| 2023-05-10 13:41:54 | THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL |
| | DETAILS, DESIGN CALCULATIONS AND THE POLLUTION |
| | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE |
| | ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT |
| | APPLICATION PROCESSES. |
| | |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE |
| | PLAN APPROVAL: |
| | |
| | 1. THE CITY'S OFFICIAL VERTICAL DATUM PER CITY CODE IS |
| | NGVD1929. THE NAVD1988 VERTICAL DATUM MAY BE USED IF |
| | THE CONVERSION EQUATION BETWEEN NAVD1988 AND NGVD1929 |
| | IS PROVIDED. LABEL THE VERTICAL DATUM ON THE SURVEY AND |
| | LIST THE CONVERSION TO NGVD1929. |
| | |
| | 2. REVIEW ALLOWABLE SLOPING REQUIREMENTS FOR HANDICAP |
| | PARKING SPACES (MAX. 2% IN ALL DIRECTIONS) AND ADJUST |
| | PROPOSED GRADES ACCORDINGLY. |
| | |
| | 3. CREATE RETENTION AREAS BEHIND THE SIDEWALKS TO HOLD |
| | STORMWATER RUNOFF ONSITE. |
| | |
| | 4. LABEL PERIMETER WALLS / FENCES. |
| | |
| | 5. INDICATE HOW/WHERE THE AREA SOUTH OF THE BUILDING |
| | WILL DRAIN. |
| | |
| | 6. CONNECT ROOF DRAINS DIRECTLY TO THE STORMWATER |
| | DRAINAGE SYSTEM. |
| | |
| | 7. NO STORMWATER RUNOFF IS ALLOWED TO FLOW ONTO |
| | ADJACENT PRIVATE PROPERTY. |
| | |
| | 8. PROVIDE A CROSS SECTION AT THE DRIVEWAY FROM THE |
| | NORTH ALLEY R/W TO THE SOUTH PROPERTY LINE OF THE SITE. |
| | SHOW SURFACE FEATURES, GENERAL DIRECTION OF HOW |
| | SURFACES SLOPE, LOCATION OF HIGH POINT SOUTH OF THE |
| | ALLEY, DIMENSIONS, ETC. CREATE A HIGH POINT IN THE |
| | DRIVEWAY SOUTH OF THE NORTH PROPERTY LINE TO KEEP THE |
| | ALLEY RUNOFF FROM FLOWING INTO THE ONSITE DRAINAGE |
| | SYSTEM. THE NORTH CATCH BASIN WILL NEED TO BE LOCATED |
| | SOUTH OF THE HIGH POINT..THE DRIVEWAY PAVER AREA SHOULD |
| | BE SLOPED TO THE CATCH BASINS. |
| | |
| | |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO |
| | ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING |
| | BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL. |
| | |
| | 1. DRAINAGE SYSTEM TO BE DESIGNED TO MEET SFWMD ERP |
| | CRITERIA. STORMWATER CALCULATIONS WILL BE REVIEWED WITH |
| | THE ENGINEERING PERMIT SUBMITTAL. |
| | |
| | 2. PROVIDE COPY OF SFWMD ERP AND FDEP NPDES |
| | CONSTRUCTION PERMIT BEFORE START OF CONSTRUCTION. |
| | |
| | 3. PROVIDE EROSION AND SEDIMENT CONTROL PLAN WITH THE |
| | ENGINEERING PERMIT SUBMITTAL. |
| | |
| | TRACY WARD, PE |
| | SENIOR STORMWATER ENGINEER |
| | ENGINEERING SERVICES DEPARTMENT |
| | 561-494-1120 (O) |
| | [email protected] |
| | |
| |