Plan Review Details - Permit 00020366
Plan Review Stops For Permit 00020366
Review Stop E ELECTRICAL
Rev No 2 Status P Date 2000-03-15 Cont ID  
Sent By dpalmer Date 2000-03-15 Time 12:44 Rev Time 0.00
Received By dpalmer Date 2000-03-15 Time 12:44 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2000-03-08 Cont ID  
Sent By dpalmer Date 2000-03-08 Time 19:32 Rev Time 0.00
Received By dpalmer Date 2000-03-08 Time 19:32 Sent To  
Notes
2001-01-08 00:00:00NOTES WRITTEN ON PLANS
  
 PLEASE CORRECT PANEL SCHEDULES.
 CORRECT WIRE SIZES WITH OVERCURRENT
 PROTECTION.ETC.ETC.

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2000-08-10 Cont ID  
Sent By cthirben Date 2000-08-10 Time 09:43 Rev Time 1.00
Received By cthirben Date 2000-08-10 Time 09:43 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2000-02-12 Cont ID  
Sent By jleech Date 2000-02-12 Time 12:50 Rev Time 0.35
Received By jleech Date 2000-02-12 Time 12:49 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2000-02-11 Cont ID  
Sent By tlarge Date 2000-02-11 Time 07:11 Rev Time 0.33
Received By tlarge Date 2000-02-11 Time 07:11 Sent To  
Notes
***NONE***

Review Stop R ROOF PLAN REVIEW
Rev No 2 Status P Date 2000-04-19 Cont ID  
Sent By rmcdouga Date 2000-04-19 Time 10:49 Rev Time 3.00
Received By rmcdouga Date   Time   Sent To  
Notes
2001-01-08 00:00:00***************PROVISO******************
  
 1)PROVIDE PRODUCT APPROVALS FOR STORM
 PANELS PRIOR TO INSTALLATION

Review Stop R ROOF PLAN REVIEW
Rev No 1 Status F Date 2000-03-21 Cont ID  
Sent By jcaloger Date 2000-03-21 Time 12:29 Rev Time 1.00
Received By jcaloger Date   Time   Sent To  
Notes
2001-01-08 00:00:00THE DESIGN COMPLIANCE FORM STATES
 THAT SBC 97 WAS USED ANDPLAN C1 SAYS
 RATIONAL ANALYSIS WAS USED.CLARIFY
  
 THE DESIGN COMPLIANCE FORM STATES A MEAN
 ROOF HT OF 15 FT.AND I CALCULATE THE
 MEAN HT TO BE 17 FT.
  
 THE ROOF TRUSSES LOADS STATED ON PLAN
 S-2.1 STATES A BASIC WIND PRESSURE OF
 25.5 PSF. AND THE DESIGN COMPLIANCE FORM
 STATES 24.7 PSF.THE PRESSURES ARE FROM
 TWO DIFFERENT SOURCES?CLARIFY
  
 PROVIDE THE CALCULATIONS FOR ATTACHING
 THE ROOF TILES AS PER THE PRODUCT APPROV
 SEE TABLE 2.
  
 THE DESIGN COMPLIANCE FORM AND PLANS
 ARE REQUIRED TO STATE THE EXACT ADDRESS
 OF THE STRUCTURE
  
 NEEDS ENERGY CALCULATIONS FORM 600

Review Stop Z ZONING
Rev No 1 Status P Date 2000-02-10 Cont ID  
Sent By gjoyce Date 2000-02-10 Time 10:08 Rev Time 0.25
Received By gjoyce Date   Time   Sent To  
Notes
***NONE***