Miscellaneous Information / Notes |
NEW HYATT PLACE HOTEL. |
|
|
|
|
|
6/11/09 C OF O ISSUED.CALLED AARON FOR P/U.KC |
5/29/09 ELEC REVISIONS P/U BY AARON SLS |
5/21/09 CONTACTED CONTR PLANS READY FOR PU **LARGE |
BINS** "K" SEW |
5/20/09 RECEIVED AND APPROVED ELECTRICAL REVISIONS |
(#11). ASKING FIRE TO REVIEW CHANGES TO EXIT SIGNS |
AND WALL PACKS. DBW |
5/18/09 HOLDING REVISIONS TO ELECTRIC. WAITING ON |
CORRECTIONS. DBW |
05/14/2009 APPROVED SUBMITTAL THAT WAS SUBMITTED |
ON 05/2009 WAS P/U BY ARRON FRENCH MMILLER |
5/13/09 CALLED AARON TO P/U BLDG SUBMITTAL FOR |
ACOUSTIC CEILING. 'K'. RB |
5/12/09 EXPEDITED REQUEST AND ELECTRICAL REVISION |
ROUTED TO DOUG WISE. LEFT MSG FOR AARON REGARDING |
FEES AND DATE, CALL WAS NOT RETURNED. RJR |
5-8-09 REV #14 ELEC & POSSIBLY FIRE PER CONTR. PER |
AARON FRENCH REV FEES ARE TO BE PAID AFTER REV IS |
SUBMITTED, (CK STILL NEEDS TO BE CUT), PER CONV |
WITH D WISE. AARON GIVEN INVOICE FOR REV PLUS |
EXPEDITED PLAN REVIEW REQUEST (FEE ADDED BY R |
REGUEIRO) SEE NOTES BELOW WL |
5-8-09 EXPEDITED REVIEW REQUEST FOR ELEC & |
POSSIBLY FIRE, (C0NTR NOT SURE), ROUTED TO R |
REGUEIRO PER D WISE WL |
5/5/09 EXPEDITED REVIEW REQUEST SUBMITTED FOR BLDG |
SUBMITTAL AND ROUTED TO DWISE SEW |
5/5/09 BLDG SUBMITTAL ACOUSTICAL CEILING PRODUCT |
DATA SUBMITTAL SEW |
5/5/09 ELEC PLANS "AS-BUILTS" PU BY AARON SEW |
4/29/09 ELECTRICAL PLANS SUBMITTED AS "AS-BUILTS" |
MAY BE REVISIONS. CALLED AND SPOKE TO AARON AS HE |
WAS GOING TO FIND OUT WHETHER OR NOT THEY ARE |
INDEED REVISIONS WHICH ARE NEEDED. IF TRUE |
"AS-BULTS" ALL REVISIONS NEEDED TO DATE SHOULD |
AHVE ALREADY BEEN SUBMITTED AND AS-BUILTS ARE NOT |
REQUIRED. IF THEY ARE IN FACT REVISIONS, THEN FEES |
ARE DUE BEFORE REVIEWS ARE DONE. PLANS ARE UNDER |
"K" IN THE LARGER BROWN BINS. DV PALMER. |
|
4/24/09 ELEC SUBMITTAL AS BUILTS PLAN REVIEWER TO |
MAKE DECISION IF REVISION OR SUBMITTAL PER |
CONTRACTORS (AARONS) REQUEST NO FEE SLS |
4/24/09 BLDG SUBMITTAL P/U BY AARON SLS |
4/22/09 CALLED CONTRACTOR SPOKE WITH AARONS VOICE |
MAIL, SUBMITTAL FILED UNDER "K" SMALL PLAN JW |
4/22/09 DELETED REV FEE $140 FROM 4/17/09 |
SUBMITTAL PER JWITMER - WAS NOT A REVISION SEW |
4/17/09 BLDG REVISION INSTEAD OF SUBMITTAL ON |
HAND-RAILS REV # 14 PER GERALD $140 FEES DUE AT |
TIME OF P/U SLS |
4/17/09 BLDG SUBMITTAL HAND-RAILS NO FEE GAVE TO |
GERALD SLS |
4/17/09 RECD 3RD TCO LETTER $500 GAVE TO KEN SLS |
4/15/09 AARON P/U BLDG SUBMITTAL DATED 4/13/09 |
SPALMER |
4/14/09 CALLED CONTRACTOR FILED UNDER "K" SMALL |
PLAN |
SPOKE WITH AARON VOICE MAIL. JW |
4/13/09 BLDG SUBMITTAL INCLUDED MISSING |
DOCUMENTATION ROUTED TO JWITMER SEW |
3/18/09 PU BY AARON SEW |
3-16-09 CALLED RODOLFO LEFT MESSAGE ON VOICE MAIL |
PLANS FILED UNDER "K" SMALL PLAN JW |
3/13/09 2ND TCO ISSUED PUT IN CO BOX AT FRONT |
COUNTER UNDER (K) JDS |
03/12/2009 RCVD LETTER OF REQUEST FOR EXTENSION |
FOR TCO FEES $500.00 ROUTED TO KEN CONRAD'S DESK |
MMILLER |
3/3/09 BLDG SUBMITTAL ROOFTOP CAGE NO FEE SPALMER |
2/20/09 ELEC REV PU BY CLARISSA SEW |
2/20/09 TCO PU BY CLARISSA SEW |
2/18/09 REVISED TCO ISSUED JDS |
2/17/09 ELEC REV FROM 2/17 OK AND UNDER "K" (LARGE |
BINS) FOR PU. CALLED AND SPOKE TO RUDOLFO. DV |
PALMER. |
|
2/17/09 ELEC REV ADDRESSING COMMENTS DATED 2/16/09 |
$110 SEW |
2/17/09 EXPEDITED REVIEW REQUEST FROM 2/13/09 WAS |
FOR 6 HOURS. AN OVERAGE OF 1 HOUR FOR ELECTRICAL |
REVIEW WAS ADDED TO THE PERMIT FOR A GRAND TOTAL |
OF 27.5 HOURS. RJR |
2/17/09 PLUMBING/MECH REV PU BY CLARISSA SEW |
2/17/09 ELEC/BLDG/MECH REV PU BY CLARISSA SEW |
2/16/09 PLANS UNDER "K" (LARGE BINS) FOR PICK UP. |
CALLED AND SPOKE TO MATT AND CLARISSA. REMINDED OF |
BLUE CARD. DV PALMER. |
2/13/09 REQUEST FOR EXPEDITED PLAN REVIEW GIVEN TO |
RON REGUEIRO SPALMER |
2/13/09 REV ELEC/PLUMB/MECH $530 SPALMER |
2/13/09 CLARISSA P/U REV 8/9 SPALMER |
2/13/09 REVISIONS 8 AND 9 COMPLETED CALLED FOR |
P/U. SPOKE TO RODOLFO. 2 PACKAGES FILED UNDER "K" |
RJR |
2/13/09 EXPEDITED REVIEW REQUEST FROM 2/11/09: |
ADDED 2 HOURS OUTSTANDING FOR ADDITIONAL TRADE |
REVIEW, WHICH CHANGED THE TOTAL FROM 18.5 TO 20.5 |
HOURS. THE 2 HOURS CAN BE PAID UPON NEXT PLAN |
SUBMISSION. RJR |
2/11/09 ELEC & MECH REVISION # 11 $290 SLS |
2/11/09 EXPEDITED PLAN REVIEW LETTER SUBMITTED 2 |
HR MIN 2 TRADES ELEC & MECH $340 SLS |
2/06/09 TCO ISSUED, CUSTOMER PICKED UP, JDS |
02/04/2009 APPROVED BLDG DENIED ELECTRICAL |
APPROVED PLUMBING/DENIED PLUMBING APPROVED |
MECHANICAL APPROVED ZONING & APPROVED FIRE THAT |
WAS SUBMITTED ON 01/21/2009 WAS P/U BY CLARISSA |
MMILLER |
2/2/09 $300. FROM PERMIT # 08070026 APPLIED TO |
EXPEDITED PLAN REVIEW BALANCE PER RR/AMM |
2/2/09 EXPEDITED REVIEW COMPLETE. ESTIMATED TIME |
WAS 11 HOURS. TOTAL ACTUAL REVIEW TIME WAS 14.5 |
HOURS. A BALANCE OF 3.5 HOURS HAS BEEN ADDED TO |
THE FEES, TO BE PAID PRIOR TO FINAL INSPECTION. |
RJR |
2/2/09 PLANS ARE UNDER "K" ON FLOOR AT LARGE BINS. |
3 ROLLS AND LARGE BOX OF SUBMITTALS.LEFT MESSAGE |
ON CLARISSA'S CELL VM. REMINDED OF BLUE CARD. DV |
PALMER |
01/30/2009 PLUMBING & MECHANICAL REVISION #10 FEES |
$140.00 MMILLER |
1/28/09 LTR FOR TCO $500 SPALMER |
01/27/2009 CHARGED CUSTOMER A COMMERICAL |
RE-INSPECTION FEES FOR $100.00 DUE TO STARTING |
WORK PRIOR TO 7:00 AM ALSO RELEASED VIOLATION FEE |
BECAUSE PAID FEES MMILLER |
01/27/09 VIOLATION NOTICE ISSUED $100.00 FEE JDS |
01/22/2009 OK PER RON TO CHARGE EXPEDITED FEE |
MMILLER |
01/22/2009 RCVD LETTER "EXPEDITED PLAN REVIEW |
REQUEST FORM" ROUTED TON RON REGEURIO'S MMILLER |
*****CUSTOMER ONLY HAD A CHECK FOR IN THE AMOUNT |
OF $2300.00 GAVE CUSOTMER RCPT OF THE REMAINDER |
BALANCE AND INFORMED CUSTOMER THAT PLANS WILL NOT |
BE REVIEWED UNTIL BALANCE IS PAID MMILLER******* |
01/21/2009 BLDG ELECTRICAL PLUMBING & MECHANICAL |
REVISION #09 |
12-29-08 CLARISSA MARTINEZ PICKUP LANDSCAPE REV |
(DATED 12-23-08) WL |
12/24/08 - LANDSCAPE PLAN FAILED. CALLED CLARISSA |
FOR P/U. FILED UNDER K. ~MC |
12/23/08 CLARISSA P/U MECH REV SPALMER |
12/23/08 REV LANDSCAPE $80 SPALMER |
12/22/08 REV DATED 12/17/08 APPROVED, AND READY |
FOR P/U, UNDER(K), **LARGE BINNS** SPOKE TO |
CLARISSA ADARROUGH |
12/17/08 MECH REV M101A M101B M102A M102B M103B |
$200 SEW |
12/17/08 SUBMITTAL PU BY CLARISSA SEW |
12-12-08 CALLED CONTRACTOR AND SPOKE WITH CLARISSA |
SUBMITTALS FILED UNDER "K" SMALL PLANS JW |
12-10-08 CLARISSA MARTINEZ PICKUP SUBMITTAL |
#2831111 (FIRE/ELEC DATED 8-22-08) & 3 BLDG |
SUBMITTALS (#088000-8-R1, #088000-12 #088000-9 |
DATED 12-4-08) WL |
12/10/08 3 BLDG SUBMITTALS DATED 12/4/08, ARE |
READY FOR P/U, UNDER(K)**LARGE BINNS** LEFT VM |
MESSAGE ADARROUGH |
12/4/08 BLDG SUBMITTAL 3 COPIES OF THE NON DOOR |
SUBMITTAL #081100-3 SEW |
12/04/2008 APPROVED BLDG DENIED ELECTRICAL |
APPROVED PLUMBING/DENIED PLUMBING APPROVED |
MECHANICAL APPROVED ZONING & APPROVED FIRE THAT |
WAS SUBMITTED ON 10/15/2008 WAS P/U BY RODOLFO |
MMILLER |
12/04/2008 BLDG SUBMITTAL NO FEE (ACCURATE GLASS |
HOP DRAWINGS PLEASE FIND 3 COPIES ATTACHED FOR |
YOUR REVIEW) ROUTED TO JIM WITMER'S DESK MMILLER |
12/04/2008 (2) BLDG SUBMITTALS NO FEE ( WINDOW |
CALCULATIONS ATTACHED IS THE WINDOW SYSTEM |
SUBMJITTED FROM CHAMPION GLASS 3 COPIES) BOTH |
ROUTED TOGETHER ROUTED TOJIM WITMER'S DESK MMILLER |
11/25/08 BLDG SUBMITTAL LOUVER #089100-5 SEW |
11/25/08 BLDG SUBMITTAL GLASS ENCLOSURE PU BY |
CLARISSA SEW |
11/25/08 BLDG SUBMITTAL #081100-3 PU BY CLARISSA |
SEW |
11-24-08 CALLED CONTRACTOR AND SPOKE WITH CLARISSA |
PLANS FILED UNDER "K" SMALL PLAN JW |
11/21/08 CALLED FOR P/U FLOOR OF LARGE BIN AREA |
MRW |
11/17/08 ONE SET OF PLANS TAKEN TO FIRE STATION |
PER MWILLIAMS SEW |
11/17/08 BLDG SUBMITTAL CAME IN ON 11/5/08 AS A |
REV $120 DID NOT GET REVIEWED BECAUSE 3SETS WERE |
NEEDED SEW |
11-12-08 TELEPHONE CONVERSATION WITH BOB VAIL. |
RULE 9B-3.0472 REQUIREMENT FOR CO ALARMS IS NOT |
APPLICABLE BECAUSE THE "STRUCTURE ONLY" PERMIT WAS |
ISSUED ON 1/17/08 SO A PERMIT FOR "NEW |
CONSTRUCTION" WAS IN FACT ISSUED PRIOR TO THE |
7/1/08 DATE IN THE RULE. RB |
11-12-08 PETER NUNEZ PICKUP (1) BLDG REV (DATED |
11-5-08 GLASS ENCL...PART OF PKG OF 5 SEE NOTES |
BELOW DATED 11-7-08) WL |
11-07-08 CALLED CONTRACTOR (5) SUBMITTALS FILED |
UNDER |
"K" LARGE PLAN JW |
11/7/08 BLDG SUBMITTAL #081100-3 SEW |
11/7/08 PLUMBING SUBMITTAL PU BY CLARISSA SEW |
11-06-08 CALLED FOR P/U OF PLMG SUGMITTALS AND |
TALKED TO ROLDOLFO INDICATING THE SUBMITTALS WERE |
APPROVED AND THE BLUE CARD WAS REQUIRED. "K" |
*LARGE BIN* KSTEVENS/WL |
11/05/2008 ROUTED TO JERALD'S SMITH DESK MMILLER |
11/5/08 BLDG REV FURNISH & INSTALL GLASS ENCLOSURE |
FOR ILLUMINATED STRUCTURE $120 SEW |
11/3/08 200 BLDG SUBMITTALS CONCRETE DENSITY TESTS |
NO FEE GAVE TO JERALD SMITH SLS |
11/3/08 BLDG SUBMITTAL # 042200-3 NO FEE SLS |
10/27/08 BLDG SUBMITTAL LOUVER #089100-5 SEW |
10/27/08 BLDG SUBMITTAL DATED 10/9/08 PU BY SAM |
SEW |
10-23-08 CALLED KAST FILED UNDER "K" LARGE |
PLANLEFT MESSAGE ON VOICE MAIL JW |
10/22/08 BLDG SUBMITTAL STEEL STAIR SHOP DRAWINGS |
# 055100-5 SEW |
10/22/08 BLDG SUBMITTAL STEEL STAIR CALCS |
#055100-1 SEW |
10/21/08 PLUMBING SUBMITTAL # 224000-1R2 SEW |
10/21/08 PU BY SAM SEW |
10-17-08 CALLED CONTRACTOR SPOKE WITH RODOLFO |
PLANS FILED UNDER "K" LARGE PLAN JW |
10/15/2008 BUILDING, ELECTRICAL, PLUMBING, |
MECHANICAL, ZONING, FIRE, & ENGINEERING REVISION |
#05 FEES $ 1950.00 MMILLER |
10/08/2008 BLDG SUBMITTAL NO FEE (PLEASE REVIEW |
AND APPROVE THE EXTERIOR METAL STUD FRAMING |
SUBMITTAL #092214-7) MMILLER |
10/03/08 SUBMITTAL #092116-04 NO FEE SPALMER |
9-29-08 SAM JOSEPH PICKUP SUBMITTAL 055000-12 |
(DATED 9-15-08) WL |
9/29/08 DENIED SUBMITTAL UP FRONT UNDER(K), SPOKE |
TO RODOLFO ROBLES ADARROUGH |
9-24-08 JENNIFER LESLIE PICKUP DENIED ENG |
SUBMITTAL (DATED 9-15-08) WL |
9/24/08 CALLED TO P/U DENIED PLANS, BIN "K", RVC |
9-24-08 SAM JOSEPH PICKUP 2 BLDG SUBMITTALS |
#088000-8R1 & 088000-8 (DATED 8-22-08) & REV #4 |
MECH (DATED 9-5-08) WL |
9-23-08 CALED CONTRACTOR AND SPOKE WITH RADOLFO |
PLANS ARE FILED UNDER "K" LARGE PLAN JW |
9/23/08 - ZONING FAILED. SENT TO INCOMING FOR |
FURTHER PROCESSING. ~MC |
9/19/08 SAM P/U BLDG SUBMITTAL CONCRETE SHOWER |
SPALMER |
9/19/08 SAM P/U BLDG SUBMITTAL #078400-2 SPALMER |
9/19/08 SAM P/U BLDG SUBMITTAL #142423-1 SPALMER |
9/19/08 SAM P/U BLDG SUBMITTAL #055000-15 SPALMER+ |
9/15/08 BLDG SUBMITTAL # 089100-5 LOUVERS SLS |
9/15/08 BLDG SUBMITTAL # 055000-12 BIKE RACK SLS |
9/15/08 BLDG SUBMITTAL # 055000-16 DUMPSTER GATE |
SLS |
9/15/08 BLDG SUBMITTAL # 142423-1 ELEVATOR SLS |
9/15/08 BLDG SUBMITTAL # 055000-15 SEPARATOR BEAM |
SLS |
9/15/08 BLDG SUBMITTAL # 055000-8 STEEL BOLLARD |
SLS |
9/15/08 MECH REV #5 CALLED FOR P/U. LEFT MSG FOR |
PHIL LONGO ON CELL PHONE. LG BIN UNDER "K" RJR |
09/11/2008 BLDG SUBMITTAL & PLUMBING SUBMITTAL |
(TILE MORTAR FOR THE TYPICAL 4"X4" CONCRETE SHOWER |
CURB INSTALLATIONS SUBMITTAL # 093000-21 ALSO |
BEFORE TO REVIEW THE ATTACHED SHOWER CURB |
SUBMITTAL 09-3000-5) NO FEE MMILLER |
9/9/08 SUBMITTAL PRODUCT APPROVAL TREM STOP |
#078400-2 NO FEE SPALMER |
9/9/08 SUBMITTAL ELEVATOR HOIST #055000-11 NO FEE |
SPALMER |
09-09-08 CALLED CONTRACTOR AND SPOKE WITH RODOLFO |
FILED UNDER "K" LARGE PLANS JW |
9-5-08 REV #4 MECH $110 "ATTENTION PLAN REVIEW" WL |
09-04-08 CALLED CONTRACTOR AND SPOKE WITH RODOLFO |
ROOFING SUBMITTALS FILED UNDER "K" SMALL PLAN JW |
9/3/08 SAM JOSEPH P/U REVISIONS |
9-3-8 CALLED FOR P/U OF PLMG REVISION TALKED TO |
SAM JOSEPH INDICATING THE REVISION WAS APPROVED |
AND THAT THE RECIEPT OR BLUE CARD WAS REQUIRED TO |
RETRIEVE THE REVISION. "K" KSTEVENS |
9-2-08 CLARISSA MARTINEZ PICKUP (9) MECH |
SUBMITTALS E#230529-3, 233713-2, 233300-2, |
233713-3, 236200-02, 237433-1, 237433-3, 237433-4, |
& 233713-1 WL |
9-2-08 NINE SEPERATE MECH SUBMITTALS, IN ONE |
PACKAGE READY FOR P/U. SPOKE TO RODOLFO. LG BIN |
UNDER "K" RJR |
9-2-08 SAM JOSEPH [PICKUP BLDG SUBMITTAL #233713-4 |
ELEV LOUVER) WL |
8-29-08 CALLED CONTRACTOR SPOKE WITH RODOLFO, |
REVISION FILED UNDER "K" SMALL PLANS JW |
8/29/08 BLDG SUBMITTAL ROOFING PRODUCT DATA SEW |
8/29/08 BLDG SUBMITTAL MISC METALS PRODUCT DATA & |
SUBMITTALS SEW |
8/29/08 SPEC BOOKS PU BY CLARISSA SEW |
8/29/08 MECH REV PU BY CLARISSA SEW |
8/28/08 MECH REVISIONS CALLED FOR P/U SPOKE TO |
CLARISSA. LG BIN UNDER "K" RJR |
8-28-08 REV #3 PLUMB $60 "P-600 DRAWING THAT WAS |
PREVIOUSLY REJECTED BY CITY" WL |
8/22/08 SPEC BOOKS FILED UNDER 'K' (LARGE BIN) |
8-22-08 (22) NO FEE SUBMITTALS (20) ELEC |
"SUBMITTAL #260526 GROUNDING & BONDING,#263600 |
TRANSFER SWITCH,#260923 LIGHTING CONTROL |
DEVICES,#284700 INTEGRATED GUEST RM CONTROL SYS, |
#2831111 DIGITAL ADDRESSABLE FIRE ALARM,#260500 |
SLEEVE SEALS,#260519 LOWVOLTAGE CONDUCTORS & |
CABLES,#260529 HANGERS & SUPPORTS,#260533 RACEWAY |
& SIGNS,#260553 IDENTIFICATION FOR ELEC |
SYS,#262200 LOW VOLTAGE TRANSFORMERS,#262416 PANEL |
BOARDS,#262816 ENCLOSED SWITCHES & CIRCUIT |
BREAKERS,#262913 ENCLOSED CONTROLLERS,#264313 |
TRANSIENT VOLTAGE SUPPRESSION,#262413 |
SWITCHBOARDS,#274134 BROADBAND DISTRIBUTION |
SYS,#271000 STRUCTURED CABLING SYS,#265100 INTER |
LIGHTING, #262726 WIRING DEVICES, & (2) BLDG |
SUBMITTAL #088000-8 R1 WINDOW SHOP DRAWINGS & |
088000-9 WINDOW CALCULATIONS" WL |
8/18/08 SAM P/U PLUMBING REVISIONS JREYES |
8-18-8 CALLED FOR P/U OF PLMG REVISIONS SUBMITTED |
ON 8-14-8. TALKED TO SAM J. INDICATING THAT 4 |
SHEETS WERE APPROVED AND ONE DENIED. ALSO |
INDICATED THAT THE RECIEPT OR BLUE CARD WAS |
REQUIRED TO RETRIEVE THE REVISIONS. "K-LARGE" |
KSTEVENS |
8/15/08 BLDG SUBMITTAL # 236200-02 PTAC UNITS |
AMANA |
8/15/08 BLDG SUBMITTAL # 237433-1 OUTDOOR |
HTG/COOLING MAKE UP A/C'S SLS |
8/15/08 BLDG SUBMITTAL # 237433-02 POOLCOMPAK SLS |
8/15/08 BLDG SUBMITTAL # 237433-3 OUTSIDE AIR |
ROOFTOP UNITS SLS |
8/15/08 BLDG SUBMITTAL # 237433-4 ADDISON UNIT |
SLS |
8/15/08 BLDG SUBMITTAL # 233713-1 DIFFUSERS |
REGISTERS & GRILLS SLS |
8/15/08 BLDG SUBMITTAL # 233713-2 VULCAIN 301C |
SLS |
8/15/08 BLDG SUBMITTAL # 233713-3 REV 1 LINEAR |
DIFFUSERS SLS |
8/15/08 BLDG SUBMITTAL # 233300-2 SMOKE DAMPERS |
SLS |
8/15/08 BLDG SUBMITTAL # 230529-3 CONC DECK ANCHOR |
SLS |
8/15/08 BLDG SUBMITTAL # 233713-4 REV 1 ELEVATOR |
LOUVER SLS |
08/14/2008 MECHANICAL REVISION # 01 FEES $110.00 |
MMILLER |
7/25/08 2 ROLL PLANS & 2 SPEC BOOKS P/U BY |
JENNIFER STILL OWE 2 CUT SHEET BOOKS PER DEWEY |
SLS |
7/24/08 ONE ROLL UNDER "K" (LARGE BINS) FOR PU. |
CALLED AND SPOKE TO MATT TO LET HIM KNOW ONE SET |
CAN BE PICKED UP FOR INSPECTIONS. DV PALMER. |
07/24/2008 PERMIT P/U BY SAM PLANS STILL IN |
PROCESSING PER DEWEY PALMER MMILLER |
7/23/08 DIANA COLON RETURNED THREE ROLLS OF PLANS |
FOR ELECTRICAL REVIEW TO ADDRESS LAST OF COMMENTS. |
RAB |
7/23/08 APP/PLANS OUT WITH DIANA COLON TO INSERT |
NEW E-201, E-203, E-204, ETC. SHEETS PER ROBERT |
SLS |
7/21/08 REVISION FILED UNDER 'S' LM 07/15/2008 |
FIRE SUBMITTAL FEE PUT WITH 3RD RESUB PLANS PLUS |
APP NO FEE MMILLER |
7/9/08 3RD RESUB W/PLANS & APPL $13,661.61 SEW |
7/7/08 CLARISSA P/U DENIED PLANS SPALMER |
7-3-08 CALLED FOR P/U AND LEFT A MESSAGE ON MATT'S |
VOICE MAIL INDICATING THAT THERE WERE COMMENTS BY |
PLMG AND ELEC TO BE ADDRESSED AND THAT THE BLUE |
CARD OR RECIEPT WAS REQUIRED TO RETRIEVE THE PLANS |
AND SUBMITTAL BOOKS. "K-LARGE BOTTOM BINS/FLOOR. |
KSTEVENS |
7/2/08 SHORING LETTER & POUR DATE LETTER SUBMITTED |
FOR DIANE GIVEN TO DIANE SLS |
7/2/08 NEIL APPROVED REQUEST FOR PERMISSION TO |
START UP TO FIRST TO INSPECTION PRIOR TO PERMIT |
ISSUANCE. RB |
06/02/2008 2ND RESUB PLANS PLUS APP MMILLER |
5/27/08 PU BY SAM SEW |
5/24/08 E-MAILED MATT HORNBERGER FOR PLAN P/U. |
LARGE BINS. 'K'. RB |
05/13/2008 BLDG SUBMITTAL NO FEE (ENERGY |
CALCULATIONS) HOWEVER EXPLAINED TO CUSTOMER THAT |
ONCE THE BLDG PLANS EXAMINER REVIEWS THE ENERGY |
CALCS THEN CUSTMER WILL NEED TO PAY A REVISION FEE |
INSTEAD OF A SUBMITTAL CUSTOMER MMILLER |
|
04/22/2008 ADDED A BOX TO PLANS THAT WERE SUBITTED |
ON |
|
04/17/2008 WHICH WAS A BOX WITH 5 BIG BINDERS AND |
ONE ROLL TO GO WITH EXISITNG PLANS THAT WERE |
SUBMITTED MMILLER |
4-18-08 SAM JOSEPH SUBMIT NOTICE FOR LATE NIGHT |
CONCRETE POUR ROUTED DIRECTLY TO DIANE FULCHER WL |
4-18-08 SAM JOSEPH SUBMIT ORIG APPL PLACED IN |
PERMIT PKG WL |
*****OKAY TO TAKE RESUB IN WITH A COPY OF ORIGINAL |
APPLCATION PER LUIS MARTINEZ HOWEVER CUSTOMER MUST |
PROVIDE THE ATUAL ORGINIAL APPLICATION PRIOR TO |
ISSUANCE OF A PERMIT MMILLER******* |
04/17/2008 1ST RESUB PLANS PLUS APP NO FEE |
MMILLER |
3/25/08 PU BY SAM JOSEPH SEW |
3/24/08 CALL FOR P/U W/CORR'S, UNDER(K) **ROLLED |
PLANS*** LEFT MESSAGE ON BARRY KRAFT'S VM |
ADARROUGH |