| Date |
Text |
| 2023-06-06 15:44:14 | PLEASE PROVIDE THE FOLLOWING: |
| | |
| | 1. PLEASE SHOW LOCATION OF DUMPSTER ENCLOSURE |
| | 2. DUMPSTER ENCLOSURE DETAILS FOR SANITATION SERVICE |
| | (I.E. SOLID WASTE CONTAINER(S) TYPE, COLLECTION |
| | LOCATION, ETC.). FOR A FREESTANDING SITE DUMPSTER |
| | ENCLOSURE. THE ENCLOSURE SHALL COMPLY WITH THE LATEST |
| | REVISION OF CITY OF WEST PALM BEACH GENERAL |
| | CONSTRUCTION GARBAGE ENCLOSURE STANDARD. GC-7 |
| | 3. PLEASE PROVIDE AN AUTOTURN PLAN.?? TRAVEL PATHS |
| | SHOULD BEGIN OUTSIDE THE SITE ILLUSTRATING THE TURN |
| | ONTO THE PRIMARY ENTRY ROAD/DRIVE, MANEUVERING AROUND |
| | THE SITE, AND COMPLETED WITH AN ILLUSTRATION |
| | DEMONSTRATING EXITING THE SITE. |
| | PATHS MUST ILLUSTRATE THE FULL VEHICLE SWEPT PATH |
| | (INCLUDING WHEEL TRACKS AND OUT-TO-OUT VEHICLE OVERHANG |
| | SWEEP) AND MUST INDICATE A CLEAR, UNOBSTRUCTED TRAVEL |
| | AROUND THE SITE WITHOUT IMPACT/COLLISIONS TO BUILDINGS, |
| | CURBS, LANDSCAPING, PARKING SPACES, VEHICLES, ETC??? |
| | |
| | AUTOTURN EXHIBIT WITH DYNAMIC ENVELOPE AND THE |
| | VEHICLE'S WHEEL PATH IDENTIFIED WITH DIFFERENT COLORS |
| | FOR THE SANITATION SERVICE, FRONT LOADER TRUCK WITH THE |
| | FOLLOWING SPECS: |
| | - DUAL AXLES |
| | - TRUCK LENGTH: 35 FT |
| | - TIRE PATH WIDTH: 8FT |
| | - DYNAMIC ENVELOPE WIDTH: 11 FT |
| | - TURNING RADIUS: |
| | - SAE TURNING RADIUS: 325FT |
| | - CURB TO CURB DIAMETER: 74 FT |
| | - WALL TO WAII DIAMETER: 86 3FT |
| | |
| | |
| | BRUCELY A. JOSEPH |
| | PUBLIC WORKS PROGRAM MANAGER |
| | [email protected] |
| | 561-494-1141 |
| | |
| |
Print |