Miscellaneous Information / Notes |
4 STORY MULTI PURPOSE BLDG (ASSEMBLY) HAS NOC |
IMPACT FEES PAID ON FOUNDATION PERMIT 99030282 |
CIVIL PERMIT99021222 REVISE9-16-99SG REV 9-24-99SG |
RESUBMIT 7-27-99 REVISION 9-9-99SG |
RESUBMIT 8/13/99 CT |
PLBG.DENIED.TO F.C.8/20/99. |
CKLST 8/23/99 PLBG BLD CONT CALLED HHP |
BUILDING AND PLUMBING REVISION 8/26/99 |
RESUBMIT 8-27-99 WL |
PLBG.APPROVED 9/2/99.(2 SETS ONLY-3RD.SET MISSING |
PLBG.SHEETS.) |
REVISION 9/29/99 |
BUILDING REVISION 11/10/99 |
MECHANICAL REVISION 11/10/99 |
BLDG REVISION 11-17-99 WL |
BUILDING REVISION 12/1/99 |
SHOP DRAWINGS TO DON NEELEY 12-10-99 WL |
REVISION 1-06-2000 |
REVISION 1-18-2000SG |
REVISION 02/03/2000 |
RREVISION 02/22/2000 JW |
REVISION 4/3/00 NFL |
REVISION 4-17-00 AN BUILD |
REVISION 4-17-00 AN ELEC |
REVISION 5/8/00 SJOHNSON |
REVISION 5/8/00 ROOFING SJOHNSON |
REVISION SUBMITTED 5-24-2000 WL |
REVISION 6/9/00 NFL |
REVISION 06/21/2000 JW ROOF PIPE SUPPORT |
REVISION 06/21/2000 JW PRODUC APP CURTAIN WALLS |
REVISION 7/12/00 SJOHNSON |
SUBMITTAL PROD APPR. 7/12/00 SJOHNSON |
SUBMITTAL ENG. LTR 7/12/00 SJOHNSON |
REVISION 7-28-00SG |
REVISION 8-3-2000 WL |
REVISION ELEC/MECH 8-24-2000 WL BZ 170585 150.00 |
BLDG REV 8-24-2000 BZ 170586 80.00 |
(PLUMBING SHEET CLEAN-UP & ELEC SUBMITTED NO FEE |
PAID ON THIS SUBMITTAL NEED BILL STAPLES OK NOT |
TO CHARGE FOR THIS) 8-24-2000 WL |
MECH REV SUBMITTED 9-8-2000 WL $70.00 BZ 171151 |
PLUMB REV SUBMITTED 9-8-2000 WL $100.00 BZ 171153 |
REV 9-19-00 SG SHOP DRAWING |
REV 9-19-00SG ELECTRIC 60.00#171606 |
REV 9-19-00SG BLDG 60.00 #171606 |
REV 9-19-00SG BLDG 60.00 #171606 |
REV 9-19-00SG ELEC 60.00#171606 |
REV 9-19-00SG BLDG SHOP DRAWING (2) |
REV 9-27-2000 BLDG 60.00 #172106 WL |
REV MECH/ENGINEERING $100.00 9-27-2000 BZ 172107.. |
...(BRIAN WANTED THIS REVISION SEPARATE FROM THE |
BLDG) SO THAT IT WOULD NOT HOLD UP IT BEING APPROV |
WL |
REV 10-4-00SG 60.00#173013 ELEC |
REV 10-4-00SG 120.OO #17313 MECH |
REV 10-5-00SG ZONING 60.003173096 |
REV 10/18/00 ELEC BZ173726 $70 SJOHNSON |
REVISION 10-20-00 NFL BZ 173947 $70 |
REVISIONS 10/30/2000 JW $70.00 |
12/27/00 LEFT MESSAGE TO PICK-UP REVISION FROM |
10/18/2000.LCN |
12/27/00 MIKE SANFORD PU PLANS YDAVIS |