Date Text
2023-02-09 09:49:58THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL
 DETAILS, DESIGN CALCULATIONS AND THE POLLUTION
 PREVENTION PLAN WILL BE REVIEWED AS PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT
 APPLICATION PROCESSES.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE
 PLAN APPROVAL:
  
 1. THE CITY'S OFFICIAL VERTICAL DATUM PER CITY CODE IS
 NGVD1929. THE NAVD1988 VERTICAL DATUM MAY BE USED IF
 THE CONVERSION EQUATION BETWEEN NAVD1988 AND NGVD1929
 IS PROVIDED. ON EVERY SHEET WITH ELEVATION INFORMATION,
 LIST THE VERTICAL DATUM REFERENCE AND THE CONVERSION
 EQUATION TO NGVD1929 IF DIFFERENT FROM NGVD1929.
  
 2. THE SITE IS WITHIN A SPECIAL FLOOD HAZARD AREA
 (SFHA) ZONE A WITH AN INDETERMINATE BASE FLOOD
 ELEVATION. STRUCTURES LOCATED WITHIN A SFHA ARE TO HAVE
 TWO FEET OF FREEBOARD ABOVE THE BASE FLOOD ELEVATION.
  
 3. PARKING SPACE STRIPING DIMENSIONS DO NOT MEET CITY
 CODE. SEE SECTION 94-485 OF THE CODE OF ORDINANCES.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL.
  
 1. PROVIDE COPY OF SFWMD ERP MODIFICATION BEFORE START
 OF CONSTRUCTION.
  
 2. PROVIDE EROSION AND SEDIMENT CONTROL PLAN WITH THE
 ENGINEERING PERMIT SUBMITTAL.
  
  
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120 (O)
 [email protected]
 ===============================================
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved