Plan Review Details - Permit 00040269
Plan Review Stops For Permit 00040269
Review Stop E ELECTRICAL
Rev No 1 Status P Date 2000-05-03 Cont ID  
Sent By dpalmer Date 2000-05-03 Time 05:54 Rev Time 0.00
Received By dpalmer Date 2000-05-03 Time 05:54 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2000-04-21 Cont ID  
Sent By cthirben Date 2000-04-21 Time 14:54 Rev Time 1.00
Received By cthirben Date 2000-04-21 Time 14:53 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2000-04-20 Cont ID  
Sent By tlarge Date 2000-04-20 Time 06:21 Rev Time 0.33
Received By tlarge Date 2000-04-20 Time 06:21 Sent To  
Notes
***NONE***

Review Stop R ROOF PLAN REVIEW
Rev No 2 Status F Date 2000-10-02 Cont ID  
Sent By jgomez Date 2000-10-02 Time 17:15 Rev Time 0.50
Received By jgomez Date 2000-10-02 Time 17:15 Sent To  
Notes
2001-01-08 00:00:00TRUSS DRAWINGS CHECKLIST:
  
 1-THERE IS A SLIGHT CHANGE IN THE ROOF
 FRAMING PLAN BY THE MASTER BEDROOM
 SITTING AREA. SPECIFY ANCHORS AS
 REQUIRED FOR NEW ROOF TRUSS LAYOUT.
 2-CONNECTORS SPECIFIED FOR SOME ROOF
 TRUSSES DON'T RESIST THE UPLIFT LOADS
 CALCULATED IN THE ENGINEERED TRUSSES.
 REVISE CONNECTOR SCHEDULE AS REQUIRED.
 SEE TRUSS LAYOUT FOR COMMENTS.
  
  
  
  
  
  
 NOTE:
 -IF YOU HAVE ANY QUESTIONS, PLEASE FEEL
 FREE TO CALL JULIO GOMEZ AT 659-8096
 EXT. 8232.

Review Stop R ROOF PLAN REVIEW
Rev No 1 Status P Date 2000-06-03 Cont ID  
Sent By jgomez Date 2000-06-03 Time 15:45 Rev Time 3.00
Received By jgomez Date 2000-06-03 Time 14:05 Sent To  
Notes
2001-01-08 00:00:00APPROVED WITH PROVISO:
 1-PROVIDE CURRENT PRODUCT APPROVAL FOR
 MASONRY.
 2-MULLION PRODUCT APPROVAL IS TO BE USED
 WITH SERIES 7500 SINGLE HUNG WINDOWS
 MULLED TOGETHER ONLY. PROVIDE MULLION
 PRODUCT APPROVAL FOR HORIZONTAL
 APPLICATIONS.
 -CLEARLY INDICATE MULLION SIZES AND
 FASTENERS TO BE USED IN THIS PROJECT.
 -PROVIDE UPDATED PRODUCT APPROVAL.
 3-PROVIDE PRODUCT APPROVAL FOR SLIDING
 GLASS DOORS WITH TRANSOM ABOVE AS A
 SINGLE ASSEMBLY AS SHOWN ON ARCHITECTS
 DRAWINGS.
 4-PROVIDE STORM PANELS PRODUCT APPROVAL.
 -HIGHLIGHT SPECIFIC MOUNTING CONDITIONS
 AND ANCHOR TYPE AND SPACING TO BE USED
 ACCORDING TO THE DESIGN PRESSURES
 (MEAN ROOF HEIGHT), EDGE DISTANCE,
 PANEL SPAN AND STRUCTURE TO BE
 ANCHORED TO.
 5-UPDATE/REVISE ALL DRAWINGS AS REQUIRED
 SEE COMMENTS ON PLANS.
 6-PROVIDE COMPLETE FRAMING DETAILS AT
 ARCHED OPENINGS. SECTION 104.2.2 OF
 CITY AMENDMENTS.
 7-PROVIDE SOIL TEST REPORT WITH THE
 MINIMUM INFORMATION AS REQUESTED IN
 SECTION 1804.2.7.2 CITY AMENDMENTS.
 8-ATTIC ACCESS TO BE 22"X36" MINIMUM.
 SECTION 2309.6 SBC 1997.REVISE NOTE #7

Review Stop Z ZONING
Rev No 1 Status P Date 2000-04-11 Cont ID  
Sent By gjoyce Date 2000-04-11 Time 10:37 Rev Time 0.25
Received By gjoyce Date   Time   Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved