Plan Review Notes
Plan Review Notes For Project Z23060021
Project Number Z23060021
Review Stop Z
Sequence Number 1
Notes
Date Text
2023-06-26 13:37:19CASE NO. ISPR 14-06F
 MANATEE EDUCATION CENTER EV PARKING EXPANSION
 5904 NORTH FLAGLER DRIVE
  
 - CONTACT ERIC SCHNEIDER @ 561-822-1446,
 [email protected]
  
 - PLEASE PROVIDE RESPONSES TO REVIEW COMMENTS IN
 WRITTEN FORMAT.
  
 - WHEN RESUBMITTING, PLEASE PROVIDE TWO (2) PAPER
 COPIES AND AN ELECTRONIC COPY IN .PDF FORMAT OF ALL
 PLANS. PLEASE NOTE THAT CHANGES ON THE RESUBMITTED
 PLANS OR THE SUBMITTAL OF INFORMATION/PLANS TO ADDRESS
 THE COMMENTS MAY RESULT IN ADDITIONAL COMMENTS.
  
 - PLEASE NOTE THAT IF THE PLANNING DIVISION HAS NOT
 RECEIVED A RESPONSE TO THE PPRC COMMENTS WITHIN 60 DAYS
 FROM THE DATE OF THE PPRC MEETING (BY SEPTEMBER 13,
 2023), THE PLANNING DIVISION MAY NOTIFY THE APPLICANT
 THAT THE CASE IS CONSIDERED WITHDRAWN. ANY FURTHER
 ACTION SHALL REQUIRE A NEW DEVELOPMENT APPLICATION.
  
 - PLEASE NOTE THAT YOU WILL BE PERMITTED ONE (1)
 RESUBMITTAL AT NO ADDITIONAL COST. IF PREVIOUSLY ISSUED
 COMMENTS CONTINUE TO NOT BE SUFFICIENTLY ADDRESSED, THE
 APPLICANT WILL BE ASSESSED A RESUBMITTAL FEE. SUCH FEE
 WILL BE 20% OF THE ORIGINAL APPLICATION FEE ($60).
  
 1) THE PLANS DO NOT ACCURATELY SHOW THE EXISTING TREES
 WITHIN THE LIMITS OF WORK. THERE ARE TWO CRAPE MYRTLE
 TREES THAT ARE LOCATED IN THE TERMINAL ISLAND TO THE
 WEST OF THE EXISTING EV PARKING SPACES. THESE ARE NOT
 SHOWN ON THE SURVEY OR INDICATED ON THE LANDSCAPE OR
 CIVIL PLANS. THESE PLANS WERE SHOWN AS RELOCATED HERE
 AS PART CHANGED MADE IN 2018 AND ARE VISIBLE ON THE
 PICTOMETRY OF THE AREA; HOWEVER, THEY SEEM TO HAVE BEEN
 MISSED ON SUBSEQUENT LANDSCAPE PLANS. THE DISPOSITION
 OF THESE TREES NEEDS TO BE ACCURATELY LISTED, TO
 INCLUDE ANY REQUIRED MITIGATION IF THEY ARE REMOVED.
  
 2) THE LANDSCAPE PLANS CALL OUT FOUR RELOCATED SABAL
 PALMS; HOWEVER, THERE DO NOT APPEAR TO BE FOUR SABAL
 PALMS IN THE LIMITS OF WORK AS THE SURVEY AND CIVIL
 PLAN SHOW MULTIPLE SYMBOLS FOR THESE TREES. THE DATA
 TABLE ON THE LANDSCAPE PLAN REFERS THE TREE ALTERATION
 PERMIT, BUT STAFF DOES NOT SEE ONE THAT WAS RECENTLY
 SUBMITTED. PLEASE CLARIFY, INCLUDING THE PROVISION OF
 DOCUMENTATION.
  
 3) DO THE NEW EV SPACES REQUIRE ANY NEW ABOVE GRADE EV
 INFRASTRUCTURE OTHER THAN THE CHARGING STATION ITSELF,
 SUCH AS TRANSFORMERS, CHARGE BOXES, ETC.? IF SO, THESE
 SHALL BE CLEARLY SHOWN ON THE PLANS.
  