| 2023-05-10 16:41:20 | THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL |
| | DETAILS, DESIGN CALCULATIONS AND THE POLLUTION |
| | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE |
| | ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT |
| | APPLICATION PROCESSES. |
| | |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE |
| | PLAN APPROVAL: |
| | |
| | 1. IT APPEARS THE DEVELOPMENT WILL ENCROACH INTO THE |
| | IBIS BLVD TRACT, WHICH IS OWNED BY NPBCID. THIS IS NOT |
| | MENTIONED IN THE JUSTIFICATION STATEMENT. WILL A LAND |
| | SWAP OR TRANSFER BE FACILITATED BETWEEN NPBCID AND THE |
| | CLUB AT IBIS PROPERTY OWNERS ASSOCIATION, INC.? |
| | |
| | 2. THE SITE PLAN SHOWS A 6-FT WALL AND 5-FT WIDE |
| | SIDEWALK ALONG THE WEST BOUNDARY OF IBIS BLVD. THESE |
| | PROPOSED IMPROVEMENTS NEED TO BE DARKER ON THE |
| | ENGINEERING PLANS. |
| | |
| | 3. SHOW HOW THE NORTH END OF THE 5-FT SIDEWALK WILL |
| | CONNECT TO THE EXISTING SIDEWALK. |
| | |
| | 4. SUGGEST MOVING THE 5-FT SIDEWALK AWAY FROM THE |
| | EXISTING CATCH BASINS. |
| | |
| | 5. IDENTIFY WHERE NPBCID'S LAKES WILL BE ENLARGED TO |
| | OFFSET THE FILLING OF LAKE 1 FOR THE PROPOSED |
| | DEVELOPMENT. STAFF IS UNABLE TO FIND THE LAKES OR |
| | HERITAGE GOLF COURSE ON THE IBIS MASTER PLAN. |
| | |
| | 6. ADJUST LEADER FOR HEADWALL-01 ON SHEET C-03. |
| | |
| | 7. WILL A HEADWALL BE NEEDED FOR THE NORTH END OF THE |
| | PIPE FROM STRUCTURE S-02? |
| | |
| | 8. NO PROPOSED GRADING PROVIDED. |
| | |
| | 9. PROVIDE FINISHED FLOOR ELEVATION. |
| | |
| | 10. SHOW WHERE RUNOFF FROM PICKLEBALL COURTS, BOCCE |
| | COURTS, GOLF CART PARKING AND TRACT TT WILL ENTER THE |
| | DRAINAGE SYSTEM. |
| | |
| | 11. SUGGEST REDUCING THE AMOUNT OF IMPERVIOUS AREA BY |
| | PROVIDING 2 FEET OF LANDSCAPE OVERHANG AT THE ENDS OF |
| | THE PARKING SPACES AND REPLACING THE WHEEL STOPS WITH |
| | RAISED CURB WHERE THE PARKING SPACES ARE REDUCED IN |
| | LENGTH. |
| | |
| | 12. REVIEW CITY CODE 94-485 FOR PARKING SPACE STRIPING |
| | LAYOUT. |
| | |
| | 13. PROPOSED LEFT TURN LANE ON IBIS BLVD. WILL AFFECT |
| | EXISTING LIGHT POLE IN THE MEDIAN. |
| | |
| | |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO |
| | ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING |
| | BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL. |
| | |
| | 1. DRAINAGE SYSTEM TO BE DESIGNED TO MEET SFWMD ERP |
| | CRITERIA. STORMWATER CALCULATIONS WILL BE REVIEWED WITH |
| | THE ENGINEERING PERMIT SUBMITTAL. |
| | |
| | 2. PROVIDE COPY OF SFWMD ERP MODIFIED PERMIT BEFORE |
| | START OF CONSTRUCTION. |
| | |
| | 3. PROVIDE COPY OF NPBCID PERMIT BEFORE START OF |
| | CONSTRUCTION. |
| | |
| | 4. PROVIDE EROSION AND SEDIMENT CONTROL PLAN WITH THE |
| | ENGINEERING PERMIT SUBMITTAL. |
| | |
| | |