Plan Review Notes
Plan Review Notes For Project Z23060037
Project Number Z23060037
Review Stop STORM
Sequence Number 1
Notes
Date Text
2023-07-13 08:19:46THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL
 DETAILS, DESIGN CALCULATIONS AND THE POLLUTION
 PREVENTION PLAN WILL BE REVIEWED AS PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT
 APPLICATION PROCESSES.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE
 PLAN APPROVAL. ONLY THE PLANS FOR THE PARKING LOT
 BETWEEN THE ALLEY AND EVERNIA ST. WAS REVIEWED.
  
 1. THE INVERT ELEVATION OF THE BLEEDER WILL ESTABLISH
 THE MAXIMUM VALUE FOR H2 IN THE EXFILTRATION TRENCH
 EQUATION.
  
 2. REMOVE THE PARKING SPACE NUMBERING FROM ALL PLAN
 SHEETS EXCEPT THE SITE PLAN.
  
 3. PGD PLAN SHOWS EXISTING 15-INCH RCP SOUTH OF THE
 CONTROL STRUCTURE. CONTROL STRUCTURE DETAIL SHOWS
 18-INCH RCP.
  
 4. REVIEW LABEL FOR THE INVERTED DEBRIS BAFFLE SHOWN ON
 THE PLAN VIEW OF THE CONTROL STRUCTURE DETAIL. IT LISTS
 TOP AND BOTTOM AS BEING CLOSED. SECTION A-A LISTS THE
 TOP AS BEING OPEN.
  
 5. PARKING LOT SECTION ON SHEET C-06 CALLS OUT ONE LIFT
 OF 1-INCH FC9.5 ASPHALT AND 6-INCH LIMEROCK BASE.
 STANDARD ASPHALT PAVEMENT DETAIL ON SHEET C-07 CALLS
 OUT TWO LIFTS OF 1-INCH SP9.5 ASPHALT AND 8 INCH
 LIMEROCK BASE.
  
 6. PROVIDE A PRB DETAIL.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL.
  
 1. DRAINAGE SYSTEM TO BE DESIGNED TO MEET SFWMD ERP
 CRITERIA. STORMWATER CALCULATIONS WILL BE REVIEWED WITH
 THE ENGINEERING PERMIT SUBMITTAL.
  
 2. PROVIDE COPY OF SFWMD ERP AND FDEP NPDES
 CONSTRUCTION PERMIT BEFORE START OF CONSTRUCTION.
  
 3. PROVIDE EROSION AND SEDIMENT CONTROL PLAN WITH THE
 ENGINEERING PERMIT SUBMITTAL.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT