2023-08-03 18:02:29THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE
 5/11/23 SUBMITTAL:
  
 1. [PARTIALLY SATISFIED - INCLUDE THE REMOVAL HATCHING
 ON ALL OF THE PLAN SHEETS.] CROSS HATCH THE UTILITIES
 THAT ARE TO BE REMOVED.
  
 2. [SATISFIED] HATCH SIDEWALKS, CURBS, ETC. THAT WILL
 BE REMOVED OR REPLACED.
  
 3. [PARTIALLY SATISFIED - NOT ALL DRAINAGE STRUCTURES
 ADJUSTED TO THE NEW CURB LINE] REMOVE DRIVEWAY APRONS
 THAT WILL NOT BE INCORPORATED INTO THE DEVELOPMENT AND
 RESTORE THE CURB OR CURB AND GUTTER ALONG THE EDGE OF
 ROAD PAVEMENT. RELOCATE ANY DRAINAGE STRUCTURES INTO
 THE NEW CURB LINE.
  
 4 [PARTIALLY SATISFIED - LABEL FM ON PONCE DE LEON AND
 EXISTING STORM PIPES WITHIN THE RIGHT OF WAY]. LABEL
 UTILITIES (SIZE AND MATERIAL) IN THE RIGHT OF WAY.
  
 5. [SATISFIED] NUMBER THE DRAINAGE STRUCTURES FOR EASE
 OF REFERENCE.
  
 6. [SATISFIED] THE MANHOLES IN THE PEDESTRIAN PATHS
 POSE A TRIPPING HAZARD. CONSIDER MOVING THE MANHOLES
 INTO THE LANDSCAPE AREAS.
  
 7. [NOT SATISFIED] SHOW SYMBOLS FOR EXISTING DRAINAGE
 STRUCTURES AND LIST ON THE SHEET THE RIM/GRATE
 ELEVATION AND INVERT ELEVATIONS.
  
 8. [SATISFIED] SITE IS WITHIN A SPECIAL FLOOD HAZARD
 AREA. STRUCTURES ARE TO HAVE A MINIMUM OF 2 FEET OF
 FREEBOARD ABOVE THE BASE FLOOD ELEVATION.
  
 9. [SATISFIED] PROVIDE TOP AND BOTTOM TRENCH ELEVATIONS
 ON THE EXFILTRATION TRENCH DETAIL.
  
 10. [SATISFIED] THE CITY DOES NOT ALLOW BLEEDERS WITH
 EXFILTRATION TRENCHES.
  
 11. [SATISFIED. IF NOTE #3 ON THE PAVING AND GRADING
 PLAN WAS ADDED TO ADDRESS THIS COMMENT PLEASE NOTE THAT
 THIS COMMENT RELATES TO FEDERAL HIGHWAY ADMINISTRATION
 RULINGS AND IS NOT RELATED TO THE FLORIDA BUILDING CODE
 SO THE BUILDING OFFICIAL WOULD NOT BE THE ONE TO
 ENFORCE THIS.] CURB RAMPS ARE TO BE BROUGHT UP TO
 CURRENT ADA REQUIREMENTS IF THE ASPHALT PAVEMENT
 ADJACENT TO THE RAMP IS MODIFIED IN ANY WAY. THIS
 APPLIES TO ALL CURB RAMPS, INCLUDING ONES THAT ARE ON
 THE OPPOSITE SIDE OF THE STREET.
  
 12. [NOT SATISFIED] INCLUDE IN THE LEGEND ON SHEET C3
 (PDG PLAN) THE DIFFERENT HATCH PATTERNS SHOWN ON THE
 SHEET.
  
 13. [SATISFIED] PROVIDE CROSS SECTIONS AT ALL
 DRIVEWAYS, ON-STREET PARKING AREAS, MID-BLOCK FOR ALL
 STREETS. LABEL THE STREET, R/W LINE, SIDEWALKS, CURBS,
 ETC. DIMENSION THE DISTANCE FROM THE R/W LINE TO MAJOR
 SURFACE FEATURES SUCH AS BACK OF CURB, EDGE OF
 PAVEMENT, FRONT OR BACK OF SIDEWALK (PROVIDE SIDEWALK
 WIDTH), FACE OF BUILDING, HIGH POINTS IN DRIVEWAYS.
 PROVIDE ARROWS SHOWING GENERAL DIRECTION OF SURFACE
 SLOPES. LABEL THE CURB TYPES.
  
  
 14. [PARTIALLY SATISFIED - IDENTIFY ON THE DRAINAGE
 PLAN THE LOCATION(S) OF ANY UNDERGROUND STORMWATER
 STORAGE TANKS] WHERE WILL THE BUILDING ROOF DRAINS
 CONNECT TO?
  
 15. [SATISFIED] THE EXISTING DRAINAGE SYSTEM IN THE
 INTERSECTION OF N. FLAGLER DR. AND 23RD ST DOES NOT
 APPEAR TO BE SHOWN IN THE CORRECT LOCATION.
  
 16. [SATISFIED] CAN THE SCALE OF THE ENGINEERING PLANS
 BE CHANGED TO 1-INCH EQUALS 30 FEET TO MATCH SCALE OF
 THE LANDSCAPE PLANS?
  
 17. [SATISFIED - IT APPEARS THE CONTOUR LINES WERE
 REMOVED] VERTICAL PROFILE OF THE MULTI-PURPOSE PATH
 SHOULD CLOSELY FOLLOW PROFILE OF N. FLAGLER DR AND THE
 CROSS SLOPE SHALL NOT EXCEED 2 PERCENT CROSS SLOPE. THE
 CONTOUR LINES WILL NEED TO BE REVISED.
  
 18. [NOT SATISFIED] SHOW MILL AND RESURFACING LIMITS ON
 THE PGD PLAN.
  
 19. [SATISFIED] A CURB INLET AND PIPE WILL BE NEEDED ON
 PONCE DE LEON TO COLLECT STORMWATER WATER RUNOFF BEFORE
 23RD ST.
  
 20. [SATISFIED] STORM PIPE WITHIN THE RIGHT OF WAY
 SHALL BE RCP, MINIMUM 15 INCHES IN DIAMETER.
 JUSTIFICATION WILL BE NEEDED FOR ANY OUTFALL PIPE
 LARGER THAN 15-INCH.
  
 21. [SATISFIED] CREATE DEPRESSIONS IN THE LANDSCAPE
 AREAS TO COLLECT STORMWATER RUNOFF.
  
 22. [PARTIALLY SATISFIED - CONTACT THE EOR (MCLEOD
 MCCARTHY AND ASSOC.) ABOUT GETTING THEIR LATEST PLANS]
 SHOW THE EXISTING IMPROVEMENTS FOR THE SOUTHWEST CORNER
 OF THE INTERSECTION OF BROWARD AVE AND PICADILLY
 STREET.
  
 23. [SATISFIED] COORDINATE LOCATION OF TREES WITH THE
 UNDERGROUND UTILITIES. SHOW LOCATIONS OF ROOT BARRIERS
 ON THE LANDSCAPE PLANS.
  
 NEW COMMENTS (5/11/2023 SUBMITTAL)
  
 24. DESIGN TYPE F CURB AND GUTTER ALONG ALL SIDES OF
 THE DEVELOPMENT AND DROP CURB/VALLEY GUTTER ACROSS THE
 DRIVEWAYS. BACK OF PROPOSED CURB TO MATCH THE SAME
 HORIZONTAL LOCATION OF THE BACK OF THE EXISTING CURB.
  
 25. WHAT WILL BE THE SLOPE OF THE LANDSCAPE AREA ALONG
 23RD STREET AT ITS NARROWEST LOCATION? IF SHOULD NOT BE
 STEEPER THAN 4:1. PROVIDE SPOT GRADES FOR THE FRONT OF
 SIDEWALK AT THESE NARROW LANDSCAPE AREAS.
  
 26. THE EXISTING CURB INLET AT THE NORTHWEST CORNER OF
 PICADILLY STREET AND BROWARD AVE WILL NEED TO BE
 RELOCATED TO THE NEW CURB LINE AND PIPED TO THE NEW
 MANHOLE STRUCTURE BEING INSTALLED BY THE BROWARD APTS.
 CONTRACTOR.
  
 27. MAINTENANCE AGREEMENT WILL BE REQUIRED FOR THE
 PAVER DRIVEWAY WITHIN THE R/W.
  
 28. EXPLAIN/LABEL THE V-SHAPED DRIVEWAY(?) ON PICADILLY
 STREET AT THE MIDPOINT OF THE SOUTH TOWER. IF IT IS A
 DRIVEWAY, THE APRON IS TO BE CONCRETE WITHIN THE RIGHT
 OF WAY. IF A DRIVEWAY, PROVIDE A CROSS SECTION PER
 COMMENT #13 ABOVE FROM THE CENTERLINE OF OF PICADILLY
 STREET TO THE BACK OF THE ROOM (APPROX. 73 FEET FROM
 THE PROPERTY LINE).
  
 29. PROVIDE VERTICAL CLEARANCE BETWEEN PROPOSED
 STORMWATER PIPES AND THE EXISTING FM ON 23RD ST. LIST
 TOP AND BOTTOM ELEVATIONS OF THE PIPES.
  
 30. HOW WILL THE STORMWATER RUNOFF ON THE DRIVEWAY TO
 N. FLAGLER DRIVE BE CAPTURED BEFORE THE R/W LINE?
  
 31. DRAINAGE DESIGN SHOULD CONSIDER THE SEA LEVEL RISE
 AFFECTS ON THE GROUNDWATER TABLE.
  
 31. IT APPEARS TREES ARE PROPOSED OVER THE EXISTING GAS
 MAIN ALONG PONCE DE LEON.
  
 32. SHOW THE DRAINAGE SYSTEM FOR THE GARAGE AND WHERE
 IT TIES INTO THE ONSITE DRAINAGE SYSTEM.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120 (O)
 [email protected]
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved