| Plan Review Notes For Project Z23010016 |
| Project Number |
Z23010016 |
|
| Review Stop |
STORM |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2023-04-12 19:22:13 | THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL | | | DETAILS, DESIGN CALCULATIONS AND THE POLLUTION | | | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE | | | ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT | | | APPLICATION PROCESSES. | | | | | | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE | | | PLAN APPROVAL: | | | | | | 1. PROPOSED SIDEWALK AND PARKING TO DRAIN TO INTERNAL | | | DRAINAGE SYSTEM AND NOT TOWARDS THE CANAL. | | | | | | 2. EXPLAIN WHAT THE DOUBLE STACKED SPOT GRADES | | | REPRESENT AS SHOWN ON SHEET SP1 OF 1. EXAMPLES OF THESE | | | DOUBLE STACKED GRADES ARE 17.80/17.00, 17.70/16.20, | | | 17.50/16.00, 17.60/16.10. | | | | | | 3. PROVIDE VERTICAL DATUM AND CONVERSION TO NGVD1929 ON | | | SHEET SP1 OF 1. THE CITY???S OFFICIAL VERTICAL DATUM | | | PER CITY CODE IS NGVD1929. | | | | | | 4. NO CIVIL PLANS WERE PROVIDED. | | | | | | TRACY WARD, PE | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | 561-494-1120 (O) | | | [email protected] | | | |
| |
Print |
|