| Plan Review Notes For Project Z23020026 |
| Project Number |
Z23020026 |
|
| Review Stop |
PU-CS |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2023-05-15 16:22:47 | PLEASE PROVIDE WRITTEN RESPONSES TO THE FOLLOWING: | | | -FDC TO THE NORTHEAST APPEARS TO BE INSTALLED | | | INCORRECTLY. IT IS INSTALLED UPSTREAM OF THE FIRELINE | | | BACKFLOW ASSEMBLY, WHEREAS USUALLY IT IS INSTALLED | | | DOWNSTREAM. | | | -IN PRIOR RESPONSE LETTER, FOR: VERIFY PRIVATE FIRE | | | SYSTEM WILL NOT HAVE ANY ADDED CHEMICALS OR AUXILIARY | | | WATER SOURCES SUCH AS WELLS OR TANKS, RECEIVED THE | | | FOLLOWING RESPONSE: COMMENT NOTED. RESPONSE WAS | | | INSUFFICIENT. NEED CONFIRMATION IF PRIVATE FIRE SYSTEM | | | WILL HAVE ANY ADDED CHEMICALS OR AUXILIARY WATER | | | SOURCES SUCH AS WELLS OR TANKS. IF NOT, DCDA TYPE IS | | | FINE. | | | -PROPERTY OWNER WOULD BE REQUIRED TO RECORD BACKFLOW | | | COVENANT AS A CONDITION OF WATER SERVICE. | | | -FIRELINE BACKFLOW ASSEMBLY INSTALLATION INSIDE | | | BUILDING AND ASSOCIATED PIPING AND COMPONENTS UPSTREAM | | | OF IT MUST COMPLY WITH ALL WPB PUBLIC UTILITIES AND | | | ENGINEERING DEPARTMENTS REQUIREMENTS. ALL PIPING | | | UPSTREAM OF FIRELINE BACKFLOW ASSEMBLY NEED BE DUCTILE | | | IRON PIPE, AND INSTALLATION MUST MEET REQUIREMENTS OF | | | WATER SERVICE STANDARD DETAIL WS5. PLEASE NOTIFY FIRE | | | SYSTEM DESIGNER OF THIS REVIEW COMMENT NOW DURING PPRC | | | AND WILL REVIEW FURTHER AT ENGINEERING DEVELOPMENT | | | SUBMITTAL. | | | RESPECTFULLY, | | | MARK HURLEY [email protected] |
| |
Print |
|