Miscellaneous Information / Notes |
30-EXTENSION TO COMPLETE WORK. |
30-EXTENSION TO COMPLETE FIRST FLOOR RESTORATION. |
ALLEY TO BE BLOCKED/LOCAL TRAFFIC ONLY. |
30-EXTENSION FOR ON GOING WORK. ALLEY TO BE |
BLOCKED/LOCAL TRAFIS ONLY. |
30-EXTENSION TO COMPLETE WORK. |
30-RESTORATION OF HISTORIC FASADE & WINDOWS AT 114 |
S OLIVE AVE. TEMP WOOD WALL INSTALLED FOR SAFETY. |
|
CONTRACTOR: DWYER CONSTRUCTION & DEVELOPMENT INC, |
PETER DWYER HEALY, 772-267-6107 |
START DATE: 07-13-2015 |
DURATION: 30 DAYS |
END DATE: 08-12-2015 |
LIGHTED BARRICADES ARE REQUIRED FOR EQUIPMENT LEFT |
IN ROADWAY OR PARKING STALL. |
ALL TYPE I&II BARRICADES TO HAVE SAND BAG BALLASTS |
OVER BOTTOM RAILS. |
NO WORK ALLOWED BETWEEN |
7:00AM-9:00AM&4:00PM-6:00PM. |
PLEASE BE SURE TO CALL IN THE FOLLOWING |
INSPECTIONS (LISTED ON THE BACK OF THE PERMIT): |
B800,801,802,803,804,805,807 |
PLEASE BE SURE TO FOLLOW THESE SPECIAL CONDITIONS |
(LISTED ON THE BACK OF THE PERMIT): |
A,B,C,D,E,F,G,J,K,L,M600,SEE ATTACHED |