Plan Review Notes
Plan Review Notes For Project Z23040023
Project Number Z23040023
Review Stop STORM
Sequence Number 1
Notes
Date Text
2023-05-10 13:41:54THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL
 DETAILS, DESIGN CALCULATIONS AND THE POLLUTION
 PREVENTION PLAN WILL BE REVIEWED AS PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT
 APPLICATION PROCESSES.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE
 PLAN APPROVAL:
  
 1. THE CITY'S OFFICIAL VERTICAL DATUM PER CITY CODE IS
 NGVD1929. THE NAVD1988 VERTICAL DATUM MAY BE USED IF
 THE CONVERSION EQUATION BETWEEN NAVD1988 AND NGVD1929
 IS PROVIDED. LABEL THE VERTICAL DATUM ON THE SURVEY AND
 LIST THE CONVERSION TO NGVD1929.
  
 2. REVIEW ALLOWABLE SLOPING REQUIREMENTS FOR HANDICAP
 PARKING SPACES (MAX. 2% IN ALL DIRECTIONS) AND ADJUST
 PROPOSED GRADES ACCORDINGLY.
  
 3. CREATE RETENTION AREAS BEHIND THE SIDEWALKS TO HOLD
 STORMWATER RUNOFF ONSITE.
  
 4. LABEL PERIMETER WALLS / FENCES.
  
 5. INDICATE HOW/WHERE THE AREA SOUTH OF THE BUILDING
 WILL DRAIN.
  
 6. CONNECT ROOF DRAINS DIRECTLY TO THE STORMWATER
 DRAINAGE SYSTEM.
  
 7. NO STORMWATER RUNOFF IS ALLOWED TO FLOW ONTO
 ADJACENT PRIVATE PROPERTY.
  
 8. PROVIDE A CROSS SECTION AT THE DRIVEWAY FROM THE
 NORTH ALLEY R/W TO THE SOUTH PROPERTY LINE OF THE SITE.
 SHOW SURFACE FEATURES, GENERAL DIRECTION OF HOW
 SURFACES SLOPE, LOCATION OF HIGH POINT SOUTH OF THE
 ALLEY, DIMENSIONS, ETC. CREATE A HIGH POINT IN THE
 DRIVEWAY SOUTH OF THE NORTH PROPERTY LINE TO KEEP THE
 ALLEY RUNOFF FROM FLOWING INTO THE ONSITE DRAINAGE
 SYSTEM. THE NORTH CATCH BASIN WILL NEED TO BE LOCATED
 SOUTH OF THE HIGH POINT..THE DRIVEWAY PAVER AREA SHOULD
 BE SLOPED TO THE CATCH BASINS.
  
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL.
  
 1. DRAINAGE SYSTEM TO BE DESIGNED TO MEET SFWMD ERP
 CRITERIA. STORMWATER CALCULATIONS WILL BE REVIEWED WITH
 THE ENGINEERING PERMIT SUBMITTAL.
  
 2. PROVIDE COPY OF SFWMD ERP AND FDEP NPDES
 CONSTRUCTION PERMIT BEFORE START OF CONSTRUCTION.
  
 3. PROVIDE EROSION AND SEDIMENT CONTROL PLAN WITH THE
 ENGINEERING PERMIT SUBMITTAL.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120 (O)
 [email protected]
  