50
Received By jgomez Date 2000-06-23 Time 16:53 Sent To  
Notes
2001-01-08 00:00:00CHECKLIST:
 1-PROVIDE ENERGY CALCULATIONS.
 2-PAY IMPACT FEES TO PALM BEACH COUNTY.
 3-NEED A PERMIT APPLICATION FOR EACH
 TOWNHOUSE.
 4-PROVIDE SAFETY GLASS WHERE REQUIRED.
 SEE PLANS FOR COMMENTS. SEC 2405.2 SBC
 5-PROVIDE PRODUCT APPROVALS FOR: TWO HR
 FIRE RATED CONCRETE BLOCK, SKYLIGHT,
 WINDOW MULLIONS, SLIDING GLASS DOORS,
 ARCHED WINDOWS AND SINGLE HUNG WINDOWS
 WITH MUNTINS. (SEE COMMENTS ON FACE OF
 PRODUCT APPROVALS SUBMITTED).
 6-ARCHITECT NEEDS TO DATE DRAWINGS WHEN
 SIGNING AND SEALING DRAWINGS AND
 DOCUMENTS FOR PUBLIC RECORDS. CHAPTER
 481.221(A0.
 7-PROVIDE COMPLETE FRAMING DETAILS FOR
 SKYLIGHT INSTALLATION. SECTION 104.2.2
 CITY AMENDMENTS TO SBC 1997.
 8-COMPLETELY SPECIFY CEILING CONSTRUCT'N
 AT ENTRY AND REAR PORCHES. INCLUDE
 FASTENER TYPE AND SPACING. SECTION
 2504 SBC 1997.
 9-FLOOR PLAN DOESN'T MATCH ELEVATIONS.
 SEE REAR ELEVATION. ALSO,UPDATE/REVISE
 DRAWINGS AS REQUIRED. SEE COMMENTS ON
 PLANS.
 10-REVISE BEAM SCHEDULE. SIZES DON'T
 MATCH FLOOR PLANS.
 11-REVISE ROOF TRUSS ANCHOR SCHEDULE AS
 REQUIRED. NEED TO SPECIFY WOOD TO WOOD
 CONNECTOR AT PORCHES' BEAMS.
 SECTION 104.2.2 CITY AMENDMENTS.
 12-PROVIDE PROFILE OF TWO HOUR DEMISING
 WALL SHOWING LOCATION OF BEAMS AND
 VERTICAL REINFORCEMENT. SECTION
 104.2.2 CITY AMENDMENTS.
 13-CLEARLY KEY ON PLANS ALL THE DETAILS
 THAT APPLY TO THIS HOUSE AND DELETE OR
 CROSS OUT THE ONES THAT DON'T.
  
  
 NOTE:
 PLEASE RETURN REVIEWED SET IN ORDER TO
 EXPEDITE THE REVIEW PROCESS.

Review Stop Z ZONING
Rev No 1 Status P Date 2000-06-09 Cont ID  
Sent By gjoyce Date 2000-06-09 Time 14:51 Rev Time 0.25
Received By gjoyce Date   Time   Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved