| 2023-03-03 10:44:43 | PLEASE PROVIDE WRITTEN RESPONSES TO THE FOLLOWING: |
| | -SURVEYS SHOW VARIOUS EXISTING EASEMENTS ON THE |
| | PROPERTY INCLUDING A WATER AND SEWER UTILITY EASEMENT. |
| | WHAT IS HAPPENING TO THE EASEMENTS, AND ARE THERE |
| | CURRENTLY ANY WATER AND SEWER UTILITIES IN THE FIVE |
| | FOOT WATER AND SEWER EASEMENT? |
| | -COOLING TOWERS CANNOT BE FED FROM FIRELINES. |
| | -A1.7, A1.8, A4.1, AND Z7.0 SHOW WATER TANKS. WHAT ARE |
| | THEY USED FOR AND WILL THEY BE CONNECTED TO ANY OF THE |
| | PLUMBING OR FIRE SYSTEMS? |
| | -SHOW AND LABEL ALL EXISTING AND PROPOSED EASEMENTS ON |
| | CIVIL ENGINEERING PLANS. |
| | -SHOW AND LABEL WATER METERS AND BACKFLOW ASSEMBLIES ON |
| | CIVIL ENGINEERING PLANS. |
| | -DOMESTIC WATER METERS TO BE INSTALLED ABOVE-GROUND, |
| | OUTSIDE OF BUILDING, AND ADJACENT PROPERTY LINE. |
| | -LABEL DOMESTIC BACKFLOW ASSEMBLIES WITH RP TYPE AND |
| | SIZE. |
| | -WILL DOMESTIC METER BE USED FOR IRRIGATION? IF NOT, IS |
| | SEPARATE METERED IRRIGATION WATER SERVICE NEEDED? |
| | -SHOW AND LABEL GREASE TRAPS AND TRANSFORMERS ON |
| | ENGINEERING PLANS IF THEY WILL BE OUTSIDE OF BUILDING. |
| | -SHOW AND LABEL FDC IF THEY ARE NEEDED OR REQUIRED. |
| | ENSURE THEY ACCEPTABLE DISTANCE TO FIRE HYDRANTS. |
| | -VERIFY PRIVATE FIRE SYSTEM WILL NOT HAVE ANY ADDED |
| | CHEMICALS OR AUXILIARY WATER SOURCES SUCH AS WELLS OR |
| | TANKS. |
| | -WATER METERS 8 INCHES AND LARGER ARE NOT STOCKED AND |
| | HAVE TO BE ORDERED AFTER UTILITY QUOTE IS PAID. LEAD |
| | TIMES MAY BE OVER 6 MONTHS FROM TIME OF PAYMENT. |
| | -WATER METERS 6 INCH OR LARGER NEED TO BE ACCESSIBLE |
| | AND REPLACEABLE BY FORD F350 CRANE TRUCK. |
| | -SHOW UTILITIES FROM ENGINEERING PLAN ON LANDSCAPING |
| | PLAN AND ENSURE NO CONFLICTS BETWEEN UTILITIES AND |
| | LANDSCAPING. |
| | -NORTHEAST FIRELINE IS EXCESSIVELY LONG. BACKFLOW |
| | ASSEMBLY SHOULD BE CLOSER TO TAP THAN BUILDING. ALSO |
| | ENSURE FIRELINE IS ON PROPERTY LINE AND NOT IN NORTH |
| | RIGHT OF WAY. |
| | -SHOW EXISTING METERED WATER SERVICES ON DEMO PLAN. |
| | -ALL INSTALLED CONTAINMENT BACKFLOW ASSEMBLIES MUST BE |
| | LEAD-FREE AND USC-APPROVED (BY SIZE, MAKE, MODEL, |
| | ORIENTATION, VALVING, AND BYPASS). |
| | -MANY OF THE SURROUNDING STREETS WILL NEED PAVEMENT |
| | RESTORATION DUE TO UTILITY WORK. |
| | -C10 HAS DUPLICATE STANDARD DETAILS. PLEASE ELIMINATE |
| | THE DUPLICATE. |
| | -ADD WATER SERVICES STANDARD DETAILS WS2, WS5, WS7 TO |
| | ENGINEERING PLAN SET. |
| | -EXISTING FIRE HYDRANT ACROSS FROM BROWARD AVE APPEARS |
| | TO BE IN MIDDLE OF PROPOSED WALKWAY. |
| | -SHOW AND LABEL WHAT IS HAPPENING TO EXISTING UTILITY |
| | POLES AT SOUTH SIDE OF PROPERTY. |
| | -EXISTING WATER MAIN LAYOUT SHOWN ON PONCE DE LEON |
| | SHOWN ON C5 MAY NOT BE ACCURATE. REFERENCE WATER DESIGN |
| | RECORDS FROM 312 23RD ST. |
| | |