Miscellaneous Information / Notes |
4 STORY HOTEL *****BUILDING PERMIT ONLY*********** |
OWES MONEY FOR REVISIONS 12-21-00 |
6/5/00. ALL OTHER PERMITS TO BE ISSUED SEPARATELY |
REVISION 6/12/00 SJOHNSON |
REVISION 6/20/00 SJOHNSON |
REVISION 6-26-00SG ELECT/MECH |
REVISION 6-26-00SG FOUNDATION |
REVISION 7/3/00 SJOHNSON SOIL DENSITY |
REV-7-20-00SG PLUMBING |
REVISION 8-4-00SG PD 1250.00 #169577 |
PLUMBING OK TO ISSUE.FOR UNDERGROUND ONLY!NO ABOVE |
SLAB WORK UNTIL REVISIONS ARE APPROVED.8/18/00.TKL |
REV 8-31-00SG |
****PLUMBING PLANS APPROVED FOR ENTIRE SYSTEM |
EXCEPT POOL HOUSE.ADDITIONAL PLBG.FIXTURES |
MAY BE REQUIRED PENDING HEALTH DEPT.REVIEW. |
9/5/00.TKL.PLBG.RISERS REQD.FOR POOL HOUSE. |
10/5/00 WINDOW PRODUCT APPROVALS OK LS |
12/6/00 SUBMITTED SHOP DRAWINGS. LCN |
12/27/00 LEFT MESSAGE TO PICK UP REVISIONS FROM |
12/11/00. LCN |
SUBMITTALS TRUSS DRAWINGS/CALC. 01/12/01 SJOHNSON |
PERMIT P/U BILL RIELLY 1/19/01 SJOHNSON |
MIKE SANFORD PICK UP TRANSMITTALS 1-26-2001 WL |
SUBMITTAL OF SHOP DRAWINGS 2-15-01 AN |
SHOP DRAWINGS 2/20/01 SJOHNSON |
P/U OLD PLANS PLUMBING ERIC CANNON 2/20/01 SJOHNSO |
PICK UP SHOP DRAWINGS ERIC CANNON 2-28-2001 WL |
SHOP DRAWINGS SLIDING GLASS DOORS/WINDOWS NO FEE |
CHARGED 3-2-2001 WL |
PU SHOP DRAWINGS BY ERIC 3-6-01 AN |
PU BY BERNARDITA 3-13-01 SUBMITTALS AN |
3-21 SUBMITTAL |
SUBMITTALS P/U BRIAN SHAW 3/23/01 SJOHNSON |
SUBMITTALS TO DON NEELY 3/21/01 |
FEE OWED ON SUBMITTAL/REVISION. BZ#183128 $70 DV P |
ALMER. |
REVISION ELEC 3/29/01 BZ183293 $60 SJOHNSON |
PU BY ERIC 4-2-01 REVISION 220.00 AN |
REVISION P/U ERIC CANNON 4/9/01 SJOHNSON |
4/10/01 REVISION FOR BLD,PLUMB,ELECBZ183983#220 YD |
REVISION PLUMB 04/20/01 DR |
5/1/01 REVISION FOR ELEC BZ184795 $170 YD |
5/1/01 ERIC PU PLANS FOR REVISION YD |
BILL P/U REVISIONS FROM 4/10/01 LS 5/16/01 |
PU BY ERIC 6-4-01 REVISION ELEC AN |
REV. PLUMB 7/25/01 P$60. BZ188419 LS |
REV FOR PLUMB PU BY RYAN 9-19-01 TJ |