Miscellaneous Information / Notes |
90-INSTALL 1500FT OF 1-2" CONDUIT FROM ALLEY S/W |
OF BANYAN N TO 3RD ST W TO FLAGLER DR. |
|
CONTRACTOR: ALL LAND & EQUIPMENT, LUIS EGOZCUE, |
786-546-1138 |
SUB: HOT WIRE, 305-219-0286 |
START DATE: 05-07-2020 |
DURATION: 90 DAYS |
END DATE: 08-05-2020 |
DO NOT PARK ON THE SIDEWALK. BAGGING OF PARKING |
METERS IS REQUIRED WHEN BLOCKING PARKING STALLS. |
R/W & S/W RESTORATION PER CURRENT CITY STD. COPY |
OF BORE LOGS & AS-BUILTS REQUIRED. LIGHTED |
BARRICADES REQUIRED IF EQUIPMENT OR DUMPSTER (POD) |
IS LEFT IN ROADWAY OR PARKING STALL AFTER DARK OR |
OVER NIGHT. |
CONTACT JANICE TARBILL 561-494-1079 FOR ALL CITY |
LOCATES. ALL TYPE I BARRICADES TO HAVE BALLASTS |
OVER BOTTOM RAILS. NO WORK ALLOWED BETWEEN |
7:00AM-9:00AM&4:00PM-6:00PM. ALL FOLLOWING |
INSPECTIONS MUST BE CALLED IN (LISTED ON THE BACK |
OF THE PERMIT): B800,801,802,803,804,805 |
PLEASE BE SURE TO FOLLOW THESE SPECIAL CONDITIONS |
(LISTED ON THE BACK OF THE PERMIT): |
A,B,C,D,E,F,G,H,I,J,K,L,102-600,603,613,660 |