| Plan Review Notes For Project Z22120020 |
| Project Number |
Z22120020 |
|
| Review Stop |
PU-CS |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2023-02-24 11:38:24 | PLEASE PROVIDE WRITTEN RESPONSES TO THE FOLLOWING: | | | -FIRE HYDRANT, FIRELINE BACKFLOW ASSEMBLY, AND FDC ARE | | | PROPOSED TO BE LOCATED IN 12 FOOT BICYCLE PATH | | | EASEMENT. PLEASE VERIFY THAT IS ACCEPTABLE AND WILL NOT | | | CONFLICT WITH ANY EASEMENT STIPULATIONS. | | | -FIRE HYDRANT AND SOME PORTIONS OF FIRELINE ARE IN THE | | | 20 FOOT EASEMENT. PLEASE PROVIDE MORE INFORMATION ABOUT | | | THE EASEMENT INCLUDING WHAT TYPE IT IS AND WHAT IT IS | | | USED FOR. ALSO VERIFY THE FIRE COMPONENTS DO NOT | | | CONFLICT WITH ANY EASEMENT STIPULATIONS. | | | -AT ENGINEERING DEVELOPMENT SUBMITTAL: ADDITIONAL | | | EASEMENTS MAY BE REQUIRED; ENGINEERING PLAN DESIGN MAY | | | NEED REVISION. | | | -FIRELINE BACKFLOW ASSEMBLY NEEDS TO BE RPDA TYPE, | | | LEAD-FREE, AND USC APPROVED. ENSURE FIRE PLAN DESIGNERS | | | ARE AWARE OF THE REQUIREMENTS. | | | RESPECTFULLY, | | | MARK HURLEY [email protected] |
| |
Print |
|