Plan Review Notes
Plan Review Notes For Project Z23030018
Project Number Z23030018
Review Stop STORM
Sequence Number 1
Notes
Date Text
2023-04-12 18:47:20THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL
 DETAILS, DESIGN CALCULATIONS AND THE POLLUTION
 PREVENTION PLAN WILL BE REVIEWED AS PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT
 APPLICATION PROCESSES.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE
 PLAN APPROVAL:
  
 1. NO SURVEY WAS PROVIDED. WHEN IT IS PROVIDED, IT
 NEEDS TO LIST THE VERTICAL DATUM AND CONVERSION
 EQUATION BETWEEN THE VERTICAL DATUM AND NGVD1929, THE
 CITY'S OFFICIAL VERTICAL DATUM PER CITY CODE.
  
 2. HARDSCAPE PLAN AND CIVIL PLAN DO NOT MATCH. THE
 PARKING AREA ON THE CIVIL PLAN IS FURTHER WEST.
  
 3. SUGGEST REPLACING THE TYPE F CURB AND GUTTER IN THE
 BACK OF THE PARKING AREA WITH TYPE D CURB. THE PARKING
 AREA SLOPES TO THE VALLEY GUTTER.
  
 4. HARDSCAPE PLAN SHOWS THE VALLEY GUTTER UNDERNEATH
 PAVERS BUT THE CIVIL PLANS DO NOT SHOW THIS FOR 7TH
 STREET NOR ON THE PLANS FOR N. RAILROAD AVE.
  
 5. SHOW ON THE CIVIL PLANS THE LIMITS OF PROPOSED
 IMPROVEMENTS TO BE APPROVED WITH THIS SITE PLAN
 AMENDMENT APPLICATION.
  
 6. SHOW THE SOUTH AND WEST RIGHT OF WAY LINES FOR 7TH
 ST ON THE CIVIL PLANS.
  
 7. ON THE NORTH SIDE OF 7TH ST, TWO SETS GUTTERS ARE
 DRAWN.
  
 8. PROVIDE CCTV OF THE EXISTING 18-INCH RCP ON 7TH
 STREET IF NOT PREVIOUSLY PROVIDED.
  
 9. SHOW THE LOCATION OF THE RAILROAD TIE ON SECTION A
 AND SECTION B ON SHEET C2.1.
  
 10. NO SIDEWALK SHOWN ON THE SOUTH SIDE OF 7TH ST. IF
 NEEDED, CONSIDER PLACING AT THE SOUTH R/W LINE.
  
 11. INCLUDE IN THE LEGEND ON SHEET C1.1, THE NET HATCH
 PATTERN (SHOWN AT THE WEST END OF 7TH ST.).
  
 12. SHOW THE EXISTING STORM MANHOLE AND SEWER MANHOLE
 IN THE WEST END OF 7TH ST.
  
 13. LABEL 6TH ST.
  
 14. ON SHEET L4-100 THE CROSS WALK ACROSS 6TH ST DOES
 NOT ALIGN WITH THE ADA MAT ON THE SOUTHWEST CORNER OF
 7TH ST AND 6TH ST.
  
 15. ON SECTION A, ARE THE LEAD WALKS THE CURB RAMPS?
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL.
  
 1. DRAINAGE SYSTEM TO BE DESIGNED TO MEET SFWMD ERP
 CRITERIA. STORMWATER CALCULATIONS WILL BE REVIEWED WITH
 THE ENGINEERING PERMIT SUBMITTAL.
  
 2. PROVIDE COPY OF SFWMD ERP PERMIT BEFORE START OF
 CONSTRUCTION.
  
 3. PROVIDE EROSION AND SEDIMENT CONTROL PLAN WITH THE
 ENGINEERING PERMIT SUBMITTAL.
  
  
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120 (O)
 [email protected]
  